El Dorado Nitrogen, LP - Nitrous Oxide Abatement Project
Chemical Processes · N2O Destruction in Nitric Acid Production · United States
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- EPA Office of Air and Radiation: Available and Emerging Technologies for Reducing GHG Emissions from the Nitric Acid Production Industry (December 2010) — directly references El Dorado Nitrogen LP BayDownload →other · hosted copy · 545 KB
- CAR Variance Tracking Public Document (January 21, 2011) — confirms two protocol variances granted to CAR639Download →other · hosted copy · 10 KB
- SEC Exhibit 10.2 — Second Amendment to Nitric Acid Supply, Operating and Maintenance Agreement (El Dorado Nitrogen LP / El Dorado Chemical Co. / Bayer MaterialScience LLC), incorporating N2O project aDownload →other · hosted copy · 40 KB
- EPA Clean Air Act Settlement — El Dorado Chemical Co. et al. (LSB Industries and El Dorado Nitrogen Company, March 2014)Download →other · hosted copy · 66 KB
- Verification-Opinion - El Dorado 6.24.2025-4.11.2026_final.pdf (Verification Opinion, 2026)Download →verification · hosted copy · 285 KB
- CAR639 Social Environmental Safeguards Assessment-RP28.pdf (Safeguards Reporting Form, 2026)Open →other · source link
- CAR639 RP28 U.S.-Nitric-Acid-Production-Project-Data-Report.pdf (Project Data Report, 2026)Download →monitoring · hosted copy · 399 KB
- 2026-SDG-REPORTING-TOOL-CAR639.pdf (SDG Reporting Tool, 2026)Open →other · source link
- Verification Report - El Dorado 6.24.2025-4.11.2026_final.pdf (Verification Report, 2026)Download →verification · hosted copy · 931 KB
- EDN-CAR639-Attestation-Voluntary-Implementation-RP28.pdf (Attestation of Voluntary Implementation, 2026)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP28.pdf (Attestation of Regulatory Compliance, 2026)Open →other · source link
- EDN-CAR639-Attestation-Title-RP28.pdf (Attestation of Title, 2026)Open →other · source link
- Verification-Opinion - El Dorado 10.4.2024-6.23.2025 - Final_signed.pdf (Verification Opinion, 2025)Download →verification · hosted copy · 219 KB
- Verification Report - El Dorado 10.4.2024-6.23.2025_r1.pdf (Verification Report, 2025)Download →verification · hosted copy · 745 KB
- RP27 CAR639 Project Data Report.pdf (Project Data Report, 2025)Download →monitoring · hosted copy · 199 KB
- CAR639 Social Environmental Safeguards Assessment-RP27.pdf (Other, 2025)Open →other · source link
- 2025-SDG-REPORTING-TOOL-CAR639.pdf (SDG Reporting Tool, 2025)Open →other · source link
- LSB Baytown CAR639 Diagram_Hybrid.pptx (Project Diagram, 2025)Open →other · source link
- EDN-CAR639-Attestation-Voluntary-Implementation-RP27_Signed.pdf (Attestation of Voluntary Implementation, 2025)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP27_Signed.pdf (Attestation of Regulatory Compliance, 2025)Open →other · source link
- EDN-CAR639-Attestation-Title-RP27_Signed.pdf (Attestation of Title, 2025)Open →other · source link
- Verification-Opinion-2024 - El Dorado 2.19.2024 - 10.3.2024_r2_signed.pdf (Verification Opinion, 2024)Download →verification · hosted copy · 226 KB
- Verification Report - El Dorado 2.19.2024 - 10.3.2024_r2.pdf (Verification Report, 2024)Download →verification · hosted copy · 639 KB
- EDN-CAR639-Attestation-Voluntary-Implementation-RP26.pdf (Attestation of Voluntary Implementation, 2024)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP26.pdf (Attestation of Regulatory Compliance, 2024)Open →other · source link
- EDN-CAR639-Attestation-Title-RP26.pdf (Attestation of Title, 2024)Open →other · source link
- CAR639 El Dorado RP 25 VS v3.pdf (Verification Opinion, 2023)Download →verification · hosted copy · 263 KB
- CAR639 El Dorado RP 25 VR v3.pdf (Verification Report, 2023)Download →verification · hosted copy · 403 KB
- EDN-CAR639-Attestation-Voluntary-Implementation-RP25.pdf (Attestation of Voluntary Implementation, 2024)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP25.pdf (Attestation of Regulatory Compliance, 2024)Open →other · source link
- EDN-CAR639-Attestation-Title-RP25.pdf (Attestation of Title, 2024)Open →other · source link
- CAR639 El Dorado VS Final.pdf (Verification Opinion, 2023)Download →verification · hosted copy · 302 KB
- CAR639 El Dorado VR Final.pdf (Verification Report, 2023)Download →verification · hosted copy · 455 KB
- EDN-CAR639-Attestation-Voluntary-Implementation-RP24-S.pdf (Attestation of Voluntary Implementation, 2023)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP24-S.pdf (Attestation of Regulatory Compliance, 2023)Open →other · source link
- EDN-CAR639-Attestation-Title-RP24-S.pdf (Attestation of Title, 2023)Open →other · source link
- CAR639 El Dorado Verification Statement - RTF.pdf (Verification Opinion, 2022)Download →verification · hosted copy · 224 KB
- CAR639 El Dorado Verification Report - RTF.pdf (Verification Report, 2022)Download →verification · hosted copy · 447 KB
- EDN_CAR639_Attestation-Voluntary-Implementation_RP23_Executed.pdf (Attestation of Voluntary Implementation, 2022)Open →other · source link
- EDN_CAR639_Attestation-Regulatory-Compliance_RP23_Executed.pdf (Attestation of Regulatory Compliance, 2022)Open →other · source link
- EDN_CAR639_Attestation-Title_RP23_Executed.pdf (Attestation of Title, 2022)Open →other · source link
- CAR639 El Dorado Final Verification Report.pdf (Verification Report, 2022)Download →verification · hosted copy · 451 KB
- CAR639 El Dorado Verification Statement 1.0.pdf (Verification Opinion, 2022)Download →verification · hosted copy · 192 KB
- EDN-CAR639-Attestation-Voluntary-Implementation-RP22_SIGNED.pdf (Attestation of Voluntary Implementation, 2022)Open →other · source link
- EDN-CAR639-Attestation-Regulatory-Compliance-RP22_SIGNED.pdf (Attestation of Regulatory Compliance, 2022)Open →other · source link
- EDN-CAR639-Attestation-Title-RP22_SIGNED.pdf (Attestation of Title, 2022)Open →other · source link
- CAR639 Verification Report RP21 Final.pdf (Verification Report, 2021)Download →verification · hosted copy · 455 KB
- CAR639 Verification Statement RP21.pdf (Verification Opinion, 2021)Download →verification · hosted copy · 214 KB
- 2021-3-11-EXT-CIR-DET-CAR639.pdf (Other, 2021)Open →other · source link
- Attestation-Voluntary-Implementation RP20_08132021.pdf (Attestation of Voluntary Implementation, 2021)Open →other · source link
- Attestation-Regulatory-Compliance RP20_08132021.pdf (Attestation of Regulatory Compliance, 2021)Open →other · source link
- Attestation-Title RP20_08132021.pdf (Attestation of Title, 2021)Open →other · source link
- Verification-Statement_Climeco_EDN Camp 39_ 2021-07-15 v1.1 exec.pdf (Verification Opinion, 2021)Download →verification · hosted copy · 1,036 KB
- Verification_Report_Climeco-El_Dorado_camp 39_2021-07-15 v1.1.pdf (Verification Report, 2021)Download →verification · hosted copy · 254 KB
- 2020-12-2021-3-EXT-CIR-DET-CAR639.pdf (Other, 2021)Open →other · source link
- Verification-Statement_Climeco_EDN _2021-02-20 exec.pdf (Verification Opinion, 2020)Download →verification · hosted copy · 430 KB
- Verification_Report_Climeco-El_Dorado_camp 38_2021-02-22 .pdf (Verification Report, 2020)Download →verification · hosted copy · 253 KB
- Attestation-Voluntary-Implementation RP19 Signed.pdf (Attestation of Voluntary Implementation, 2020)Open →other · source link
- Attestation-Regulatory-Compliance RP19 Signed.pdf (Attestation of Regulatory Compliance, 2020)Open →other · source link
- Attestation-Title RP19-b Signed.pdf (Attestation of Title, 2020)Open →other · source link
- Verification Statement_EDN Camp 37_2020-10-28 exec.pdf (Verification Opinion, 2020)Download →verification · hosted copy · 437 KB
- Verification_Report_Climeco-El_Dorado_camp37_2020-10-27_IR_Final.pdf (Verification Report, 2020)Download →verification · hosted copy · 86 KB
- Attestation of Voluntary Implementation RP18 8-2020 S v2.pdf (Attestation of Voluntary Implementation, 2020)Open →other · source link
- Attestation of Voluntary Implementation RP18 8-2020 S.pdf (Attestation of Voluntary Implementation, 2020)Open →other · source link
- Attestation RC - 8-20 s.pdf (Attestation of Regulatory Compliance, 2020)Open →other · source link
- 2019-9-2020-6-EXT-CIRC-DET-CAR639.pdf (Other, 2020)Open →other · source link
- Verification Statement-EDN_Camp 36_2019-10-23 ver 2 exec.pdf (Verification Opinion, 2019)Download →verification · hosted copy · 197 KB
- Verification_Report_Climeco-El_Dorado_Rp17_ 2019-10-23 rev 1.1.pdf (Verification Report, 2019)Download →verification · hosted copy · 85 KB
- AOVI RP17 sig.pdf (Attestation of Voluntary Implementation, 2019)Open →other · source link
- AORC RP17 sig.pdf (Attestation of Regulatory Compliance, 2019)Open →other · source link
- AOT RP17 sig.pdf (Attestation of Title, 2019)Open →other · source link
- Verification_statement_EDN_Camp 35_2019-06-03_exec.pdf (Verification Opinion, 2019)Download →verification · hosted copy · 210 KB
- Verification_Report_Climeco-El_Dorado_RP16_2019-06-03 v1.1.pdf (Verification Report, 2019)Download →verification · hosted copy · 282 KB
- AVI RP16 r1.pdf (Attestation of Voluntary Implementation, 2019)Open →other · source link
- EDN_ARC_signed_RP16.pdf (Attestation of Regulatory Compliance, 2019)Open →other · source link
- EDN_AOT_signed_RP16.pdf (Attestation of Title, 2019)Open →other · source link
- Verification Statement- EDN_ Camp 34_2018-12-20 exec.pdf (Verification Opinion, 2018)Download →verification · hosted copy · 53 KB
- Verification_Report_Climeco-EL Dorado_RP15_2018-12-17.pdf (Verification Report, 2018)Download →verification · hosted copy · 281 KB
- Revized Project Diagram.pdf (Project Diagram, 2018)Open →other · source link
- EDN_ARC_RP15_Signed.pdf (Attestation of Regulatory Compliance, 2018)Open →other · source link
- EDN_AOT_RP15_Signed.pdf (Attestation of Title, 2018)Open →other · source link
- EDN_AVI_RP15_Signed.pdf (Attestation of Voluntary Implementation, 2018)Open →other · source link
- Verification Statement- EDNLP_ Camp 33_2018-08-17_Exec.pdf (Verification Opinion, 2018)Download →verification · hosted copy · 794 KB
- Verification_Report_Climeco-EL Dorado_RP14_Final_2018-08-17.pdf (Verification Report, 2018)Download →verification · hosted copy · 282 KB
- PROJECT DEVELOPERS ATTESTATION OF VOLUNTARY IMPLEMENTATION s.pdf (Attestation of Voluntary Implementation, 2018)Open →other · source link
- PROJECT DEVELOPERS ATTESTATION OF REGULATORY COMPLIANCE s.pdf (Attestation of Regulatory Compliance, 2018)Open →other · source link
- PROJECT DEVELOPERS ATTESTATION OF TITLE s.pdf (Attestation of Title, 2018)Open →other · source link
- Verification Statement- EDNLP_ Camp 32_2018-02-13 exec.pdf (Verification Opinion, 2017)Download →verification · hosted copy · 792 KB
- Verification_Report_Climeco-EL Dorado_RP13_2018-02-13_rev4.pdf (Verification Report, 2017)Download →verification · hosted copy · 287 KB
- PROJECT DEVELOPERS ATTESTATION OF VOLUNTARY IMPLEMENTATION.pdf (Attestation of Voluntary Implementation, 2017)Open →other · source link
- PROJECT DEVELOPERS ATTESTATION OF REGULATORY COMPLIANCE 1-3-18.pdf (Attestation of Regulatory Compliance, 2017)Open →other · source link
- Open →
- Verification_Report_Climeco-EL Dorado_RP12_2017-08-10 ver 1.1.pdf (Verification Report, 2016)Download →verification · hosted copy · 88 KB
- Verification Statement- EDNLP_ Camp 31_2017-08-10 exec.pdf (Verification Opinion, 2016)Download →verification · hosted copy · 73 KB
- ATTESTATION OF VOLUNTARY IMPLEMENTATION S.pdf (Attestation of Voluntary Implementation, 2016)Open →other · source link
- ATTESTATION OF REGULATORY COMPLIANCE S.pdf (Attestation of Regulatory Compliance, 2016)Open →other · source link
- PROJECT DEVELOPERS ATTESTATION OF TITLE S.pdf (Attestation of Title, 2016)Open →other · source link
- Verification_Report_Climeco-EL Dorado_RP11_ver.2.1_2017-01-20.pdf (Verification Report, 2016)Download →verification · hosted copy · 278 KB
- Verification Statement- EDNLP_ 2017-01-20 exec.pdf (Verification Opinion, 2016)Download →verification · hosted copy · 73 KB
- RP11Att of Vol Imp.pdf (Attestation of Voluntary Implementation, 2016)Open →other · source link
- RP11 Att of Reg Comp.pdf (Attestation of Regulatory Compliance, 2016)Open →other · source link
- RP11 Att of Title.pdf (Attestation of Title, 2016)Open →other · source link
- CAR639 Verification Report RP10 Final.pdf (Verification Report, 2016)Download →verification · hosted copy · 314 KB
- CAR639 Verification Statement RP10_Signed.pdf (Verification Opinion, 2016)Download →verification · hosted copy · 754 KB
- attestation of voluntary implementationvRP10 r2.pdf (Attestation of Voluntary Implementation, 2016)Open →other · source link
- attestation of regulatory compliance RP10 r2.pdf (Attestation of Regulatory Compliance, 2016)Open →other · source link
- attestation of title RP10 r2.pdf (Attestation of Title, 2016)Open →other · source link
- CAR639 Verification Report RP9 Final.pdf (Verification Report, 2015)Download →verification · hosted copy · 337 KB
- CAR639 Verification Statement_Signed.pdf (Verification Opinion, 2015)Download →verification · hosted copy · 34 KB
- Open →
- Att Vol Imp RP9 signed.pdf (Attestation of Voluntary Implementation, 2015)Open →other · source link
- Att Reg Comp RP9 signed.pdf (Attestation of Regulatory Compliance, 2015)Open →other · source link
- CAR639 Verification Report RP8 - Final 3.0.pdf (Verification Report, 2015)Download →verification · hosted copy · 338 KB
- CAR639 Verification Statement - RP8_Signed.pdf (Verification Opinion, 2015)Download →verification · hosted copy · 702 KB
- PROJECT DEV ATTESTATION OF VOL IMPLEMENTATION signed.pdf (Attestation of Voluntary Implementation, 2015)Open →other · source link
- PROJECT DEVELOPERS ATTESTATION REG COMPLIANCE signed.pdf (Attestation of Regulatory Compliance, 2015)Open →other · source link
- Open →
- CAR639 Verification Report - RP7_Final.pdf (Verification Report, 2014)Download →verification · hosted copy · 339 KB
- Att of Vol Imp Signed rev 092214.pdf (Attestation of Voluntary Implementation, 2014)Open →other · source link
- Att of Reg Comp Signed rev 092214.pdf (Attestation of Regulatory Compliance, 2014)Open →other · source link
- Att of Title Signed rev 092214.pdf (Attestation of Title, 2014)Open →other · source link
- CAR639 Verification Statement - RP7_Signed.pdf (Verification Opinion, 2014)Download →verification · hosted copy · 256 KB
- CAR639 RP6 Verification Report_Final.pdf (Verification Report, 2013)Download →verification · hosted copy · 314 KB
- 2013-12-12 Attestation-Voluntary-Implementation rev a signed.pdf (Attestation of Voluntary Implementation, 2013)Open →other · source link
- 2013-12-12 Attestation-Regulatory-Compliance rev a signed.pdf (Attestation of Regulatory Compliance, 2013)Open →other · source link
- 2013-12-12 Attestation-Title rev a signed.pdf (Attestation of Title, 2013)Open →other · source link
- CAR639 RP6 Verification Statement_Signed.pdf (Verification Opinion, 2013)Download →verification · hosted copy · 717 KB
- Verification Statement - CAR639 RP5_Signed.pdf (Verification Opinion, 2012)Download →verification · hosted copy · 57 KB
- Verification Report Final - CAR639 RP5.pdf (Verification Report, 2012)Download →verification · hosted copy · 312 KB
- 20121127-Attestation of Voluntary Implementation.pdf (Attestation of Voluntary Implementation, 2012)Open →other · source link
- 20121127-Attestation of Regulatory Compliance.pdf (Attestation of Regulatory Compliance, 2012)Open →other · source link
- 20121127 - Attestation of Title.pdf (Attestation of Title, 2012)Open →other · source link
- Verification Report Final - CAR639.pdf (Verification Report, 2012)Download →verification · hosted copy · 322 KB
- 2012-07-19 EDN Attestation of Vol Imp RP4 rev b signed.pdf (Attestation of Voluntary Implementation, 2012)Open →other · source link
- 2012-07-19 EDN Attestation of Reg Comp RP4 rev b signed.pdf (Attestation of Regulatory Compliance, 2012)Open →other · source link
- 2012-07-19 EDN Attestation of Title RP4 rev b signed.pdf (Attestation of Title, 2012)Open →other · source link
- Verification Statement Final - CAR639.pdf (Verification Opinion, 2012)Download →verification · hosted copy · 225 KB
- LSB N2O Verification Statement RP3 110711 .pdf (Verification Opinion, 2011)Download →verification · hosted copy · 62 KB
- Attestation_Of_Voluntary_Implementation_RP3 Update 110711.pdf (Attestation of Voluntary Implementation, 2011)Open →other · source link
- Attestation_Of_Regulatory_Compliance_RP3 Update 110711.pdf (Attestation of Regulatory Compliance, 2011)Open →other · source link
- Attestation_Of_Title_RP3 Updated 110711.pdf (Attestation of Title, 2011)Open →other · source link
- LSB N2O Verification Report RP3_Final_102811.pdf (Verification Report, 2011)Download →verification · hosted copy · 558 KB
- LSB N2O Verification Report RP2 Final.pdf (Verification Report, 2011)Download →verification · hosted copy · 352 KB
- LSB N2O Verification Statement RP2.pdf (Verification Opinion, 2011)Download →verification · hosted copy · 84 KB
- Attestation of Voluntary Implementation.pdf (Attestation of Voluntary Implementation, 2011)Open →other · source link
- Attestation of Regulatory Compliance.pdf (Attestation of Regulatory Compliance, 2011)Open →other · source link
- Attestation of Title.pdf (Attestation of Title, 2011)Open →other · source link
- LSB N2O Verification Report Final.pdf (Verification Report, 2010)Download →verification · hosted copy · 359 KB
- Attestation of Voluntary Implementation - co-signed.pdf (Attestation of Voluntary Implementation, 2010)Open →other · source link
- Attestation of Regulatory Compliance - co-signed.pdf (Attestation of Regulatory Compliance, 2010)Open →other · source link
- Attestation of Title co-signed.pdf (Attestation of Title, 2010)Open →other · source link
- LSB N2O Verification Opinion.pdf (Verification Opinion, 2010)Download →verification · hosted copy · 89 KB
- 2010-VAR2-DET-CAR639.pdf (Other, 2010)Open →other · source link
- 2010-VAR-DET-CAR639.pdf (Other, 2011)Open →other · source link
- EDNLP_Nitric Acid-N2O-Project-Diagram_ver2.pdf (Project Diagram, 2011)Open →other · source link
- EDNLP Project Submittal Form CAR_rev1.pdf (Project Submittal Form, 2011)Download →pdd · hosted copy · 92 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All N2O Destruction in Nitric Acid Production →- ATerra Verdigris #2United States
- ATerra Yazoo City # 9, Nitrous Oxide Abatement ProjectUnited States
- ACoffeyville NAP2United States
- ARentech Nitrogen, LLC - Nitric Acid Plant 2United States
- ARentech Energy Midwest Corporation – Nitric Acid Plant 1United States
- BBBCatalytic Reduction of N2O inside the Ammonia Burners of the Nitric Acid Plant in Caojing, ShanghaiChina