GS936 CookClean Ghana Limited - CPA01
Household & Community · Cookstoves · Ghana
CORSIA-approved programmeThis grade is generated by CarbonDecode's automated, documented rubric from public registry data and project-type priors. A project-specific analyst, document, or satellite review has not been run for this project, so the score reflects expected performance for its class rather than a bespoke due-diligence assessment. How our ratings are built →
This project has not issued credits yet. The rating anticipates type-level performance; it does not reflect realized issuance, retirements, or verified outcomes.
Dimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Soma–Polat Wind Farm Project CDM PDD v3.2 (22 Oct 2010) — analogous Turkish Gold Standard ACM0002 wind project, same consultant (Mavi Consultants), same methodology and grid; used as primary methodoloDownload →pdd · hosted copy · 1,752 KB
- Gold Standard Registry — Enerjisa Enerji Uretim Wind Plants listing (Enerjisa website, confirms Balıkesir plant in portfolio)Download →other · hosted copy · 184 KB
- (1)Monitoring Report_1st monitoring period_17-08-12 to 30-09-13_v2.0.pdf (Preliminary Review)Open →monitoring · source link
- (1)Monitoring Report_4th monitoring period_01.04.2016 to 31.10.2018_v6.doc (Preliminary Review)Open →monitoring · source link
- PDD_23-11-11.pdf (Preliminary Review)Open →pdd · source link
- (1)Verification Report_2nd monitoring period_01-10-13 to 30-04-15_v1.0.pdf (Preliminary Review)Open →verification · source link
- Verification Report_4th monitoring period_01.04.2016 to 31.10.2018_v4.pdf (Preliminary Review)Open →verification · source link
- PDD_16.11.2012_v3.doc (Preliminary Review)Open →pdd · source link
- (1)Monitoring Report_2nd monitoring period_01-10-13 to 30-04-15_v2.0.pdf (Preliminary Review)Open →monitoring · source link
- (1)Monitoring Report_3rd monitoring period_01-05-15 to 31-03-16_v4.0.pdf (Preliminary Review)Open →monitoring · source link
- (1)Verification Report_3rd monitoring period_01-05-15 to 31-03-16_v2.0.pdf (Preliminary Review)Open →verification · source link
- (1)Verification Report_1st monitoring period_17-08-12 to 30-09-13_v3.0.pdf (Preliminary Review)Open →verification · source link
- GS971 Local Stakeholder Consultation Report_v1.pdf (Preliminary Review)Open →other · source link
- GS Passport_24-01-13.doc (Preliminary Review)Open →other · source link
- PDD 23.11.2011_v1.pdf (Design Review)Open →pdd · source link
- GS971 Local Stakeholder Consultation Report Feedback 07.02.2011.pdf (Design Review)Open →other · source link
- PDD 16.11.2012_v3.doc (Design Review)Open →pdd · source link
- (1)GS971 Local Stakeholder Consultation Report_Evaluation Forms.pdf (Design Review)Open →other · source link
- GS971 Local Stakeholder Consultation Report Feedback 09.12.2010.pdf (Design Review)Open →other · source link
- (2)Verification Report_1st monitoring period_17-08-12 to 30-09-13_v3.0.pdf (Performance Review no. 1)Open →verification · source link
- (2)Monitoring Report_1st monitoring period_17-08-12 to 30-09-13_v2.0.pdf (Performance Review no. 1)Open →monitoring · source link
- (2)Monitoring Report_2nd monitoring period_01-10-13 to 30-04-15_v2.0.pdf (Performance Review no. 2)Open →monitoring · source link
- (2)Verification Report_2nd monitoring period_01-10-13 to 30-04-15_v1.0.pdf (Performance Review no. 2)Open →verification · source link
- (2)Verification Report_3rd monitoring period_01-05-15 to 31-03-16_v2.0.pdf (Performance Review no. 3)Open →verification · source link
- (2)Monitoring Report_3rd monitoring period_01-05-15 to 31-03-16_v4.0.pdf (Performance Review no. 3)Open →monitoring · source link
- (1)Verification Report_4th monitoring period_01.04.2016 to 31.10.2018_v4.pdf (Performance Review no. 4)Open →verification · source link
- (2)Monitoring Report_4th monitoring period_01.04.2016 to 31.10.2018_v6.doc (Performance Review no. 4)Open →monitoring · source link
- Final_Val Report_656 Balikesir wind_Seda Atabek_v01.2_14-07-2021.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- Annual Report 2021_BalıkesirWPP.pdf (Performance Review no. 5)Open →other · source link
- Final_MR_653 Balıkesir Wind_v6_13-10-2024_clean(1).pdf (Performance Review no. 5)Open →monitoring · source link
- Final_ER calculations_653 Balıkesir Wind_v07_04-12-2024(1).xlsx (Performance Review no. 5)Open →other · source link
- Balikesir_WPP-IRR_Calculation_v2_18.10.2012_gen.revised.xlsx (Performance Review no. 5)Open →other · source link
- Balıkesir_WPP-Project-Annual-Report.pdf (Performance Review no. 5)Open →other · source link
- Final_Ver Report_653 Balikesir Wind _Öykü Yakupoğlu_v04_05-11-2024_cl.pdf (Performance Review no. 5)Open →other · source link
- Bares-WPP-Annual-Report.pdf (Annual Report no. 1)Open →other · source link
- Final_PDD_656 Balıkesir wind_v9_08-09-2025_ clean.pdf (Design Change | With VVB no. 1)Open →pdd · source link
- Final_DCVal Report_1271 Balıkesir Wind_Kader ALKAÇ_v02_20-06-2025 a.pdf (Design Change | With VVB no. 1)Open →other · source link
- Final_ER calculations_1271 Bares wind_v06_08_09_ 2025.xls (Design Change | With VVB no. 1)Open →other · source link
- Final_SDG Impact Tool_1271 Bares wind_v03_19-06-2025a.xlsx (Design Change | With VVB no. 1)Open →other · source link
- Balikesir WPP_Annual Report.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Cookstoves →- BBBGS10884 - KOKO Kenya - Ethanol Cookstoves Program - CPA-0002Kenya
- BBBImproved Cookstoves for Social Impact in Ugandan CommunitiesUganda
- BBBFuel Efficient Cooking in South AfricaSouth Africa
- BBBDelAgua Clean Cooking Grouped Project in RwandaRwanda
- BBBGrouped Projects for Viet Nam Cookstove Program.Viet Nam
- BBBGyapa Cook Stoves Project in GhanaGhana