Dagpazari Wind Power Plant
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Postmarket Evaluation of the Phased Radio Frequency Ablation System (GOLD AF Registry)Download →other · hosted copy · 10,704 KB
- FM 4.9 Gold Standard Verification Report Template September 2020Download →verification · hosted copy · 4,056 KB
- The Gold Standard Validation & Verification Manual for CDM ProjectsDownload →verification · hosted copy · 704 KB
- CORE DOCUMENT- Validation and Verification StandardDownload →verification · hosted copy · 902 KB
- GOLD STANDARD FOR THE GLOBAL GOALS PRINCIPLES & REQUIREMENTSDownload →other · hosted copy · 604 KB
- Single Doses of GSK3008348 in Idiopathic Pulmonary Fibrosis (IPF) Participants Using Positron Emission Tomography (PET) ImagingDownload →other · hosted copy · 896 KB
- Phase III Study of GSK1278863 in Japanese Non-dialysis (ND) and Peritoneal Dialysis (PD) Subjects With Renal AnemiaDownload →other · hosted copy · 1,355 KB
- Monitoring Report_3rd monitoring period_01.04.2015 to 30.04.2016_v7.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.04.2015 to 30.04.2016_v4.pdf (Preliminary Review)Open →verification · source link
- GS Passport_06-06-2013.pdf (Preliminary Review)Open →other · source link
- PDD_16-04-2013.pdf (Preliminary Review)Open →pdd · source link
- GS1034 Local Stakeholder Consultation Report Review_06.01.2012.pdf (Design Review)Open →other · source link
- GS1034 Validation Report 21.01.2013_v1.2.pdf (Design Review)Open →verification · source link
- (1)Verification Report_1st monitoring period_20.05.2012 to 30.06.2013_v3.pdf (Performance Review no. 1)Open →verification · source link
- (2)Monitoring Report_1st monitoring period_20.05.2012 to 30.06.2013_v2.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.07.2013 to 31.03.2015_v1.pdf (Performance Review no. 2)Open →verification · source link
- (2)Monitoring Report_2nd monitoring period_01.07.2013 to 31.03.2015_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_4th monitoring period_01.05.2016 to 31.10.2018_v3.pdf (Performance Review no. 4)Open →verification · source link
- (2)Monitoring Report_4th monitoring period_01.05.2016 to 31.10.2018_v5.doc (Performance Review no. 4)Open →monitoring · source link
- PDD_Dagpazari WPP_v6.17.10.2022.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- Final_ER calculations_658 Dagpazari wind_v02_16-02-2021.xls (Crediting Period Renewal no. 1)Open →other · source link
- Final_Val Report_658 Dagpazari wind_Seda Atabek_v01.4_01-11-2022.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Final_Ver Report_655 Dagpazarı Wind_İrem Taşkıran_v04_03-02-2025_cl.pdf (Performance Review no. 5)Open →other · source link
- Final_MR_ 655 Dagpazarı Wind_v7_31-01-2025_clean.pdf (Performance Review no. 5)Open →monitoring · source link
- T-V4.0-Deviation-Request-Form_Enerjisa SC16.pdf (Performance Review no. 5)Open →other · source link
- Final_ER calculations_655_Dagpazarı Wind_v05_06-12-2024.xlsx (Performance Review no. 5)Open →other · source link
- Dagpazari_WPP-Project-Annual-Report.pdf (Performance Review no. 5)Open →other · source link
- Annual Report 2021_DağpazarıWPP.pdf (Performance Review no. 6)Open →other · source link
- Dagpazari-WPP-Annual-Report.pdf (Annual Report no. 1)Open →other · source link
- Final_SDG Impact Tool_1270 Dagpazari wind_v02_18-03-2025.xlsx (Design Change | With VVB no. 1)Open →other · source link
- Final_DCVal Report_1270 Dagpazarı Wind_Kader ALKAÇ_v03_13-06-2025.pdf (Design Change | With VVB no. 1)Open →other · source link
- Open →
- Final_ER calculations_1270 Dagpazari wind_v06_10_03_2025.xls (Design Change | With VVB no. 1)Open →other · source link
- Dagpazari_WPP_Annual_Report.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia