Ceará Renewable Energy Bundled Project
Renewable Energy · Biomass · Brazil
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- GS Impact Registry Project Page – GS1042 (registry #38)Download →other · hosted copy · 2 KB
- Gold Standard Marketplace – Ceará Renewable Energy Project, BrazilDownload →other · hosted copy · 399 KB
- Gold Standard Project Spotlight: Saving Brazil's Biodiversity with Clean Energy (Oct 2025)Download →other · hosted copy · 125 KB
- Verification Report_2nd monitoring period_01-01-2012 to 30-04-2013_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_3rd monitoring period_01-05-2013 to 28-02-2014_v3.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_3rd monitoring period_01-05-2013 to 28-02-2014_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_1st monitoring period_01-09-2010 to 31-12-2011_v5.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01-03-2014 to 30-11-2014_v5.1.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_1st monitoring period_01-09-2010 to 31-12-2011_v4.pdf (Preliminary Review)Open →verification · source link
- PDD_22-12-2006.pdf (Preliminary Review)Open →pdd · source link
- Verification Report_5th monitoring period_01-12-2014 to 31-08-2017_v1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_2nd monitoring period_01-01-2012 to 30-04-2013_v2.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_5th monitoring period_01-12-2014 to 31-08-2017_v3.pdf (Preliminary Review)Open →monitoring · source link
- GS Passport_08-03-2012.pdf (Preliminary Review)Open →other · source link
- Verification Report_4th monitoring period_01-03-2014 to 30-11-2014_v1.3.pdf (Preliminary Review)Open →verification · source link
- T-V4.0-Deviation-Request-Form_Ceara_GS1042_GSdecision(1).pdf (Preliminary Review)Open →other · source link
- PDD_18-01-2012.pdf (Design Review)Open →pdd · source link
- PDD_20-05-2011.pdf (Design Review)Open →pdd · source link
- PDD_19-08-2011.pdf (Design Review)Open →pdd · source link
- (2)GS Passport_02.07.2010.pdf (Design Review)Open →other · source link
- (3)GS Passport_15.01.2010.pdf (Design Review)Open →other · source link
- (1)GS Passport_08-03-2012.pdf (Design Review)Open →other · source link
- GS Passport_15-01-2010.pdf (Design Review)Open →other · source link
- (2)GS Passport_15.01.2010.pdf (Design Review)Open →other · source link
- (1)PDD_22 December 2006.pdf (Design Review)Open →pdd · source link
- GS Passport_04-11-2011.pdf (Design Review)Open →other · source link
- GS Passport_v2.1.pdf (Design Review)Open →other · source link
- PDD_11-07-2011.pdf (Design Review)Open →pdd · source link
- GS1042 Validation Report_19.01.2012_v3.pdf (Design Review)Open →verification · source link
- PDD_04-11-2011.pdf (Design Review)Open →pdd · source link
- GS Passport_18-01-2012.pdf (Design Review)Open →other · source link
- GS Passport_02-07-2010.pdf (Design Review)Open →other · source link
- (2)GS Passport_04.11.2011_v3.1.pdf (Design Review)Open →other · source link
- (2)GS Passport_08-03-2012.pdf (Design Review)Open →other · source link
- (2)GS Passport_18.01.2012_v4.pdf (Design Review)Open →other · source link
- (1)GS Passport_v2.1.pdf (Design Review)Open →other · source link
- (2)PDD_18.01.2012_v4.pdf (Design Review)Open →pdd · source link
- (1)Verification Report_1st monitoring period_01.09.2010 to 31.12.2011_v4.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_01.09.2010 to 31.12.2011_v5.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.01.2012 to 30.04.2013_v1.pdf (Performance Review no. 2)Open →verification · source link
- (1)Monitoring Report_2nd monitoring period_01.01.2012 to 30.04.2013_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Monitoring Report_3rd monitoring period_01.05.2013 to 28.02.2014_v3.pdf (Performance Review no. 3)Open →monitoring · source link
- (1)Verification Report_3rd monitoring period_01.05.2013 to 28.02.2014_v1.pdf (Performance Review no. 3)Open →verification · source link
- (1)Verification Report_4th monitoring period_01.03.2014 to 30.11.2014_v1.3Aa.pdf (Performance Review no. 4)Open →verification · source link
- (1)Monitoring Report_4th monitoring period_01.03.2014 to 30.11.2014_v5.1.pdf (Performance Review no. 4)Open →monitoring · source link
- (1)Verification Report_5th monitoring period_01.12.2014 to 31.08.2017_v1.pdf (Performance Review no. 5)Open →verification · source link
- (1)Monitoring Report_5th monitoring period_01.12.2014 to 31.08.2017_v3.pdf (Performance Review no. 5)Open →monitoring · source link
- MR_Ceará Renewable Energy Bundled Project_01.09.2017_31.08.2020_v3.pdf (Performance Review no. 6)Open →monitoring · source link
- MR calculation_ceará renewable energy bundled_01 09 2017_31 08 2020_v06.xlsx (Performance Review no. 6)Open →monitoring · source link
- MR_Ceará Renewable Energy Bundled Project_01.09.2017_31.08.2020_v6_.pdf (Performance Review no. 6)Open →monitoring · source link
- GS.VER.20.174_FVer Rep_GS request2.pdf (Performance Review no. 6)Open →other · source link
- GS.VER.20.174_FVer Rep_Ceará.pdf (Performance Review no. 6)Open →other · source link
- T-V4.0-Deviation-Request-Form_Ceara_GS1042_GSdecision.pdf (Performance Review no. 6)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biomass →- BBBSiam Cement Biomass ProjectThailand
- BBBJilin Liaoyuan 50MW Level Biomass Cogeneration ProjectChina
- BBBLiucheng Biomass Power Generation Project in Guangxi Zhuang Autonomous Region, ChinaChina
- BBBViñales biomass power plantChile
- BBBHenan Xinxiang 24MW Biomass based Cogeneration ProjectChina
- BBBWaste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM)Russia