Sadilli Wind Farm Project Turkey
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Project Design Document (PDD) — Sadilli Wind Farm, Turkey (CDM PDD format, ACM0002 v13.0.0, ~84 pages)Open →pdd · source link
- Climate Impact Partners — Sadilli Wind Power, Turkey (Project Description Page)Download →other · hosted copy · 83 KB
- ACM0002 v10 — Consolidated baseline methodology for grid-connected electricity generation from renewable sources (UNFCCC/CDM EB, via Verra archive)Download →methodology · hosted copy · 358 KB
- Monitoring Report_3rd monitoring period_01.10.2017 to 30.09.2019_v4.doc (Preliminary Review)Open →monitoring · source link
- GS Passport 19.04.2013_v1.4.pdf (Preliminary Review)Open →other · source link
- GS1237 Local Stakeholder Consultation Report_30.10.2012_v1.1.pdf (Preliminary Review)Open →other · source link
- GS Passport 15.08.2013_v1.5.pdf (Preliminary Review)Open →other · source link
- Verification Report_3rd monitoring period_01.10.2017 to 30.09.2019_v1.pdf (Preliminary Review)Download →verification · hosted copy · 1,364 KB
- PDD 11.09.2013_v1.5.pdf (Design Review)Download →pdd · hosted copy · 1,594 KB
- GS1237 Validation Report_16.09.2012_v1.3.pdf (Design Review)Download →verification · hosted copy · 1,384 KB
- GS1237 Feasibility Report_31.01.2012.pdf (Design Review)Open →other · source link
- (1)Monitoring Report_1st monitoring period_27.10.2014 to 31.03.2016_v5.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 854 KB
- (1)Verification Report_1st monitoring period_27.10.2014 to 31.03.2016_v1.pdf (Performance Review no. 1)Download →verification · hosted copy · 1,568 KB
- (1)Monitoring Report_2nd monitoring period_01.04.2016 to 30.09.2017_v2.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 879 KB
- (1)Verification Report_2nd monitoring period_01.04.2016 to 30.09.2017_v1.pdf (Performance Review no. 2)Download →verification · hosted copy · 1,557 KB
- Şadıllı RES ornitolojik rapor-üreme 2020.pdf (Performance Review no. 3)Open →other · source link
- Final_Ver Report_574 Sadilli wind_Anıl Söyler_v2.1_19-08-2020.pdf (Performance Review no. 3)Open →other · source link
- Monitoring Report_4th monitoring period_01-10-2017 to 30-09-2019_v04.doc (Performance Review no. 3)Download →monitoring · hosted copy · 1,867 KB
- (1)Şadıllı-Transition-Annex-v.3_clean.docx (Performance Review no. 3)Open →other · source link
- Verification Report_4th monitoring period_01-10-2017 to 30-09-2019_v01.pdf (Performance Review no. 3)Download →verification · hosted copy · 1,364 KB
- Final_Val Report_671 Sadilli wind_Seda Atabek_v5_24-08-2022.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Final_PDD_Sadilli WPP_v09_11-05-2022_clean.pdf (Crediting Period Renewal no. 1)Download →pdd · hosted copy · 1,367 KB
- Final_ER Calculations_671 Sadilli wind_v04_11-05-2022.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Sadilli WPP_MR_4th_v6.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 908 KB
- Sadilli_Annual Report.pdf (Performance Review no. 4)Open →other · source link
- Final_Ver Report_785 Sadilli wind_Anıl Söyler_v01.2_20-01-2023.pdf (Performance Review no. 4)Open →other · source link
- Annual Report Sadilli 2021.pdf (Performance Review no. 4)Open →other · source link
- Final_ER Calculations_785 Sadilli wind_v04_22-08-2022.xlsx (Performance Review no. 4)Open →other · source link
- T-V4.0-Deviation-Request-Form_SadilliWPP_rev.pdf (Performance Review no. 4)Open →other · source link
- Final_MR_ 1086 Sadilli Wind_v05_17-04-2024.docx (Performance Review no. 5)Download →monitoring · hosted copy · 443 KB
- Annual-Report-Form-2022-Sadilli.pdf (Performance Review no. 5)Open →other · source link
- Final_ER calculations_1086 Sadilli Wind_v05_17-04-2024.xlsx (Performance Review no. 5)Open →other · source link
- Final _SDG-Impact-tool_ Sadilli Wind_v04_06-03-2025.xlsx.xlsx (Performance Review no. 5)Open →other · source link
- Final_ER calculations_1086 Sadilli Wind_v08_06-03-2025.xlsx.xlsx (Performance Review no. 5)Open →other · source link
- Final_Ver Report_1086 Şadıllı Wind_Khalid Mahmood _v05_10-03-2025-Clean.pdf.pdf (Performance Review no. 5)Open →other · source link
- Final_MR_1086 Sadilli Wind_v8_06-03-2025_clean.pdf.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 781 KB
- Final_Ver Report_1086 Şadıllı Wind_Khalid Mahmood _v02_10-05-2024.pdf (Performance Review no. 5)Open →other · source link
- T-PerfCert_v3.0-Project-Annual-Report_Sadilli WPP.pdf (Annual Report no. 1)Open →other · source link
- GS1237_Şadıllı_WPP_ER_Calculations_V.05_020226.xlsx (Performance Certification | Project no. 1)Open →other · source link
- Final Verification Report_1341 Şadıllı WPP_İrem TAŞKIRAN_v03_06.02.2026_cl.pdf (Performance Certification | Project no. 1)Download →verification · hosted copy · 1,953 KB
- GS1237_Şadıllı_WPP_MR_Clean_V.06_030226.pdf (Performance Certification | Project no. 1)Download →monitoring · hosted copy · 837 KB
- Final_SDG Impact Tool_1341 Şadıllı WPP_v03_27.10.2025.xlsx (Performance Certification | Project no. 1)Open →other · source link
- Open →
- SADILLI DESIGN CHANGE_PDD_V02_18082026 FINAL CLEAN.pdf (Design Change | With VVB no. 1)Download →pdd · hosted copy · 6,864 KB
- Open →
- SADILLI DESIGN CHANGE_SDG IMPACT TOOL_V02_18082026.xlsx (Design Change | With VVB no. 1)Open →other · source link
- SADILLl DESIGN CHANGE_ER Calculations_V02_18082026.xlsx (Design Change | With VVB no. 1)Open →other · source link
- AMP25-GSVV-0422_DC Report_v02_GS 1237 Sadilli WPP_Öykü Yakupoğlu_22-08-2026.pdf (Design Change | With VVB no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia