Balabanli Wind Power Plant
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- The Gold Standard Validation & Verification Manual for CDM ProjectsDownload →verification · hosted copy · 704 KB
- 101_V1.0_PAR_Principles-Requirements.pdfDownload →other · hosted copy · 403 KB
- TEMPLATE Climate Security and Sustainable Development DEVIATION REQUEST FORMDownload →other · hosted copy · 240 KB
- GOLD STANDARD PROCEDURES FOR APPROVAL OF ...Download →other · hosted copy · 1,161 KB
- Climate Security and Sustainable Development DEVIATION REQUEST FORMDownload →other · hosted copy · 201 KB
- THE GOLD STANDARD MANUAL FOR CDM PROJECT DEVELOPERS Version 3; Mai 2006Download →other · hosted copy · 737 KB
- GS1322 Validation Report_07.04.2015_v3.pdf (Preliminary Review)Open →verification · source link
- GS Passport 25.03.2015.pdf (Preliminary Review)Open →other · source link
- PDD 16.04.2014_v2.pdf (Preliminary Review)Open →pdd · source link
- Open →
- (1)PDD 16.04.2018_v2.docx (Design Review)Open →pdd · source link
- (1)Verification Report_1st monitoring period_04.04.2014 to 31.12.2016_v1.3Aa.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_04.04.2014 to 31.12.2016_v6.doc (Performance Review no. 1)Open →monitoring · source link
- Balabanlı WPP_2nd Verification_MR_v5_20210127_clean.doc (Performance Review no. 2)Open →verification · source link
- GS_VER_REP_Balabanli WPP_19XTMD30_Rev 2.0Aa_02042021.pdf (Performance Review no. 2)Open →other · source link
- Other Document 10 (GS_Passport_Balabanli_2017-12-01.pdf).pdf (Design Change Review no. 1)Open →other · source link
- Other Document 9 (PDD_Balabanli-WPP_2019-10-25.pdf).pdf (Design Change Review no. 1)Open →pdd · source link
- Other Document 23 (Balabanlı WPP_Transition-Annex_v2_20200228_TC.docx).docx (Transition Review)Open →other · source link
- Open →
- Final_Val Report_663 Balabanli wind_Anıl Söyler_v01.1_15-03-2021.pdf (Crediting Period Renewal no. 1)Open →other · source link
- T-PerfCert_V2.0-Project-Annual-Report-Form_Balabanlı WPP.pdf (Performance Review no. 3)Open →other · source link
- Final_ER Calculations_Balabanlı WPP_v04_07-09-2023_clean.xlsx (Performance Review no. 3)Open →other · source link
- Final_Ver Report_Balabanli WPP_v02_12-12-2023.pdf (Performance Review no. 3)Open →other · source link
- Final_MR_Balabanlı WPP_v05_30-11-2023_clean.docx (Performance Review no. 3)Open →monitoring · source link
- Open →
- Final_ER Calculations_Balabanlı WPP_v03_11-10-2024.xlsx (Performance Review no. 4)Open →other · source link
- GS 1322_Final_MR_Balabanlı WPP_v05_11-03-2025_clean.pdf (Performance Review no. 4)Open →monitoring · source link
- Final_IRR Calculations_Balabanli WPP_v04_17-12-2024.xlsx (Design Change | With VVB no. 1)Open →other · source link
- GS_1322_FVR_Balabanli WPP_24 12 2024.pdf (Design Change | With VVB no. 1)Open →verification · source link
- Final_ER Calculations_Balabanli WPP_v03_02-12-2024.xlsx (Design Change | With VVB no. 1)Open →other · source link
- Final_CP_Balabanli WPP_v03_02-12-2024.xlsx (Design Change | With VVB no. 1)Open →other · source link
- Open →
- GS1322-Balabanli WPP-Project-Annual-Report-2023-v2.pdf (Annual Report no. 2)Open →other · source link
- GS1322-Balabanli WPP-Project-Annual-Report-2024.pdf (Annual Report no. 3)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia