Geres Wind Power Project Turkey
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Soma – Polat Wind Farm Project, Turkey — CDM-PDD v3.2 (22 October 2010) [closest primary analogue; same methodology, geography, consultant as GS1364]Download →pdd · hosted copy · 1,752 KB
- Geres Wind Power Project, Turkey — ZeroCarbon.One Project Listing (project details: 27.5 MW, Kırkağaç, Manisa; 91,736 MWh/yr; 56,866 tCO₂e/yr; Gold Standard registry)Download →other · hosted copy · 136 KB
- Geres Wind Farm — Power-Technology/GlobalData Profile (30 MW, 12 × Nordex N90 2.5 MW, Manisa, commissioned June 2014, owner: Dost Enerji Uretim Sanayi ve Ticaret)Download →other · hosted copy · 258 KB
- PDD 02.04.2014_v3.pdf (Preliminary Review)Open →pdd · source link
- (2)Monitoring Report_1st monitoring period_08.05.2014 to 30.04.2015_v5.doc (Performance Review no. 1)Open →monitoring · source link
- (2)Verification Report_1st monitoring period_08.05.2014 to 30.04.2015_v1.2Aa.pdf (Performance Review no. 1)Open →verification · source link
- (2)Monitoring Report_2nd monitoring period_01.05.2015 to 30.04.2016_v3.doc (Performance Review no. 2)Open →monitoring · source link
- (2)Verification Report_2nd monitoring period_01.05.2015 to 30.04.2016_v1.2Aa.pdf (Performance Review no. 2)Open →verification · source link
- (2)Monitoring Report_3rd monitoring period_01.05.2016 to 30.04.2017_v4.doc (Performance Review no. 3)Open →monitoring · source link
- (2)Verification Report_3rd monitoring period_01.05.2016 to 30.04.2017_v2.pdf (Performance Review no. 3)Open →verification · source link
- (2)Monitoring Report_4th monitoring period_01.05.2017 to 30.04.2018_v3.doc (Performance Review no. 4)Open →monitoring · source link
- (2)Verification Report_4th monitoring period_01.05.2017 to 30.04.2018_v1.0Aa.pdf (Performance Review no. 4)Open →verification · source link
- (2)Verification Report_5th monitoring period_01.05.2018 to 30.04.2019_v1.2Aa.pdf (Performance Review no. 5)Open →verification · source link
- (2)Monitoring Report_5th monitoring period_01.05.2018 to 30.04.2019_v4.docx (Performance Review no. 5)Open →monitoring · source link
- Geres WPP_v3_06082021.docx (Performance Review no. 6)Open →other · source link
- Geres WPP_ER_v3_06082021.xlsx (Performance Review no. 6)Open →other · source link
- Open →
- Open →
- Geres WPP_v4_01102021_clean.docx (Performance Review no. 7)Open →other · source link
- PDD_v1.2_GERES_v10.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- GS_RCP REPORT_2020XTMD35_Geres WPP_Rev 3.0Aa_04102021.pdf (Crediting Period Renewal no. 1)Open →other · source link
- GERES WPP_ER_v3_15112022(1).xlsx (Performance Review no. 8)Open →other · source link
- Open →
- GERES WPP_ER_v4_29122022_clean.docx (Performance Review no. 8)Open →other · source link
- Annual Report.pdf (Performance Review no. 9)Open →other · source link
- GERES WPP_ER_v4_27112023(1).xlsx (Performance Review no. 9)Open →other · source link
- Annual Report(1).pdf (Performance Review no. 9)Open →other · source link
- GS_VER_REP_Geres WPP_23TQMD2_Rev 3.0Aa_05122023(1).pdf (Performance Review no. 9)Open →other · source link
- GERES WPP_MR_v4_271123clean(1).docx (Performance Review no. 9)Open →monitoring · source link
- FVR_GS_VER_REP_Geres WPP_23TQMD49_Rev 3.0Aa_16012025.pdf (Performance Review no. 10)Open →verification · source link
- GERES WPP_ER_v5_16012025.xlsx (Performance Review no. 10)Open →other · source link
- GERES WPP_MR_v7.16012025clean.docx (Performance Review no. 10)Open →monitoring · source link
- Geres Annual Updated.pdf (Annual Report no. 2)Open →other · source link
- FVR_GS_VER_REP_Geres WPP_2025TQCE91_Rev 3.0Aa_08092025.pdf (Performance Certification | Project no. 1)Open →verification · source link
- GS1364GERESWPP_v6_MR_08092025clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- Open →
- GERES WPP_ER_v2_13062025.xlsx (Performance Certification | Project no. 1)Open →other · source link
- Open →
- GS1364GERESWPP_v2_MR_16062026clean.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
- FVR_GS_VER_REP_Geres WPP_2025TQCE522_Rev 1.1Aa_02072026.pdf (Performance Certification | Project no. 2)Open →verification · source link
- GERES WPP_ER_v1_04062026.xlsx (Performance Certification | Project no. 2)Open →other · source link
- SDG Impact Tool_GeresWPP2ndCP5mp_v2.xlsx (Performance Certification | Project no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia