Edincik Wind Power Plant
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Edincik Wind Power Plant Project Leaflet (MidSEFF/EBRD Turkish Carbon Market Programme)Download →other · hosted copy · 1,735 KB
- Gold Standard Project Design Document — EdincikWPP PDD v14 (post-design-change, 05-05-2015) [listed in registry; PDF not directly fetched]Open →pdd · source link
- ACM0002: Consolidated Baseline Methodology for Grid-Connected Electricity Generation from Renewable Sources (CDM Executive Board, applicable version at registration)Download →methodology · hosted copy · 0 KB
- DEV_235 Deviation Request.pdf (Preliminary Review)Open →other · source link
- GS1368 Local Stakeholder Consultation Report_27.12.2013_v4.pdf (Preliminary Review)Open →other · source link
- Open →
- GS1368 Validation Report_30.12.2013_v2.pdf (Design Review)Open →verification · source link
- GS Passport 27.12.2013_v6.pdf (Design Review)Open →other · source link
- Verification Report_1st monitoring period_19.07.2013 to 31.10.2016_v1.1Aa.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring Report_1st monitoring period_19.07.2013 to 31.10.2016_v6.doc (Performance Review no. 1)Open →monitoring · source link
- Open →
- Edincik ER Calculation 16.02.2019-18.07.2020 - v5- 06.01.2023.xlsx (Performance Review no. 2)Open →other · source link
- Annual Report 2021_Edincik WPP.pdf (Performance Review no. 2)Open →other · source link
- DEV_REC_02_22_Edincik WPP-Deviation-Request-Form-GS1368_Decision(1).pdf (Performance Review no. 2)Open →other · source link
- Edincik WPP-Deviation-Request-Form-GS1368-2.pdf (Performance Review no. 2)Open →other · source link
- T-PerfCert_V2.0-Project-Annual-Report-Form_Edincik.pdf (Performance Review no. 2)Open →other · source link
- Edincik-Monitoring-Report_v6-20.03.2023.pdf (Performance Review no. 2)Open →monitoring · source link
- Edincik WPP Transition_v02.docx (Transition Review)Open →other · source link
- Final_CP Renewal Val Report_1028 Edincik Wind_Sandeep Kanda_v06_27.10.2023_cc(1).pdf (Crediting Period Renewal no. 1)Open →other · source link
- T-V5.0-Deviation-Request-Form_Edincik WPP_GS1368 revised.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Final_PDD_1028 Edincik Wind_v19_05-06-2023(1).docx (Crediting Period Renewal no. 1)Open →pdd · source link
- 1028 - Edincik Wind-VAL - GS - CPRen to PDFinal_SDG Impact Tool_1028 Edincik Wind_v1_06-03-2023.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- 1028 - Edincik Wind-VAL - GS - CPRen to PDFinal_ER calculations_1028 Edincik Wind_v02_27-02-2023.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Edincik_WPP-Project-Annual-Report.pdf (Performance Review no. 3)Open →other · source link
- ER_Calculations_Edincik_WPP_v03_15_01_2024.xlsx (Performance Review no. 3)Open →other · source link
- Final_SDG Impact Tool_1028 Edincik Wind_v1_05.04.2024.xlsx (Performance Review no. 3)Open →other · source link
- Verification Report_v05_GS 1368 Edincik WPP_Öykü Yakupoğlu_08-06-2024_clean version.pdf (Performance Review no. 3)Open →verification · source link
- MR_Edincik_WPP_v5_05.04.2024.pdf (Performance Review no. 3)Open →monitoring · source link
- Final_ER Calculations_1367 Edincik WPP_v04_25.03.2026-RC.xlsx (Performance Certification | Project no. 1)Open →other · source link
- Final_MR _1367 Edincik WPP_v06_09.04.2026-RC.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- Final_Verification Report_1367 Edincik WPP_İrem TAŞKIRAN_v03_09-04-2026-RC.pdf (Performance Certification | Project no. 1)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia