Bac Lieu Province Wind Power Plant
Renewable Energy · Wind · Viet Nam
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Bac Lieu Province Wind Power Plant – Project Design Document (CP1, ACM0002 ver. 13, Aug 2012)Download →pdd · hosted copy · 0 KB
- Bac Lieu Province Wind Power Plant – Project Design Document (CP2 Renewal, ACM0002 ver. 20, 2021)Download →pdd · hosted copy · 0 KB
- Validation Report – CP1 (Bureau Veritas India, VVS 2.0)Download →verification · hosted copy · 0 KB
- Validation Opinion – CP2 Renewal (2021)Download →verification · hosted copy · 0 KB
- Monitoring Report – 20 Jun 2013 to 31 Mar 2016Download →monitoring · hosted copy · 0 KB
- Monitoring Report – 01 Apr 2016 to 30 Jun 2017Download →monitoring · hosted copy · 0 KB
- Monitoring Report – 01 Jul 2017 to 30 Sep 2018Download →monitoring · hosted copy · 0 KB
- Monitoring Report – 01 Oct 2018 to 31 Dec 2019Download →monitoring · hosted copy · 0 KB
- Monitoring Report – 01 Jan 2020 to 19 Jun 2020Download →monitoring · hosted copy · 0 KB
- Monitoring Report – 20 Jun 2020 to 31 Dec 2020 (CP2)Download →monitoring · hosted copy · 0 KB
- CDM Registry – Project 7250 (CP1 page)Download →other · hosted copy · 0 KB
- CDM Registry – Project 7250 (CP2 Renewal page)Download →other · hosted copy · 0 KB
- VNEEC/EEC – 3rd Crediting Period Renewal Notice (GS4GG, June 2025)Download →other · hosted copy · 76 KB
- (1)PDD 21.08.2012_v4.pdf (Preliminary Review)Open →pdd · source link
- (1)GS Passport 23.01.2014_v2.2.pdf (Preliminary Review)Open →other · source link
- 20180316-Transition-Annex-Bac_Lieu_2nd_submission_(1).docx (Design Review)Open →other · source link
- (1)Verification Report_1st monitoring period_20.06.2013 to 31.03.2016_v1.pdf (Performance Review no. 1)Open →verification · source link
- (2)Monitoring Report_1st monitoring period_20.06.2013 to 31.03.2016_v3.1.pdf (Performance Review no. 1)Open →monitoring · source link
- Monitoring Report_1st monitoring period_20.06.2013 to 31.03.2016_v2.1.pdf (Performance Review no. 1)Open →monitoring · source link
- (2)Verification Report_2nd monitoring period_01.04.2016 to 30.06.2017_v2.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.04.2016 to 30.06.2017_v1.pdf (Performance Review no. 2)Open →monitoring · source link
- (2)Monitoring Report_2nd monitoring period_01.04.2016 to 30.06.2017_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (2)Verification Report_3rd monitoring period_01.07.2017 to 30.09.2018_v2.pdf (Performance Review no. 3)Open →verification · source link
- (1)Monitoring Report_3rd monitoring period_01.07.2017 to 30.09.2018_v1.pdf (Performance Review no. 3)Open →monitoring · source link
- (1)Monitoring Report_3rd monitoring period_01.07.2017 to 30.09.2018_v2.pdf (Performance Review no. 3)Open →monitoring · source link
- 20201006 GS Monitoring Report.DOC (Performance Review no. 4)Open →monitoring · source link
- GS Verification report_clean.pdf (Performance Review no. 4)Open →verification · source link
- (1)Verification Report_4th monitoring period_01.10.2018 to 31.12.2019_v2.pdf (Performance Review no. 4)Open →verification · source link
- Monitoring Report_4th monitoring period_01.10.2018 to 31.12.2019_v1.pdf (Performance Review no. 4)Open →monitoring · source link
- (1)Monitoring Report_4th monitoring period_01.10.2018 to 31.12.2019_v2.pdf (Performance Review no. 4)Open →monitoring · source link
- CDM Verification Report_MP5 CPI.pdf (Performance Review no. 5)Open →verification · source link
- Open →
- CDM Monitoring Report_MP5_CP1_Ver 3.0.pdf (Performance Review no. 5)Open →monitoring · source link
- GS Verification Report_MP5 CPI.pdf (Performance Review no. 5)Open →verification · source link
- GS Monitoring Report_MP5 CPI_Ver 3.0.pdf (Performance Review no. 5)Open →monitoring · source link
- 05_CDM RCP_Validation Report.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- 01_GS1890 RCP_GS PDD_Ver 2.0.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- 04_CDM RCP PDD_Ver 6.0.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- 02_GS1890_RCP_GS Validation Report.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- 02 Verification_Report _Bac Lieu Province Wind Power Plant_GS1890-Clean.pdf (Performance Review no. 6)Open →verification · source link
- 02_Emission Reduction Calculation_CP2_MP1_Ver 2.0.xlsx (Performance Review no. 6)Open →other · source link
- 01_CP2_MP1_GS Monitoring-Report_Ver 2.2_Clean.pdf (Performance Review no. 6)Open →monitoring · source link
- 01.2_CP2_MP2_GS Monitoring-Report_Ver 1.2_Clean.pdf (Performance Review no. 7)Open →monitoring · source link
- GS1890 GS Annual Report 2023.pdf (Performance Review no. 7)Open →other · source link
- 02_Emission Reduction Calculation_CP2_MP2_Ver 1.0.xlsx (Performance Review no. 7)Open →other · source link
- 02.2_GS_1890 Verification report-v03_Clean.pdf (Performance Review no. 7)Open →verification · source link
- GS1890 Annual Report 2024.pdf (Annual Report no. 1)Open →other · source link
- GS1890_RCP validation report-Clean_R1.pdf (Design Certification Renewal | Project no. 1)Open →verification · source link
- 01_RCP3_GS PDD_Bac Lieu WPP_Ver 4.3_Clean_R1.pdf (Design Certification Renewal | Project no. 1)Open →pdd · source link
- Open →
- 03_Bac Lieu WPP_V1.3_IQ_SDG-Impact-tool_CP3.xlsx (Design Certification Renewal | Project no. 1)Open →other · source link
- GS1890 Bac Lieu Wind Annual Report 2025.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia