TerraClear Ceramic Water Purifier Project in Lao PDR
Household & Community · Clean Water · Laos
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- TerraClear Ceramic Water Purifier Project in Lao PDR – General Summary (Non-Technical), CP2Download →other · hosted copy · 137 KB
- Gold Standard for the Global Goals Transition Annex – GS2095, TerraClear Ceramic Water Purifier Project in Lao PDR (Version 1, September 2017 template; CP2 design document)Download →pdd · hosted copy · 706 KB
- TerraClear Gold Standard Project Page (GS2095 registry link and GS23624 stakeholder materials)Download →other · hosted copy · 61 KB
- GS2095 Gold Standard Impact Registry Entry (requires JavaScript; not machine-readable)Download →other · hosted copy · 2 KB
- GS2095 Local Stakeholder Consultation Report_14.08.2014_v1.2.pdf (Preliminary Review)Open →other · source link
- (1)GS Passport 05.12.2014_v5.doc (Preliminary Review)Open →other · source link
- GS2095 Validation Report 31.12.2014_v3.pdf (Preliminary Review)Open →verification · source link
- (1)PDD 05.12.2014_v5.pdf (Preliminary Review)Open →pdd · source link
- TC_GS4GG_Transition-Annex_20181106_1R_NexusRev_Final.pdf (Design Review)Open →other · source link
- (2)Verification Report_1st monitoring period_16.07.2012 to 31.07.2014_v4.pdf (Performance Review no. 1)Open →verification · source link
- (2)Monitoring Report_1st monitoring period_16.07.2012 to 31.07.2014_v5.1.docx (Performance Review no. 1)Open →monitoring · source link
- (2)Monitoring Report_2nd monitoring period_01.08.2014 to 31.07.2016_v5.docx (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.08.2014 to 31.07.2016_v4.pdf (Performance Review no. 2)Open →verification · source link
- (1)Verification Report_3rd monitoring period_01.08.2016 to 31.07.2018_v1.pdf (Performance Review no. 3)Open →verification · source link
- (2)Monitoring Report_3rd monitoring period_01.08.2016 to 31.07.2018_v2.1.docx (Performance Review no. 3)Open →monitoring · source link
- (1)Verification Report - 2020 (Final).pdf (Performance Review no. 4)Open →verification · source link
- Monitoring Report_4th monitoring period_01-08-2018 to 15-07-2019_v4.1.pdf (Performance Review no. 4)Open →monitoring · source link
- GS RCP VAL Final Report_Terra Water CWP-20220606-clean.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- GS2095_SDGs Calculation_CP2_version 1.4_20220529.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- GS2095_MR_CP2_MP1_V2.1_20230501_Clean.pdf (Performance Review no. 5)Open →monitoring · source link
- GS2095_Verification Report - Latest_20230511 - Clean.pdf (Performance Review no. 5)Open →verification · source link
- Open →
- GS2095_MR_CP2_MP2_V1.1_20230904_Clean.pdf (Performance Review no. 6)Open →monitoring · source link
- _GS2095_ER_CP2_MP2_V1.1_20230904_Updated.xlsx (Performance Review no. 6)Open →other · source link
- 20231118_GS4GG Final VER Report_TerraClear CWP 2nd in CP2_clean.pdf (Performance Review no. 6)Open →other · source link
- T-PerfCert_v3.0-Project-Annual-Report 2024_GS2095_20250110_updated_signed.pdf (Annual Report no. 2)Open →other · source link
- GS2095_ER_CP2_MP3.2_V2.0_20250425.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS2095_MR_CP2_MP3_V2.1_20250516_clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- 20250701_GS4GG Final VER Report_TerraClear CWP MP3CP2-f.pdf (Performance Certification | Project no. 1)Open →other · source link
- T-PerfCert_v3.0-Project-Annual-Report 2025_GS2095_20260104.pdf (Annual Report no. 3)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Clean Water →- BBBGrouped projects for Mekong River Delta Water PurifierViet Nam
- BBBMulti-Layer Household Water Filtration System in KenyaKenya
- BBBProduction and dissemination of Ceramic Water Purifiers by Hydrologic in the Kingdom of CambodiaCambodia
- BBBGrouped projects for water purifiers for climate and community actionViet Nam
- BBBGrouped Projects For Cambodia Water PurifierCambodia
- BBBGrouped Projects for Safe Drinking Water for Schools in Viet NamViet Nam