Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project
Renewable Energy · Wind · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard Registry Project Page – GS2499 (Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project)Download →other · hosted copy · 2 KB
- Natureoffice Project Description – Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project (technical parameters consistent with PDD)Open →other · source link
- Simplizero Project Page – Bundled Wind Power (GS registry link, crediting period, auditor, developer details)Download →other · hosted copy · 344 KB
- CDM UNFCCC – Project 7288: Gansu Jinchang Xitan Wind Farm Project (same operator/location, ACM0002, cross-reference)Download →other · hosted copy · 1 KB
- Agendi AB-1305 Offsets Disclosure PDF (Dec 2024) – lists comparable Gansu ACM0002 wind projects including VCS728Download →other · hosted copy · 292 KB
- Verification Report_2nd monitoring period_31-01-2015 to 30-07-2016.pdf (Preliminary Review)Download →verification · hosted copy · 1,012 KB
- Monitoring Report_2nd monitoring period_31-01-2015 to 30-07-2016_v05.1.pdf (Preliminary Review)Download →monitoring · hosted copy · 725 KB
- Monitoring Report_1st monitoring period_11-01-2014 to 30-01-2015_v04.0.pdf (Preliminary Review)Download →monitoring · hosted copy · 888 KB
- GS Passport_18-06-2014.pdf (Preliminary Review)Open →other · source link
- Verification Report_1st monitoring period_11-01-2014 to 30-01-2015.pdf (Preliminary Review)Download →verification · hosted copy · 1,925 KB
- PDD_18-06-2014.pdf (Preliminary Review)Download →pdd · hosted copy · 1,122 KB
- (1)Monitoring Report_1st monitoring period_11-01-2014 to 30-01-2015_v04.0.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 888 KB
- (1)Verification Report_1st monitoring period_11-01-2014 to 30-01-2015.pdf (Performance Review no. 1)Download →verification · hosted copy · 1,925 KB
- (1)Monitoring Report_2nd monitoring period_31-01-2015 to 30-07-2016_v05.1.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 725 KB
- (1)Verification Report_2nd monitoring period_31-01-2015 to 30-07-2016.pdf (Performance Review no. 2)Download →verification · hosted copy · 1,012 KB
- Monitoring Report_4th monitoring period_31-01-2017 to 29-11-2019_v2.pdf (Performance Review no. 3)Open →monitoring · source link
- Verification Report_4th monitoring period_31-01-2017 to 29-11-2019_v1.pdf (Performance Review no. 3)Open →verification · source link
- GS-VCR-GS 2499VER-clean(4).pdf (Performance Review no. 5)Open →other · source link
- 2023.03.08-PerfCert_V1.1-Monitoring-Report -GS2499-05-clean.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 822 KB
- GS-VCR-GS 2499VER-track(2).pdf (Performance Review no. 5)Open →other · source link
- GS4GG VR Renewal of the Crediting Period - Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project - GS 2499.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- GS4GG VR Renewal of the Crediting Period - Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project - GS 2499-CLEAN.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- 2022.05.10-ER_GS2499-Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- ER_GS2499-Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project.xls (Crediting Period Renewal no. 1)Open →other · source link
- Project-Design-Document-renew-GS2499-Gansu Jinchang Magang and Huangmaopo Bundled Wind Power Project-clean.pdf (Crediting Period Renewal no. 1)Download →pdd · hosted copy · 2,370 KB
- GS2499_Project-Annual-Report_01-01-2022 to 31-12-2022 V1.pdf (Performance Review no. 6)Open →other · source link
- GS2499_Project-Annual-Report_11-01-2021 to 31-12-2021 V1.pdf (Performance Review no. 6)Open →other · source link
- GS2499-Project-Annual-Report-2023.pdf (Annual Report no. 1)Open →other · source link
- GS2499-Project-Annual-Report-2024.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia