National Bio Energy Tongliao Biomass Power Plant
Renewable Energy · Biomass · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard Registry Project Page – GS2502 / Internal ID 392 (National Bio Energy Tongliao Biomass Power Plant)Download →other · hosted copy · 2 KB
- Possible PDD – 'Gsp-Dd-Final-120703' (Scribd, July 2012 date in filename – not confirmed as GS2502 PDD; JavaScript-gated)Download →pdd · hosted copy · 1,128 KB
- PDD_25.08.2014_v4.1.pdf (Preliminary Review)Open →pdd · source link
- GS Passport_25.08.2014_4.1.pdf (Preliminary Review)Open →other · source link
- Transition Annex_22.07.2014_v2.2.docx (Design Review)Open →other · source link
- (1)Verification Report_1st monitoring period_22.07.12 to 31.08.14_v3.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring Report_1st monitoring period_22.07.12 to 31.08.14_v2.1.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.09.14 to 30.11.17_v1.2.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.09.14 to 30.11.17_v2.1.doc (Performance Review no. 2)Open →monitoring · source link
- MR_TongliaoBiomass_GS2502_MP4_clean(2).pdf (Performance Review no. 4)Open →monitoring · source link
- 14121 Gs Verification Report Clean(2).pdf (Performance Review no. 4)Open →verification · source link
- ER_Tongliao BiomassPower_GS2502_MP4.xlsx (Performance Review no. 4)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biomass →- BBBSiam Cement Biomass ProjectThailand
- BBBJilin Liaoyuan 50MW Level Biomass Cogeneration ProjectChina
- BBBLiucheng Biomass Power Generation Project in Guangxi Zhuang Autonomous Region, ChinaChina
- BBBViñales biomass power plantChile
- BBBHenan Xinxiang 24MW Biomass based Cogeneration ProjectChina
- BBBWaste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM)Russia