National Bio Energy Changtu Biomass Power Plant
Renewable Energy · Biomass · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard Registry — Credit Block GS1-1-CN-GS2503-9-2013-3330 (2013 vintage, retired 2019)Download →other · hosted copy · 2 KB
- Gold Standard Registry — Credit Block GS1-1-CN-GS2503-9-2012-3331 (2012 vintage, retired 2019)Download →other · hosted copy · 2 KB
- PROXY — CDM Project 7135 PDD: Inner Mongolia Chifeng Anqing Biomass Cogeneration Project (AMS-I.D. v17, National Bio Energy Co. Ltd., China — closest public structural proxy for GS2503)Download →pdd · hosted copy · 1 KB
- PROXY — CDM Project 7135 Validation Report (VVM 1.2, AMS-I.D., National Bio Energy Co. Ltd.)Download →verification · hosted copy · 1 KB
- PROXY — CDM Project 7135 Monitoring Report (04 Sep 2012 – 03 Sep 2019)Download →monitoring · hosted copy · 1 KB
- CDM Project 1032 Registry Page — Shandong Shanxian 25MW Biomass (NBE flagship, ACM0006, large-scale, developer context)Download →other · hosted copy · 1 KB
- Deviation-Request_Changtu biomass_GS2503_Final decision(1).pdf (Preliminary Review)Open →other · source link
- PDD_26.03.2014_v5.2.pdf (Preliminary Review)Open →pdd · source link
- GS Passport_26.03.2014_v5.2.pdf (Preliminary Review)Open →other · source link
- Transition Annex_05.03.2014_v2.2.pdf (Design Review)Open →other · source link
- (1)Monitoring Report_2nd monitoring period_01.02.2014 to 28.02.2017_v3.doc (Performance Review no. 2)Open →monitoring · source link
- Verification Report_2nd monitoring period_01.02.2014 to 28.02.2017_v1.2.pdf (Performance Review no. 2)Open →verification · source link
- (1)Monitoring Report_3rd monitoring period_01.03.2017 to 28.02.2019_v2.pdf (Performance Review no. 3)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.03.2017 to 28.02.2019_v1.pdf (Performance Review no. 3)Open →verification · source link
- Annual Report_Chagntu biomass(GS2503)-re.pdf (Performance Review no. 4)Open →other · source link
- A SH 14021 Gs Verification Report Clean.pdf (Performance Review no. 4)Open →verification · source link
- 2nd Annual Report_Changtu biomass_GS2503.pdf (Performance Review no. 4)Open →other · source link
- MR_Changtu_GS2503_MP4_clean(1).pdf (Performance Review no. 4)Open →monitoring · source link
- SDG-Impact-tool_GS2503_230626.xlsx (Performance Review no. 4)Open →other · source link
- Deviation-Request_Changtu biomass_GS2503_Final decision.pdf (Performance Review no. 4)Open →other · source link
- Annual Report_Changtu biomass_GS2503.pdf (Performance Review no. 5)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biomass →- BBBSiam Cement Biomass ProjectThailand
- BBBJilin Liaoyuan 50MW Level Biomass Cogeneration ProjectChina
- BBBLiucheng Biomass Power Generation Project in Guangxi Zhuang Autonomous Region, ChinaChina
- BBBViñales biomass power plantChile
- BBBHenan Xinxiang 24MW Biomass based Cogeneration ProjectChina
- BBBWaste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM)Russia