Suloglu Wind Power Plant Turkey
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Verification and Certification Report — Suloglu Wind Power Plant, Turkey (GS2763), Period 2: 01/05/2017–30/04/2019, RINA Services S.p.A., v3.0Aa, 15/02/2021Download →verification · hosted copy · 885 KB
- Monitoring Report — Süloğlu Wind Power Plant, Turkey (GS2763), Period 2: 01/05/2017–30/04/2019, v5, 02/03/2021 (CDM-MR-FORM v7.0)Download →monitoring · hosted copy · 1,641 KB
- ACM0002 v16.0 — Consolidated baseline methodology for grid-connected electricity generation from renewable sources (CDM Executive Board, 20/11/2014)Download →methodology · hosted copy · 1 KB
- Monitoring Report_1st monitoring period_19-09-15 to 30-04-17_v5.0.doc (Preliminary Review)Open →monitoring · source link
- Verification Report_1st monitoring period_19-09-15 to 30-04-17_v1.2.pdf (Preliminary Review)Download →verification · hosted copy · 959 KB
- PDD_29-04-15.PDF (Preliminary Review)Open →pdd · source link
- GS Passport_29-08-16.doc (Preliminary Review)Open →other · source link
- PDD_Suloglu_WPP_23_08_2016_clean.docx (Design Review)Open →pdd · source link
- (1)Verification Report_1st monitoring period_19-09-15 to 30-04-17_v1.2.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_19-09-15 to 30-04-17_v5.0.doc (Performance Review no. 1)Open →monitoring · source link
- (1)Suloglu WPP_MR_v5_02032021_clean.pdf (Performance Review no. 2)Open →monitoring · source link
- GS_VER_REP_Suloglu WPP_20XTMD16_Rev 3.0Aa_15022021.pdf (Performance Review no. 2)Open →other · source link
- Süloğlu WPP_Transition Annex_v2_clean.docx (Transition Review)Open →other · source link
- GS2763 Annual Report 2020.docx (Performance Review no. 3)Open →other · source link
- GS2763_Annual_Report_2024.docx (Performance Review no. 3)Open →other · source link
- DEVRQ-75.pdf (Performance Review no. 3)Open →other · source link
- GS2763_ER_V06_12032025.xlsx (Performance Review no. 3)Open →other · source link
- GS2763_Annual_Report_2021.docx (Performance Review no. 3)Open →other · source link
- GS2763 Annual Report 2019.docx (Performance Review no. 3)Open →other · source link
- DEV_737.pdf (Performance Review no. 3)Open →other · source link
- T-V5.0-Deviation-Request-GS_2763_SC_FINAL.pdf (Performance Review no. 3)Open →other · source link
- 1742299756_1742215717_GS2763_FVR_Clean_V04_130325.pdf (Performance Review no. 3)Open →verification · source link
- GS_2763_MR_V06_3rd round of comments_CC.pdf (Performance Review no. 3)Open →monitoring · source link
- GS2763-Annual Report (2023).pdf (Performance Review no. 3)Open →other · source link
- GS2763 Suloglu WPP Annual Report.pdf (Performance Review no. 3)Open →other · source link
- GS_2763_SD_Impact Tool v4 .xlsx (Crediting Period Renewal no. 1)Open →other · source link
- ER Estimation Suloglu WPP RCP V5 .xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS.VER.22.26 - RoCP_FVR_v2.2_CL.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- Open →
- Final_ER Calculation_ 1245 Suloglu Wind_V04_02-09-2025..xlsx (Design Change | With VVB no. 1)Open →other · source link
- Final_SDG Impact Tool_1245 Suloglu wind_v03_18-11-2025.xlsx (Design Change | With VVB no. 1)Open →other · source link
- Final_PDD_ 1245 Suloglu Wind_V16_18-11-2025 clean.pdf (Design Change | With VVB no. 1)Open →pdd · source link
- Final_Val report_1245 Suloglu Wind_Kübra Karakoç_V04_19-11-2025.pdf (Design Change | With VVB no. 1)Open →other · source link
- Final_IRR Calculation_ 1245 Suloglu Wind_V03_19-08-2025..xlsx (Design Change | With VVB no. 1)Open →other · source link
- GS2763_Annual_Report_2024.pdf (Annual Report no. 1)Open →other · source link
- Final_Ver Report_1296 Süloğlu Wind_İrem Taşkıran_v04_02-06-2026_clean.pdf (Performance Certification | Project no. 1)Open →other · source link
- Final_SDG Impact Tool_1296 Süloğlu Wind_v06_23_12_2025-RC.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS2763_4thMP_ER_v06_.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS2763_Annual_Report_2024-.pdf (Performance Certification | Project no. 1)Open →other · source link
- GS2763_4th MR_v08_clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS2763_Annual_Report_2022.pdf (Annual Report no. 2)Open →other · source link
- GS2763_Annual_Report_2023.pdf (Annual Report no. 3)Open →other · source link
- Final_Ver Report_1297 Süloğlu Wind_İrem Taşkıran_v03_12-08-2026.pdf (Performance Certification | Project no. 2)Open →other · source link
- Final_SDG+Impact+Tool_GS2763_5thMP_v07_03082026.xlsx (Performance Certification | Project no. 2)Open →other · source link
- Final_ER_GS2763_5thMP_v07_03082026.xlsx (Performance Certification | Project no. 2)Open →other · source link
- GS2763_5th MR_v07_03082026.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia