Nepal Biogas Support Program - CPA 3: 19959 digesters
Household & Community · Biodigesters · Nepal
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CPA Design Document – Nepal Biogas Support Program CPA 3: 19,959 digesters (CDM 9572-P1-0003-CP1, first crediting period, 207 KB)Download →pdd · hosted copy · 0 KB
- CPA Design Document – Nepal Biogas Support Program CPA 3 Renewal (CDM 9572-P2-0003-CP2, second crediting period, 465 KB)Download →pdd · hosted copy · 0 KB
- Appendix 1 – Validation Report, CPA 3 (First Crediting Period, 376 KB)Download →verification · hosted copy · 0 KB
- 7th Periodic Verification Report – Nepal Biogas Support Program PoA (GS ref 3110, monitoring period 31/01/2020–31/12/2020, CPAs 1 & 10; PoA-level methodology proxy)Download →verification · hosted copy · 1,200 KB
- Gold Standard PDD – BSP-Nepal Activity-1 (GS4GG, structural analogue for CPA 3 methodology, atmosfair)Download →pdd · hosted copy · 891 KB
- AEPC Technical Resources – PDDs for BSP-Nepal Activities 1–4 and CPAs 8–10 (AEPC official repository)Download →other · hosted copy · 128 KB
- AEPC TOR for Gold Standard Verification of BSP-Nepal Activity-3 and Activity-4, 2024/25Download →other · hosted copy · 708 KB
- AMS-I.E. – Switch from Non-Renewable Biomass for Thermal Applications by the User (CDM Methodology)Download →methodology · hosted copy · 0 KB
- GS Passport_22.10.2015_v3.pdf (Preliminary Review)Open →other · source link
- Transition Annex_14.08.2015_v2.2.docx (Design Review)Open →other · source link
- Validation Report_04.05.2021.pdf (Design Review)Open →verification · source link
- Monitoring Report_1st monitoring period_31.01.2013 to 31.07.2014_v1.pdf (Performance Review no. 1)Open →monitoring · source link
- Verification Report_1st monitoring period_31.01.2013 to 31.07.2014_v1.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.08.2014 to 31.07.2015_v3.pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_2nd monitoring period_01.08.2014 to 31.07.2015_v1.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_3rd monitoring period_01.08.2015 to 31.07.2016_v3.pdf (Performance Review no. 3)Open →monitoring · source link
- Verification Report_3rd monitoring period_01.08.2015 to 31.07.2016_v1.pdf (Performance Review no. 3)Open →verification · source link
- Monitoring Report_4th monitoring period_01.08.2016 to 31.07.2017_v2.pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_5th monitoring period_01.08.2017 to 31.07.2018_v1.pdf (Performance Review no. 5)Open →verification · source link
- MOnitoring Report_6th monitoring period_01.08.2018 to 30.01.2020_v3.pdf (Performance Review no. 6)Open →monitoring · source link
- Verification Report_6th monitoring period_01.08.2018 to 30.01.2020_v2.pdf (Performance Review no. 6)Open →verification · source link
- Monitoring Report_7th monitoring period_31.01.2020 to 31.12.2020_v2.pdf (Performance Review no. 7)Open →monitoring · source link
- 6. GS4GG_VPA-DD_CPA 1_GS3109_2nd Crediting period V3_Clean.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- Open →
- CCIPL1295 GS FVR (clean) v3(2).pdf (Performance Review no. 8)Download →verification · hosted copy · 1,290 KB
- GS3110_Biogas PoA_Monitoring Report_CP1&2_MP-8&2_V03_Clean_Version(2).docx (Performance Review no. 8)Open →monitoring · source link
- SD1_CPA_3_Final CDM Report_BUS 2021.pdf (Performance Review no. 8)Open →other · source link
- 2_GS3110_Biogas PoA_Monitoring Report_CP-2_MP-3_V02.2_Clean(2).docx (Performance Review no. 9)Open →monitoring · source link
- CCIPL 1961 MP03 CP02 02022024 2 Clean(2).pdf (Performance Review no. 9)Open →other · source link
- SD9_T-PerfCert_V2.0-Project-Annual-Report-Form_CPA 3.docx (Performance Review no. 9)Open →other · source link
- 1_GS3110_ER Calculation sheet_Biogas PoA_CP-2_MP-3_V02.1(2).xlsx (Performance Review no. 9)Open →other · source link
- SD8_430_V1.3_IQ_SDG-Impact-tool_CPA 3.xlsx (Performance Review no. 9)Open →other · source link
- CPA-3 Transition Request Form prefilled_JaGl_09052022_Clean.docx (Transition Review (GS CDM to GS VER))Open →other · source link
- Annual Report PoA 2023.pdf (Annual Report no. 1)Open →other · source link
- Annual Report PoA 2024.pdf (Annual Report no. 2)Open →other · source link
- Annual Report PoA 2024_.pdf (Annual Report no. 3)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biodigesters →- BBBBiogas Program for the Animal Husbandry Sector of VietnamViet Nam
- ANational Biodigester Programme CambodiaCambodia
- A*WWF Nepal Gold Standard Biogas Voluntary Emission Reduction (VER) ProjectNepal
- ASichuan Rural Poor-Household Biogas Development Programme (GS1239 CER to VER conversion)China
- ANepal Biogas Support Program - CPA 1: 20000 digestersNepal
- AIndonesia Domestic Biogas Programme of Activities (IDBP) VPA-1Indonesia