Soma III Wind Farm
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Project Design Document (CDM PDD v3.2) — Soma-Polat Wind Farm Project, Turkey (140.1 MW, 119 turbines, Phases I & II), dated 22 October 2010Download →pdd · hosted copy · 1,752 KB
- Soma 4 Wind Power Plant Non-Technical Summary (ESIA) — Soma Enerji Elektrik Üretim A.Ş., references Soma III 100 MW capacity extension granted by EMRA in 2013Download →other · hosted copy · 817 KB
- Verification Report_1st monitoring period_28.11.2014 to 31.05.2017_v1.3Aa.pdf (Preliminary Review)Download →verification · hosted copy · 703 KB
- PDD 02.08.2019_v9.pdf (Preliminary Review)Download →pdd · hosted copy · 2,184 KB
- GS Passport 02.08.2019_v3.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_1st monitoring period_28.11.2014 to 31.05.2017_v6.doc (Preliminary Review)Download →monitoring · hosted copy · 1,165 KB
- Monitoring Report_2nd monitoring period_01.06.2017 to 30.06.2019_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 595 KB
- Verification Report_2nd monitoring period_01.06.2017 to 30.06.2019_v1.1Aa.pdf (Preliminary Review)Download →verification · hosted copy · 699 KB
- (2)Verification Report_2nd monitoring period_01.06.2017 to 30.06.2019_v1.1Aa.pdf (Performance Review no. 2)Download →verification · hosted copy · 699 KB
- (2)Monitoring Report_2nd monitoring period_01.06.2017 to 30.06.2019_v2.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 595 KB
- Open →
- 101.5-Transition-Annex-GS 3253_v2_25.03.2020.pdf (Performance Review no. 3)Open →other · source link
- GS_VER_REP_Soma III WFP_19TQ15MD_Rev 1.2Aa_21022020.pdf (Performance Review no. 3)Open →other · source link
- GS3253 Soma III Draft 2ndMR_v3_wtc_100220.pdf (Performance Review no. 3)Open →other · source link
- SomaIII_Wind_Farm_2020_Annual Report.pdf (Performance Review no. 4)Open →other · source link
- GS_VER_REP_Soma III WPP_21XTMD42_Rev 2.0Aa_10082022.pdf (Performance Review no. 4)Open →other · source link
- SOMA_ER calculations_v5_30.06.2022.xlsx (Performance Review no. 4)Open →other · source link
- Monitoring-Report_Soma WPP (GS3253)_v6_30.06.2022.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 902 KB
- Open →
- SOMA_4_Local Stakeholder Consultation Report.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Final_Val Report_773 Soma III wind_Seda Atabek_v05_27-12-2022.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Final_ER calculations_773 Soma III wind_v02_01-11-2021.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- Open →
- GS_VER_REP_Soma III WPP_23TQMD17_Rev 1.2Aa_18102023.pdf (Performance Review no. 5)Open →other · source link
- Monitoring-Report_Soma_WPP_GS3253_v7_07.04.2025.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 831 KB
- FVR_GS_VER_REP_Soma III WPP_23TQMD17_Rev 5.0Aa_11042025.pdf (Performance Review no. 5)Open →verification · source link
- Monitoring-Report_Soma_WPP_GS3253_v3_16.10.2023.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 562 KB
- GS3253_SomaIII_WPP-Project-Annual-Report.pdf (Performance Review no. 5)Open →other · source link
- Annual Report_SomaIII WPP.pdf (Performance Review no. 5)Open →other · source link
- Soma III-WPP-Annual-Report-2024.pdf (Annual Report no. 1)Open →other · source link
- Soma III_WPP_Annual_Report.pdf (Annual Report no. 2)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia