20 MW Biomass Power Project at Godawari Power and Ispat Limited Chhattisgarh
Renewable Energy · Biomass · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM PDD: 20 MW Biomass Power Project at Godawari Power and Ispat Limited, Chhattisgarh (1527 KB)Download →pdd · hosted copy · 1 KB
- CDM Validation Page: 20 MW Biomass Power Project at Godawari Power and Ispat Limited, Chhattisgarh (incl. public comments)Download →other · hosted copy · 1 KB
- Gold Standard Marketplace Listing: 20 MW Biomass Power Project in Chhattisgarh, India (GS3547)Open →other · source link
- ACM0018: Electricity generation from biomass in power-only plants (CDM consolidated methodology)Download →methodology · hosted copy · 0 KB
- Monitoring Report_2nd monitoring period_11-08-15 to 28-02-18_v6.0.pdf (Preliminary Review)Open →monitoring · source link
- (1)20MW_GPIL_MR_4thSep16-Clean.pdf (Preliminary Review)Open →monitoring · source link
- (1)GS ER-Godawari-V02.xlsx (Preliminary Review)Open →other · source link
- Monitoring Report_1st monitoring period_11-08-13 to 10-08-15_v1.3.pdf (Preliminary Review)Open →monitoring · source link
- (1)VALIDATION_REPORT_Approved.pdf (Preliminary Review)Open →verification · source link
- GS Passport_22-05-15.pdf (Preliminary Review)Open →other · source link
- (1)Final_PDD_Approved.pdf (Preliminary Review)Open →pdd · source link
- (1)Final_Passport_Approved.pdf (Preliminary Review)Open →other · source link
- (1)GS MR-Godawari-V03_Cleanmode.pdf (Preliminary Review)Open →monitoring · source link
- (1)Verification_report_05.09.2016-Clean.pdf (Preliminary Review)Open →verification · source link
- PDD_22-05-15.pdf (Preliminary Review)Open →pdd · source link
- Verification Report_2nd monitoring period_11-08-15 to 28-02-18_v1.0.pdf (Preliminary Review)Open →verification · source link
- (1)GS 3547_FVR.pdf (Preliminary Review)Open →verification · source link
- Verification Report_1st monitoring period_11-08-13 to 10-08-15_v1.0.pdf (Preliminary Review)Open →verification · source link
- Final_PDD_Approved.pdf (Design Review)Open →pdd · source link
- Final_Passport_Approved.pdf (Design Review)Open →other · source link
- VALIDATION_REPORT_Approved.pdf (Design Review)Open →verification · source link
- Verification_report_05.09.2016-Clean.pdf (Performance Review no. 1)Open →verification · source link
- (2)Verification Report_1st monitoring period_11-08-13 to 10-08-15_v1.0.pdf (Performance Review no. 1)Open →verification · source link
- 20MW_GPIL_MR_4thSep16-Clean.pdf (Performance Review no. 1)Open →monitoring · source link
- (2)Monitoring Report_1st monitoring period_11-08-13 to 10-08-15_v1.3.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Verification Report_1st monitoring period_11-08-13 to 10-08-15_v1.0.pdf (Performance Review no. 2)Open →verification · source link
- (2)Monitoring Report_2nd monitoring period_11-08-15 to 28-02-18_v6.0.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Monitoring Report_1st monitoring period_11-08-13 to 10-08-15_v1.3.pdf (Performance Review no. 2)Open →monitoring · source link
- (2)Verification Report_2nd monitoring period_11-08-15 to 28-02-18_v1.0.pdf (Performance Review no. 2)Open →verification · source link
- GS ER-Godawari-V02.xlsx (Performance Review no. 3)Open →other · source link
- GS 3547_FVR.pdf (Performance Review no. 3)Open →verification · source link
- GS MR-Godawari-V03_Cleanmode.pdf (Performance Review no. 3)Open →monitoring · source link
- GS MR-Godawari-V02_22.09.2020.pdf (Performance Review no. 4)Open →monitoring · source link
- FVR-GS VER-Godawari Ispat_GS3547_TQC13120_30.09.2020.pdf (Performance Review no. 4)Open →verification · source link
- Monitoring-Report_V02_Cleanmode.pdf (Performance Review no. 5)Open →monitoring · source link
- FVR verification_GS 3547_cleanmode.pdf (Performance Review no. 5)Open →verification · source link
- GS 3547 Annual report.pdf (Performance Review no. 6)Open →other · source link
- GGEL_FINANCIAL STATEMENTS_31.03.2021.pdf (Performance Review no. 6)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biomass →- BBBSiam Cement Biomass ProjectThailand
- BBBJilin Liaoyuan 50MW Level Biomass Cogeneration ProjectChina
- BBBLiucheng Biomass Power Generation Project in Guangxi Zhuang Autonomous Region, ChinaChina
- BBBViñales biomass power plantChile
- BBBHenan Xinxiang 24MW Biomass based Cogeneration ProjectChina
- BBBWaste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM)Russia