Vaayu India Wind Power Project in Gujarat
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Vaayu India Wind Power Project in Gujarat – Project Design Document (revised, approved 04 Jun 2021, 513 KB)Download →pdd · hosted copy · 1 KB
- Vaayu India Wind Power Project in Gujarat – Original PDD (validation-period version, 414 KB)Download →pdd · hosted copy · 1 KB
- DNV-CUK Validation Report for CDM Project 4700 (1727 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report – Period 01 Jun 2011 to 29 Feb 2012 (300 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Mar 2012 to 31 Dec 2012 (168 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Jan 2013 to 31 Aug 2013 (172 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Sep 2013 to 31 Dec 2014 (587 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Jan 2015 to 31 Mar 2017 (400 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Apr 2017 to 31 Mar 2018 (160 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Apr 2018 to 31 Dec 2019 (229 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project 4700 Registry Page – Vaayu India Wind Power Project in GujaratDownload →other · hosted copy · 1 KB
- CDM Public Availability / Validation Page – Project 4700Download →other · hosted copy · 1 KB
- (1)Verification Report_1st monitoring period_01.08.2013 to 31.12.2014_v3.pdf (Preliminary Review)Open →verification · source link
- GS Passport_09-09-2015.pdf (Preliminary Review)Open →other · source link
- (1)Verification Report_2nd monitoring period_01.01.2015 to 31.03.2017_v2.pdf (Preliminary Review)Open →verification · source link
- (1)Monitoring Report_2nd monitoring period_01.01.2015 to 31.03.2017_v3.DOCX (Preliminary Review)Open →monitoring · source link
- (1)Validation Report 01.06.2012_v2.2.pdf (Preliminary Review)Download →verification · hosted copy · 156 KB
- (1)Validation Report 22.10.2010.pdf (Preliminary Review)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_01.08.2013 to 31.12.2014_v4.pdf (Preliminary Review)Open →monitoring · source link
- PDD_17-04-2013.pdf (Preliminary Review)Download →pdd · hosted copy · 1,165 KB
- GS 3958 Annual Report.pdf (Performance Review no. 2)Open →other · source link
- (2)GS4GG Verification Report GS3958.pdf (Performance Review no. 3)Open →verification · source link
- GS MR version 1.7 Clean.DOC (Performance Review no. 3)Download →monitoring · hosted copy · 5,524 KB
- CDM MR version 4 - 8 Sep 2021 (clean).pdf (Performance Review no. 4)Download →monitoring · hosted copy · 582 KB
- GS 4425_Vaayu GS_FVR 20 IQ MD 09_Ver 03Aa_01032022_approved.pdf (Performance Review no. 4)Open →verification · source link
- CDM FVRP_2020IQ08MD_v1.1_08.09.2021_approved_Clean.pdf (Performance Review no. 4)Open →other · source link
- GS MR_ver 4.1 - Clean.docx (Performance Review no. 4)Download →monitoring · hosted copy · 866 KB
- GS ER sheet version 1.3_20.09.22.xlsx (Performance Review no. 5)Open →other · source link
- GS ER sheet version 1.2.xlsx (Performance Review no. 5)Open →other · source link
- GS MR_ver 1.1.pdf (Performance Review no. 5)Open →monitoring · source link
- Verification report-GS.VER.22.17_Clean(1).pdf (Performance Review no. 5)Download →verification · hosted copy · 556 KB
- Verification report-GS.VER.22.17_Final_040622.pdf (Performance Review no. 5)Download →verification · hosted copy · 568 KB
- GS MR_ver 1.2.pdf (Performance Review no. 5)Download →monitoring · hosted copy · 713 KB
- Vaayu GS VER Declaration.pdf (Transition Review)Open →other · source link
- Transition-request-form -Vaayu Guj -clean.docx (Transition Review)Open →other · source link
- ODA Gold Standard 2.pdf (Transition Review)Open →other · source link
- Transition-request-form -Vaayu Guj.pdf (Transition Review)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia