100.5 MW Wind Power Project in Madhya Pradesh India
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard Registry – Project GS3969 (JavaScript-only; not readable)Download →other · hosted copy · 2 KB
- Gold Standard Registry – Project ID 686 (cross-reference from Ecologi; JavaScript-only)Download →other · hosted copy · 2 KB
- CDM Project DB – LRQA Ltd (referenced as underlying CDM registration by Ecologi)Download →other · hosted copy · 1 KB
- Ecologi Project Page – Wind Power in India (secondary source)Download →other · hosted copy · 96 KB
- Climate-Wise Project Page – 100.5 MW Wind Power Project in Madhya Pradesh (secondary source)Download →other · hosted copy · 59 KB
- Verification Report_1st monitoring period_01-01-2015 to 31-03-2016.pdf (Preliminary Review)Download →verification · hosted copy · 788 KB
- Monitoring Report_1st monitoring period_01-01-2015 to 31-03-2016_v1.1.pdf (Preliminary Review)Download →monitoring · hosted copy · 628 KB
- PDD_14-03-2016.pdf (Preliminary Review)Download →pdd · hosted copy · 1,106 KB
- Verification Report_2nd monitoring period_01-04-2016 to 31-03-2018_v3.pdf (Preliminary Review)Download →verification · hosted copy · 1,045 KB
- Monitoring Report_2nd monitoring period_01-04-2016 to 31-03-2018_v3.pdf (Preliminary Review)Download →monitoring · hosted copy · 733 KB
- OMWPL_GS_Passport_v2.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_monitoring period_01-04-2018 to 30-09-2019_v04.pdf (Performance Review no. 3)Download →monitoring · hosted copy · 430 KB
- Verification Report_3rd monitoring period_01-04-2018 to 30-04-2019_v4.0.pdf (Performance Review no. 3)Download →verification · hosted copy · 464 KB
- Monitoring Report Version 3.0 . Clean.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 631 KB
- GS.VER.20.30_GS3969_VCR Clean.pdf (Performance Review no. 4)Open →other · source link
- FVR-100 MW_OMWPL GS 3969_GSVER_TQC 7721_GS Review-20.09.2021_Track Change.pdf (Performance Review no. 5)Download →verification · hosted copy · 928 KB
- Monitoring-Report-MMK (TC).pdf (Performance Review no. 5)Download →monitoring · hosted copy · 1,064 KB
- MMK_ER- Version 2.1_16092021.xlsx (Performance Review no. 5)Open →other · source link
- Greenko Mamatkheda_100.5 MW (GS3969) Project-Annual-Report-Form.pdf (Performance Review no. 6)Open →other · source link
- Monitoring-Report_Mamatkehda_100.5 MW_ver05 - Clean.pdf (Performance Review no. 6)Download →monitoring · hosted copy · 819 KB
- Deviation_GS3969_Greenko Mamatkheda_100.5 MW_DEV_525.pdf (Performance Review no. 6)Open →other · source link
- ER sheet_GS3969_ver04 (1).xlsx (Performance Review no. 6)Open →other · source link
- Open →
- SDG-Impact-tool_GS 3969 (1st CP).xlsx (Performance Review no. 6)Open →other · source link
- SDG-Impact-tool_GS 3969 (2nd CP).xlsx (Performance Review no. 6)Open →other · source link
- FVR-GS (VER)-Orange Mamatkheda_GS 3969 VER_TQC 9823_PRR - Clean.pdf (Performance Review no. 6)Download →verification · hosted copy · 820 KB
- 3969_ PDDVer 4 _Clean.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- 1. SDG-Impact-Tool_GS 3969_100.5 MW.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- 3969_FVR _03.pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 1,034 KB
- ER sheet.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Project-Annual-Report_GS3969 for 2024.pdf (Annual Report no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia