Santa Marta Landfill Gas (LFG) Capture for Electricity Generation Project
Waste Management · Landfill Methane · Chile
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard SDG Impact Tools Case Study — GS3976 Santa Marta LFG Capture for Electricity GenerationDownload →other · hosted copy · 1,677 KB
- CDM Project 0799 — Santa Marta LFG Capture Project Design Document (accepted 05 Jul 2011, ACM0001 v4)Download →pdd · hosted copy · 1 KB
- TÜV SÜD Initial and First Periodic Verification Report — CDM Project 0799 (March 2008)Download →verification · hosted copy · 1 KB
- TÜV SÜD Certification Report (First Periodic Monitoring Period) — CDM Project 0799 (March 2008)Download →verification · hosted copy · 1 KB
- CDM Project 0799 — Monitoring Report (11 Mar 2007 – 31 Aug 2007)Download →monitoring · hosted copy · 1 KB
- CDM Project 0799 — Monitoring Report (01 Sep 2010 – 30 Sep 2011)Download →monitoring · hosted copy · 1 KB
- ACM0001 — Consolidated Methodology for Landfill Gas Project Activities (UNFCCC CDM)Download →methodology · hosted copy · 1 KB
- Verification Report_3rd monitoring period_12.05.2016 to 31.07.2017_v2.1.pdf (Preliminary Review)Open →verification · source link
- CCL_333_PDD.pdf (Preliminary Review)Open →pdd · source link
- Verification Report_1st monitoring period_15.09.2014 to 31.08.2015_v2.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_2nd monitoring period_01.09.2015 to 11.05.2016_v3.pdf (Preliminary Review)Open →monitoring · source link
- GS Passport_12-02-2016.pdf (Preliminary Review)Open →other · source link
- Verification Report_2nd monitoring period_01.09.2015 to 11.05.2016_v1.pdf (Preliminary Review)Open →verification · source link
- (1)GS Passport_12-02-2016.pdf (Preliminary Review)Open →other · source link
- Verification Report_4th monitoring period_01.08.2017 to 30.04.2019_v4.pdf (Preliminary Review)Open →verification · source link
- GS Passport_12-01-2015.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_3rd monitoring period_12.05.2016 to 31.07.2017_v4.pdf (Preliminary Review)Open →monitoring · source link
- (1)GS Passport_12-01-2015.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_1st monitoring period_15.09.2014 to 31.08.2015_v3.doc (Preliminary Review)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01.08.2017 to 30.04.2019_v5.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_4th monitoring period_01-08-2017 to 30-04-2019_v1.pdf (Performance Review no. 2)Open →verification · source link
- (190628) GG4GG Transition-Annex-SantaMarta_v2 (Responses to Round I)_clean.pdf (Performance Review no. 2)Open →other · source link
- Monitoring Report_4th monitoring period_01-04-2018 to 30-09-2019_v5.doc (Performance Review no. 3)Open →monitoring · source link
- Verification Report_4th monitoring period_01-08-2017 to 30-04-2019_v4.pdf (Performance Review no. 3)Open →verification · source link
- Monitoring Report_5th monitoring period_01-05-2019 to 13-03-2020_v2.pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_5th monitoring period_01-05-2019 to 13-03-2020_v2.pdf (Performance Review no. 4)Open →verification · source link
- (1)200831_GS4GG MR_SantaMarta_5thMP_01052019-10032020_v4_clean.pdf (Performance Review no. 4)Open →monitoring · source link
- 210430_GS4GG MR_SantaMarta_6thMP_(clean).pdf (Performance Review no. 5)Open →monitoring · source link
- FVR_Marta_RM-8.pdf (Performance Review no. 5)Open →verification · source link
- 2021_07_12_FVR_Marta__Track Changes.pdf (Performance Review no. 6)Open →verification · source link
- 210702_GS4GG MR_SantaMarta_6thMP_v4_(Track changes)_comments.pdf (Performance Review no. 6)Open →monitoring · source link
- 221223_GS4GG Annual-Report-SantaMarta(signed).pdf (Performance Review no. 7)Open →other · source link
- 220907_ER Spreadsheet_7thMP_CSM_v1(2).xlsx (Performance Review no. 7)Open →other · source link
- 221205_GS4GG MR_SantaMarta_7thMP_clean (TR comments responses).pdf (Performance Review no. 7)Open →monitoring · source link
- GS3976_FVR Santa Marta.pdf (Performance Review no. 7)Open →verification · source link
- 221228_ER Spreadsheet_7thMP_CSM_v3.xlsx (Performance Review no. 7)Open →other · source link
- GS3976_MR_SantaMarta_8thMP_Clean_13-09-2023(1).pdf (Performance Review no. 8)Open →monitoring · source link
- GS3976_FVR_Santa Marta_Clean_13-09-2023(1).pdf (Performance Review no. 8)Open →verification · source link
- GS3976__ER Spreadsheet_8thMP_CSM_v3.xlsx (Performance Review no. 8)Open →other · source link
- GS3976__ER Spreadsheet_9thMP_CSM_v2.xlsx (Performance Review no. 9)Open →other · source link
- 2024_08_05_FVR_Santa Marta_Clean.pdf (Performance Review no. 9)Open →verification · source link
- 241014_GS4GG MR_SantaMarta_9thMP_v5_Clean.pdf (Performance Review no. 9)Open →monitoring · source link
- GS3976__ER Spreadsheet_9thMP_CSM_v3.xlsx (Performance Review no. 9)Open →other · source link
- 2024_10_16_FVR_Santa Marta_Clean.pdf (Performance Review no. 9)Open →verification · source link
- 240711_GS4GG MR_SantaMarta_9thMP_v4 (clean).pdf (Performance Review no. 9)Open →monitoring · source link
- GS3976_ER Spreadsheet_10thMP_CSM_v3.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS4GG MR_SantaMarta_10thMP_v4_Clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- 2026_03_05_FVR_Santa Marta_10MP_Clean.pdf (Performance Certification | Project no. 1)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to Pro