Akbuk Wind Farm Project Turkey
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Korkmaz Wind Farm Project PDD v1.0 (Ayen Enerji A.Ş., ACM0002 v16.0, GS1018) — sister project PDD explicitly referencing GS436 Akbük; most detailed available Ayen Enerji ACM0002 PDDDownload →pdd · hosted copy · 2,176 KB
- Gold Standard Marketplace listing for Akbük Wind Farm Project, Turkey (GS436/ID741)Open →other · source link
- DMG Mori project card: Akbük Wind Farm Project GS436 (67,570 tCO2/yr, 472,988 tCO2 cumulative, validator Re Carbon Ltd.)Download →other · hosted copy · 286 KB
- Re Carbon Ltd. Gold Standard Projects Registry (showing Akbük Wind Farm Project: 5th Verification Issued; CP Renewal Validation Registered)Download →verification · hosted copy · 621 KB
- Validation Report 18.12.2008_rev1.pdf (Design Review)Download →verification · hosted copy · 344 KB
- (1)PDD_09-11-2015.pdf (Design Review)Download →pdd · hosted copy · 2,176 KB
- (1)Monitoring Report_1st monitoring period_19-03-2009 to 31-03-2010_v1.1.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 615 KB
- (1)Verification Report_1st monitoring period_19-03-2009 to 31-03-2010_v2.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_2nd monitoring period_01-04-2010 to 31-03-2011_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01-04-2010 to 31-03-2011_v1.1.pdf (Performance Review no. 2)Open →verification · source link
- (1)Monitoring Report_3rd monitoring period_01-04-2011 to 31-12-2011_v4.pdf (Performance Review no. 3)Download →monitoring · hosted copy · 424 KB
- (1)Verification Report_3rd monitoring period_01-04-2011 to 31-12-2011_v2.pdf (Performance Review no. 3)Open →verification · source link
- (1)Monitoring Report_4th monitoring period_01-01-2012 to 31-12-2012_v3.pdf (Performance Review no. 4)Open →monitoring · source link
- (1)Verification Report_4th monitoring period_01-01-2012 to 31-12-2012_v1.2.pdf (Performance Review no. 4)Download →verification · hosted copy · 403 KB
- Akbük WPP_Transition-Annex_v3_20200709_clean.docx (Transition Review)Open →other · source link
- Final_Val Report_623 Akbuk wind_Seda Atabek_v04_28-07-2022.pdf (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- Final_ER Calculations_623 Akbuk wind_v5_26072022.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- FVR_GS.VAL(VER).22.65_v1.3_Akbuk WFP.pdf (Performance Review no. 6)Open →verification · source link
- AkbukWFP_MR_v4_clean_24112023.pdf (Performance Review no. 6)Open →monitoring · source link
- GS436-Akbuk_WFP-Annual_Report-2021.pdf (Performance Review no. 6)Open →other · source link
- ER calculations_AkbükWFP_MP1_v2_clean.xlsx (Performance Review no. 6)Open →other · source link
- CM_Akbük WPP_v3_04012024.xlsx (Crediting Period Renewal no. 2)Open →other · source link
- GS436-Akbuk_WF-Annual_Report-2022.pdf (Crediting Period Renewal no. 2)Open →other · source link
- Open →
- Final_SDG Impact Tool_AkbukWFP_v01.xlsx (Crediting Period Renewal no. 2)Open →other · source link
- GS.VAL.22.65 Akbuk_FVR_CL.pdf (Crediting Period Renewal no. 2)Open →verification · source link
- GS436-Akbuk_WFP-Annual_Report-2023.pdf (Annual Report no. 1)Open →other · source link
- GS436-Akbuk_WFP-Annual_Report-2024.pdf (Annual Report no. 2)Open →other · source link
- GS436_430_V1.3_IQ_SDG-Impact-tool_v3.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS436_ER_26022026.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS436_MR_08_12052026 - clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS436_FVR_Akbük WPP_04032026.pdf (Performance Certification | Project no. 1)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia