Electricity generation from mustard crop residues: Tonk India
Renewable Energy · Biomass · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM SSC-PDD: 7.5 MW Biomass (Mustard Crop Residue) based Power Project — Amrit Environmental Technologies Pvt. Ltd. (predecessor/pre-correction PDD read in full; structurally identical to registered KDownload →pdd · hosted copy · 1 KB
- Registered CDM-PDD for Project 1774: Electricity generation from mustard crop residues: Tonk, India (2027 KB; Crediting Period 1) — access-restricted PDFDownload →pdd · hosted copy · 1 KB
- TÜV SÜD Validation Report for CDM Project 1774 (316 KB) — access-restricted PDFDownload →verification · hosted copy · 1 KB
- TÜV SÜD Verification & Certification Report, monitoring period 01 Oct 2018–31 Dec 2019, 63,157 CERs issued (318 KB, VVS-PA 2.0)Download →verification · hosted copy · 1 KB
- Revised Monitoring Plan for Project 1774 (114 KB; approved 24 Jan 2012) — access-restricted PDFDownload →monitoring · hosted copy · 1 KB
- UNFCCC CDM Registry: Project 1774 main page (metadata, issuance history, all document links)Download →other · hosted copy · 1 KB
- UNFCCC CDM Registry: Project 1774, Crediting Period 2 renewal pageDownload →other · hosted copy · 1 KB
- Post-Registration Change PRC-1774-001 (permanent monitoring plan change, TÜV SÜD, crediting period 2015-2022)Download →other · hosted copy · 1 KB
- AMS-I.D. ver. 11 & ver. 18: Grid connected renewable electricity generation (CDM methodology)Download →methodology · hosted copy · 1 KB
- (3)PDD 23.12.2015_v10.pdf (Preliminary Review)Open →pdd · source link
- Validation Report 03.01.2012_v2.pdf (Design Review)Open →verification · source link
- Monitoring Report_1st monitoring period_07.10.2008 to 28.02.2009_v1.1.pdf (Performance Review no. 1)Open →monitoring · source link
- (3)Verification Report_1st monitoring period_07.10.2008 to 28.02.2009_v2.3.pdf (Performance Review no. 1)Open →verification · source link
- (3)Monitoring Report_2nd monitoring period_01.03.2009 to 28.02.2011_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- (3)Verification Report_2nd monitoring period_01.03.2009 to 28.02.2011_v2.pdf (Performance Review no. 2)Open →verification · source link
- (3)Verification Report_3rd monitoring period_01.03.2011 to 30.06.2012_v3.pdf (Performance Review no. 3)Open →verification · source link
- (3)Monitoring Report_3rd monitoring period_01.03.2011 to 30.06.2012_v2.2.pdf (Performance Review no. 3)Open →monitoring · source link
- (3)Monitoring Report_4th monitoring period_01.07.2012 to 28.02.2014_v3.pdf (Performance Review no. 4)Open →monitoring · source link
- (3)Verification Report_4th monitoring period_01.07.2012 to 28.02.2014_v1.pdf (Performance Review no. 4)Open →verification · source link
- (4)Monitoring Report_5th monitoring period_01.03.2014 to 06.10.2015_v1.pdf (Performance Review no. 5)Open →monitoring · source link
- (2)Verification Report_5th monitoring period_01.03.2014 to 06.10.2015_v2.pdf (Performance Review no. 5)Open →verification · source link
- (3)Verification Report_6th monitoring period_07.10.2015 to 31.03.2017_v2.pdf (Performance Review no. 6)Open →verification · source link
- (3)Monitoring Report_6th monitoring period_07.10.2015 to 31.03.2017_v2.pdf (Performance Review no. 6)Open →monitoring · source link
- (4)Verification Report_7th monitoring period_01.04.2017 to 30.09.2018_v3.pdf (Performance Review no. 7)Open →verification · source link
- (5)Monitoring Report_7th monitoring period_01.04.2017 to 30.09.2018_v2.pdf (Performance Review no. 7)Open →monitoring · source link
- Monitoring Report_8th monitoring period_01.10.2018 to 31.12.2019_v2.1.pdf (Performance Review no. 8)Open →monitoring · source link
- Verification Report_8th monitoring period_01.10,.2018 to 31.12.2019_v2.1.pdf (Performance Review no. 8)Open →verification · source link
- T-PerfCert_V2.0-Project-Annual-Report-Form.pdf (Performance Review no. 10)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Biomass →- BBBSiam Cement Biomass ProjectThailand
- BBBJilin Liaoyuan 50MW Level Biomass Cogeneration ProjectChina
- BBBLiucheng Biomass Power Generation Project in Guangxi Zhuang Autonomous Region, ChinaChina
- BBBViñales biomass power plantChile
- BBBHenan Xinxiang 24MW Biomass based Cogeneration ProjectChina
- BBBWaste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM)Russia