100 MW Wind Power Project in Andhra Pradesh by OAWPPL
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- 100.8 MW Wind Power Project in Beluguppa, Andhra Pradesh — CDM PDD (related Orange Renewable entity OUWPPL; ACM0002 ver. 17; TÜV NORD validation Feb–Mar 2017)Download →pdd · hosted copy · 1 KB
- CDM Validation Page: 100.8 MW Wind Power Project in Beluguppa, Andhra Pradesh (OUWPPL)Download →other · hosted copy · 1 KB
- ADB Social & Environmental Due Diligence Report — Orange Anantapur Wind Power Pvt Ltd (OAWPPL), ADB Loan 46268-002, July 2016Open →other · source link
- Ecologi Project Page — Wind Energy in Andhra Pradesh, India (links to Gold Standard Registry ID 809)Download →other · hosted copy · 100 KB
- Open →
- Monitoring Report_1st monitoring period_28-03-16 to 31-03-18_v4.0.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_1st monitoring period_28-03-16 to 31-03-18_v2.0.pdf (Preliminary Review)Open →verification · source link
- GS Passport_26-01-18.pdf (Preliminary Review)Open →other · source link
- PDD_26-01-18.pdf (Preliminary Review)Open →pdd · source link
- PDD_26-01-2018_v4.pdf (Design Review)Open →pdd · source link
- GS Passport_26-01-2018_v3.pdf (Design Review)Open →pdd · source link
- Validation Report_monitoring period_24-02-2015 to 31-10-2017_v2.2.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring Report_1st monitoring period_28-03-2016 to 31-03-2018_v4.pdf (Performance Review no. 1)Open →monitoring · source link
- Monitoring Report_monitoring period_01-04-2018 to 03-03-2020_v4.pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_monitoring period_01-04-2018 to 20-07-2020_v4.pdf (Performance Review no. 2)Open →verification · source link
- Verification Report_monitoring period_01-04-2018 to 16-04-2020_v2.pdf (Performance Review no. 2)Open →verification · source link
- Monitoring Report_monitoring period_01-04-2018 to 03-03-2020_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- FVR verification_GS 4557_TQC 7421.pdf (Performance Review no. 3)Open →verification · source link
- Monitoring-Report-Anantapur_AR.pdf (Performance Review no. 3)Open →monitoring · source link
- Anantapur_ER-Version 2.0.xlsx (Performance Review no. 3)Open →other · source link
- FVeR_GS4557 TQC_9523_v2.1_CL.pdf (Performance Review no. 4)Open →other · source link
- Monitoring-Report_GS4557_v7.0_CL.pdf (Performance Review no. 4)Open →monitoring · source link
- Annual Report_GS_4557.pdf (Performance Review no. 4)Open →other · source link
- ER sheet_GS4557_V6.xlsx (Performance Review no. 4)Open →other · source link
- Open →
- FVR _GS 4557_RCP_TQC_54722__GS Review R3_10.10.2024_Clean.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- ER Sheet_GS4557_3.10.24.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS4557-SDG-Impact-Tool.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Project-Annual-Report_GS4557 for 2024.pdf (Annual Report no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia