Vaayu India Wind Power Project in Andhra Pradesh
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Vaayu India Wind Power Project in Andhra Pradesh – Approved Project Design Document (revised, 1,057 KB, approved 22 Nov 2012)Download →pdd · hosted copy · 1 KB
- Vaayu India Wind Power Project in Andhra Pradesh – Original PDD submitted for validation (457 KB)Download →pdd · hosted copy · 1 KB
- Validation Report – DNV-CUK (1,426 KB)Download →verification · hosted copy · 1 KB
- Validation Opinion on PRC Changes (PRC-4677-001) – SGS (1,462 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report – Period 7: 02 Jan 2019 – 01 Apr 2020 (1,545 KB, latest available)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 6: 03 Sep 2016 – 01 Jan 2019 (632 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 5: 25 Sep 2014 – 02 Sep 2016 (575 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project Page #4677 – Vaayu India Wind Power Project in Andhra Pradesh (live registry record)Download →other · hosted copy · 1 KB
- ACM0002 ver.11 – Consolidated methodology for grid-connected electricity generation from renewable sourcesDownload →methodology · hosted copy · 1 KB
- PDD 03.02.2011_v4.pdf (Preliminary Review)Download →pdd · hosted copy · 680 KB
- GS Passport_07.12.2016_v1.3.pdf (Preliminary Review)Open →other · source link
- (1)Verification Report_1st monitoring period_25.09.2014 to 02.09.2016_v3.pdf (Performance Review no. 1)Download →verification · hosted copy · 373 KB
- (1)Monitoring Report_1st monitoring period_25.09.2014 to 02.09.2016_v1.3.pdf (Performance Review no. 1)Open →monitoring · source link
- GS_FVR_VERIFICATION REPORT_v02.1Aa_20IQMD13_12 November 2020.pdf (Performance Review no. 2)Download →verification · hosted copy · 547 KB
- Open →
- MR (GS4603) ver-3 (03Sep2016-01Aug2018)_12Nov2020 (Clean_final).pdf (Performance Review no. 2)Download →monitoring · hosted copy · 1,324 KB
- Deviation-Request-Form_v5.0_updated_SC_FINAL.pdf (Performance Review no. 3)Open →other · source link
- FVR_GCEES_2520_Vaayu India Wind Project.pdf (Performance Review no. 3)Download →verification · hosted copy · 309 KB
- MR (4677)_ver03_22July2020_clean.pdf (Performance Review no. 3)Download →monitoring · hosted copy · 944 KB
- T-PerfCert_V1.1-MR_GS4603 (ver03.1)_25May2022 (clean).pdf (Performance Review no. 3)Download →monitoring · hosted copy · 949 KB
- FVR_GS VER_ GS ID 4603_19.04.2022.pdf (Performance Review no. 3)Download →verification · hosted copy · 531 KB
- Other Document 3 (GS 4603 Transition-Annex (ver 2.0)- Clean.docx).docx (Transition Review)Open →other · source link
- MR_4603_Clean-01_09_23.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 875 KB
- GS4GG Performance Review Template_4603_08112022_SC.docx (Performance Review no. 4)Open →other · source link
- FVR GS.4603_v2.0_clean.pdf (Performance Review no. 4)Download →verification · hosted copy · 896 KB
- GS ER _Vaayu Andhra_ver02 29_08_23.xlsx (Performance Review no. 4)Open →other · source link
- GS ER _Vaayu Andhra_ver02 29_08_23(1).xlsx (Performance Review no. 4)Open →other · source link
- Project-Design-Document.pdf (Transition Review)Download →pdd · hosted copy · 425 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia