InfraVest Changbin and Taichung bundled Wind Farms Project - Taiwan (300190)
Renewable Energy · Wind · Taiwan
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- ARKTIK GmbH Project Description Sheet — Wind Energy in Changbin and Taichung, Taiwan (GS472, 2018)Download →other · hosted copy · 156 KB
- Gold Standard Registry Credit Block — GS472, 2011 Vintage (Serial GS1-1-TW-472-12-2011-226-159009-161680)Download →other · hosted copy · 2 KB
- Gold Standard Registry Credit Block — GS472, 2013 Vintage (Serial GS1-1-TW-GS472-12-2013-3497-82235-89734)Download →other · hosted copy · 2 KB
- GoldPower Project Page — Changbin and Taichung GoldPower Project (additionality narrative, co-benefits)Open →other · source link
- NatureOffice Project Page — Changbin and Taichung Wind Power (technical specifications)Open →other · source link
- NGS Super FY2020-21 Carbon Disclosure Statement (identifies 2017-vintage GS472 VER credits)Download →other · hosted copy · 1,921 KB
- Verification Report_9th monitoring period_01-04-2016 to 31-12-2016_v2.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_7th monitoring period_01-14-2015 to 03-31-2015_v2.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_5th monitoring period_26-12-2012 to 31-03-2014_v2.1.pdf (Preliminary Review)Open →monitoring · source link
- (1)PDD_02.25.2015_v3.pdf (Preliminary Review)Open →pdd · source link
- Verification Report_5th monitoring period_12-26-2012 to 03-31-2014_v1.1.pdf (Preliminary Review)Open →verification · source link
- (1)Verification Report_11th monitoring period_01-01-2018 to 31-12-2018_v1.1.pdf (Preliminary Review)Open →verification · source link
- GS Stakeholder Consultation Report 02.12.2008.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_6th monitoring period_01-04-2014 to 13-01-2015_v2.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_4th monitoring period_28-12-2011 to 25-12-2012_v1.1.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_6th monitoring period_01-04-2014 to 13-01-2015_v2.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_8th monitoring period_04-01-2015 to 03-31-2016_v3.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_9th monitoring period_04-01-2016 to 12-31-2016_v2.pdf (Preliminary Review)Open →monitoring · source link
- (1)Monitoring Report_10th monitoring period_01-01-2017 to 31-12-2017_v3.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_7th monitoring period_14-01-2015 to 31-03-2015_v2.pdf (Preliminary Review)Open →verification · source link
- Verification Report_1st monitoring period_14-01-2008 to 28-12-2009.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_10th monitoring period_01-01-2017 to 31-12-2017_v3.pdf (Preliminary Review)Open →monitoring · source link
- (1)Monitoring Report_11th monitoring period_01-01-2018 to 31-12-2018_v2.pdf (Preliminary Review)Open →monitoring · source link
- (1)Validation Report_monitoring period_15-12-2014 to 17-12-2014.pdf (Design Review)Open →verification · source link
- PDD_03-06-2009.pdf (Design Review)Open →pdd · source link
- (1)PDD_25.12.2014_v2.pdf (Design Review)Open →pdd · source link
- GS Validation Report 12.01.2015.pdf (Design Review)Open →verification · source link
- CDM PDD 29.10.2012_v1.pdf (Design Review)Open →pdd · source link
- Validation Report_monitoring period_15-12-2014 to 17-12-2014.pdf (Design Review)Open →verification · source link
- CDM PDD 25.07.2008_v1.pdf (Design Review)Open →pdd · source link
- PDD_25-02-2015.pdf (Design Review)Open →pdd · source link
- CDM PDD 26.11.2014_v1.pdf (Design Review)Open →pdd · source link
- Validation Report_monitoring period_28-01-2009 to 26-02-2009.pdf (Design Review)Open →verification · source link
- (1)Validation Report_12.01.2015_rev2.pdf (Design Review)Open →verification · source link
- (1)Verification Report_1st monitoring period_14-01-2008 to 28-12-2009.pdf (Performance Review no. 1)Open →verification · source link
- Monitoring Report_11th monitoring period_01-01-2018 to 31-12-2018_v2.pdf (Performance Review no. 2)Open →monitoring · source link
- Verification Report_11th monitoring period_01-01-2018 to 31-12-2018_v1.1.pdf (Performance Review no. 2)Open →verification · source link
- (1)gs472transitionreview.zip (Performance Review no. 3)Open →other · source link
- gs472transitionreview.zip (Performance Review no. 3)Open →other · source link
- 472-Transition-Annex-20190530-clean.pdf (Performance Review no. 3)Open →other · source link
- (1)Monitoring Report_4th monitoring period_28-12-2011 to 25-12-2012_v1.1.pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_monitoring period_01-01-2019 to 31-12-2019_v2.pdf (Performance Review no. 4)Open →verification · source link
- GS472 Infravest changbin and tai_chu_ng_1_2th-M__R-v3.doc (Performance Review no. 12)Open →other · source link
- GS472_Changbin and Taichung_12th MP_VR_TC.pdf (Performance Review no. 12)Open →verification · source link
- GS472_13th_ER calculation.xls (Performance Review no. 13)Open →other · source link
- GS472 Infravest changbin_ and ta_i_ch_u_ng__1__3_t_h-M___R-v1.1-track.docx (Performance Review no. 13)Open →other · source link
- GS472_Changbin and Taichung_13th MP_VR_V01.2_approved.pdf (Performance Review no. 13)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia