*Rotor Elektrik Uretim Osmaniye Wind Farm
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- EBRD Project Summary Document — Rotor Wind Farm (Project 40059)Download →other · hosted copy · 152 KB
- Environmental and Social Impact Assessment for the Bahce Windfarm Project (135 MW) — Zorlu Enerji-Rotor Elektrik (archived)Download →other · hosted copy · 9 KB
- Monitoring Report_3rd monitoring period_01-02-2011 to 31-12-2012 _v3.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_4th monitoring period_01-01-2013 to 31-12-2013_v3.doc (Preliminary Review)Open →monitoring · source link
- Verification Report_5th monitoring period_01-01-2014 to 06-08-2016_v1.2.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_2nd monitoring period_01-04-2010 to 31-01-2011_v5.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_4th monitoring period_01-01-2013 to 31-12-2013.pdf (Preliminary Review)Open →verification · source link
- PDD_31-05-2017.pdf (Preliminary Review)Open →pdd · source link
- Verification Report_2nd monitoring period_01-04-2010 to 31-01-2011_v2.pdf (Preliminary Review)Open →verification · source link
- Verification Report_1st monitoring period_07-08-2009 to 31-03-2010.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_1st monitoring period_07-08-2009 to 31-03-2010_v3.pdf (Preliminary Review)Open →monitoring · source link
- Verification Report_3rd monitoring period_01-02-2011 to 31-12-2012_v2.1.pdf (Preliminary Review)Open →verification · source link
- Monitoring Report_5th monitoring period_01-01-2014 to 06-08-2016_v0.3.pdf (Preliminary Review)Open →monitoring · source link
- PDD_03-12-2008.pdf (Design Review)Open →pdd · source link
- (1)PDD_31-05-2017.pdf (Design Review)Open →pdd · source link
- PDD-13-12-2008.pdf (Design Review)Open →pdd · source link
- PDD_19-08-2008.pdf (Design Review)Open →pdd · source link
- GS Validation Report_31.01.2009_v3.pdf (Design Review)Open →verification · source link
- GS Validation Report_21.10.2008_v7.pdf (Design Review)Open →verification · source link
- GS Validation Report_05.06.2017_v2.pdf (Design Review)Open →verification · source link
- (1)Verification Report_1st monitoring period_07-08-2009 to 31-03-2010.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_07-08-2009 to 31-03-2010_v3.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01-04-2010 to 31-01-2011_v2.pdf (Performance Review no. 2)Open →verification · source link
- (1)Monitoring Report_2nd monitoring period_01-04-2010 to 31-01-2011_v5.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_3rd monitoring period_01-02-2011 to 31-12-2012_v2.1.pdf (Performance Review no. 3)Open →verification · source link
- 101.5-Transition-Annex- Rotor Wind.docx (Performance Review no. 3)Open →other · source link
- (1)Monitoring Report_3rd monitoring period_01-02-2011 to 31-12-2012 _v3.pdf (Performance Review no. 3)Open →monitoring · source link
- (1)Verification Report_4th monitoring period_01-01-2013 to 31-12-2013.pdf (Performance Review no. 4)Open →verification · source link
- (1)Monitoring Report_4th monitoring period_01-01-2013 to 31-12-2013_v3.doc (Performance Review no. 4)Open →monitoring · source link
- (1)Verification Report_5th monitoring period_01-01-2014 to 06-08-2016_v1.2.pdf (Performance Review no. 5)Open →verification · source link
- (1)Monitoring Report_5th monitoring period_01-01-2014 to 06-08-2016_v0.3.pdf (Performance Review no. 5)Open →monitoring · source link
- FVR_Rotor WFP_19XTMD9_Rev 1.1Aa_26042021.pdf (Performance Review no. 6)Open →verification · source link
- GS474 Rotor Wind Farm MR v5 wotc 23032021.pdf (Performance Review no. 6)Open →monitoring · source link
- GS474 Rotor Wind Farm MR v7 wtc 11112021.docx (Performance Review no. 6)Open →monitoring · source link
- GS 474 Rotor Elektrik Üretim Osmaniye Wind Farm Monitring Period Emission Reduction Calc v7 27072021.xls (Performance Review no. 6)Open →other · source link
- 101.5-Transition-Annex- Rotor Wind v2.docx (Performance Review no. 6)Open →other · source link
- FVR_Rotor WFP_19XTMD9_Rev 2.0Aa_13092021.pdf (Performance Review no. 6)Open →verification · source link
- ER_calculations_v4_Gökçedağ_WPP_24.05.2023.xlsx (Performance Review no. 7)Open →other · source link
- GS_FVR_Rotor WPP_22TQMD11_Rev 5.0Aa_26062023 .pdf (Performance Review no. 7)Open →verification · source link
- Gokcedag_GS474 Rotor Wind Farm MR_v4_24.05.2023.pdf (Performance Review no. 7)Open →monitoring · source link
- Rotor_WPP-Project-Annual-Report.pdf (Performance Review no. 8)Open →other · source link
- 430_V1.3_IQ_SDG-Impact-tool.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS_RCP REPORT_2023TQMD55_Rotor WPP_Rev 3.0Aa_31072024.pdf (Crediting Period Renewal no. 1)Open →other · source link
- GS474_ER Sheet_V04.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Open →
- CCIPL 2486 GS474 FVR.pdf (Performance Certification | Project no. 1)Open →verification · source link
- GS474_ER_V04.xlsx (Performance Certification | Project no. 1)Open →other · source link
- 430_V1.3_IQ_SDG-Impact-tool_GS474_V03.xlsx (Performance Certification | Project no. 1)Open →other · source link
- GS474_MR_V04_27022025_clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS474_MR_V04_3rdCP_011025_clean.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
- CCIPL 2486 GS474 FVR _CP3_(CC).pdf (Performance Certification | Project no. 2)Open →verification · source link
- 430_V1.3_IQ_SDG-Impact-tool_GS474_V04_131025.xlsx (Performance Certification | Project no. 2)Open →other · source link
- GS474_ER_V03_3rdCP_10092025.xlsx (Performance Certification | Project no. 2)Open →other · source link
- Rotor WFP-Annual Report 2024.pdf (Annual Report no. 1)Open →other · source link
- GS474_ER_CP3-MP2_v05.xlsx (Performance Certification | Project no. 3)Open →other · source link
- GS474_MR_CP3-MP2_v08_clean.pdf (Performance Certification | Project no. 3)Open →monitoring · source link
- SDG-Impact-tool_GS474_CP3-MP2_v07.xlsx (Performance Certification | Project no. 3)Open →other · source link
- FVR_GS_VER_REP_ROTOR ELEKTRIK URETIM OSMANIYE WIND FARM_2025TQCE555_Rev 4.0Aa_20042026.pdf (Performance Certification | Project no. 3)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia