Amayo 40 MW Wind Power Project – Nicaragua
Renewable Energy · Wind · Nicaragua
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Amayo 40 MW Wind Power Project - Nicaragua CDM-PDD Version 1 (21 April 2008)Download →pdd · hosted copy · 389 KB
- Amayo 40 MW Wind Power Project - Nicaragua CDM-PDD (UNFCCC official copy)Download →pdd · hosted copy · 1 KB
- Validation Report (SGS-UKL, 977 KB) — UNFCCC CDM Project 2315Download →verification · hosted copy · 1 KB
- Monitoring Report 12 Apr 2009 – 30 Sep 2009Download →monitoring · hosted copy · 1 KB
- Monitoring Report 01 Oct 2009 – 31 Aug 2010Download →monitoring · hosted copy · 1 KB
- Monitoring Report 01 May 2013 – 30 Jun 2014Download →monitoring · hosted copy · 1 KB
- Revised Monitoring Plan (approved 08 Sep 2011)Download →monitoring · hosted copy · 1 KB
- CDM UNFCCC Registry Page — Project 2315: Amayo 40 MW Wind Power ProjectDownload →other · hosted copy · 1 KB
- Appendix 1 – Financial Additionality Analysis (Excel)Download →other · hosted copy · 1 KB
- ACM0002 ver. 7 – Consolidated methodology for grid-connected electricity generation from renewable sourcesDownload →methodology · hosted copy · 1 KB
- DEV_280.pdf (Preliminary Review)Open →other · source link
- DEV_300 (1).pdf (Preliminary Review)Open →other · source link
- Monitoring Report_4th monitoring period_05-01-2011 to 03-31-2012_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 278 KB
- Verification Report_8th monitoring period_07-01-2015 to 04-11-2016.pdf (Preliminary Review)Open →verification · source link
- Verification Report_9th monitoring period_12-04-2016 to 30-06-2017_v1.pdf (Preliminary Review)Download →verification · hosted copy · 1,078 KB
- Monitoring Report_8th monitoring period_07-01-2015 to 04-11-2016_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 980 KB
- PDD_29-09-2015.pdf (Preliminary Review)Download →pdd · hosted copy · 2,973 KB
- Verification Report_7th monitoring period_01-07-2014 to 30-06-2015_v1.1.pdf (Preliminary Review)Download →verification · hosted copy · 986 KB
- Monitoring Report_9th monitoring period_07-28-2016 to 06-30-2017_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 902 KB
- Verification Report_4th monitoring period_05-01-2011 to 03-31-2012.pdf (Preliminary Review)Download →verification · hosted copy · 1,335 KB
- PDD_01-04-2016.pdf (Preliminary Review)Download →pdd · hosted copy · 2,083 KB
- Monitoring Report_5th monitoring period_01-04-2012 to 30-04-2013_v3.1.pdf (Preliminary Review)Download →monitoring · hosted copy · 212 KB
- Verification Report_3rd monitoring period_01-09-2010 to 30-04-2011_v1.pdf (Preliminary Review)Download →verification · hosted copy · 1,587 KB
- PDD_21-04-2008.pdf (Preliminary Review)Download →pdd · hosted copy · 389 KB
- Monitoring Report_2nd monitoring period_10-01-2009 to 08-31-2010_v5.pdf (Preliminary Review)Download →monitoring · hosted copy · 530 KB
- Monitoring Report_1st monitoring period_04-12-2009 to 09-30-2009_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 209 KB
- Verification Report_6th monitoring period_05-01-2013 to 06-30-2014.pdf (Preliminary Review)Download →verification · hosted copy · 1,317 KB
- Monitoring Report_6th monitoring period_05-01-2013 to 06-31-2014_v3.pdf (Preliminary Review)Download →monitoring · hosted copy · 584 KB
- PDD_01-08-2010.pdf (Preliminary Review)Download →pdd · hosted copy · 4,127 KB
- Verification Report_1st monitoring period_04-12-2009 to 09-30-2009_v1.pdf (Preliminary Review)Download →verification · hosted copy · 399 KB
- Monitoring Report_7th monitoring period_07-01-2014 to 06-30-2015_v2.pdf (Preliminary Review)Download →monitoring · hosted copy · 618 KB
- Verification Report_5th monitoring period_04-01-2012 to 04-30-2013_v1.pdf (Preliminary Review)Download →verification · hosted copy · 1,007 KB
- Monitoring Report_3rd monitoring period_01-09-2010 to 30-04-2011_v1.pdf (Preliminary Review)Download →monitoring · hosted copy · 280 KB
- Verification Report_2nd monitoring period_10.01.2009 to 08.31.2010_rev1.pdf (Preliminary Review)Download →verification · hosted copy · 1,584 KB
- Monitoring Report_9th monitoring period_12-04-2016 to 30-06-2017_v6.pdf (Preliminary Review)Download →monitoring · hosted copy · 307 KB
- (1)PDD_01-04-2016.pdf (Design Review)Download →pdd · hosted copy · 2,083 KB
- Validation Report 02.09.2015_v1.pdf (Design Review)Download →verification · hosted copy · 549 KB
- Validation Report for crediting renewal 2016.pdf (Design Review)Download →verification · hosted copy · 507 KB
- Verification Report_1st monitoring period_12-04-2009 to 30-09-2009.pdf (Performance Review no. 1)Download →verification · hosted copy · 357 KB
- Monitoring Report_monitoring period_12-04-2009 to 30-09-2009.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 99 KB
- Monitoring Report_2nd monitoring period_01-10-2009 to 31-08-2010.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 185 KB
- Verification Report_2nd monitoring period_01-10-2009 to 31-08-2010.pdf (Performance Review no. 2)Download →verification · hosted copy · 1,007 KB
- Verification Report_3rd monitoring period_01-09-2010 to 30-04-2011.pdf (Performance Review no. 3)Download →verification · hosted copy · 1,587 KB
- 101.5-Transition-Annex Amayo I_latest.pdf (Performance Review no. 3)Open →other · source link
- Monitoring Report_2nd monitoring period_01-07-2017 to 30-09-2018_v4.pdf (Performance Review no. 3)Open →monitoring · source link
- Verification Report_1st monitoring period_01-07-2017 to 30-09-2018.pdf (Performance Review no. 3)Open →verification · source link
- Verification Report_2nd monitoring period_01-07-2017 to 30-09-2018.pdf (Performance Review no. 3)Open →verification · source link
- Monitoring Report_2nd monitoring period_01-07-2017 to 30-09-2018.pdf (Performance Review no. 3)Open →monitoring · source link
- Monitoring Report_3rd monitoring period_01-09-2010 to 30-04-2011.pdf (Performance Review no. 3)Open →monitoring · source link
- 2020_05_08_FVeR_Amayo I_final.pdf (Performance Review no. 4)Open →other · source link
- Monitoring Report_4th monitoring period_01-05-2011 to 31-03-2012.pdf (Performance Review no. 4)Open →monitoring · source link
- PA2315_MR A1 Oct2018-Jan2020.pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_4th monitoring period_01-05-2011 to 31-03-2012.pdf (Performance Review no. 4)Open →verification · source link
- A1 3MP 2018-2020-MR (-PC-V1.1) - V2 clean.docx (Performance Review no. 4)Open →monitoring · source link
- (1)PA2315_MR A1 Oct2018-Jan2020.pdf (Performance Review no. 11)Open →monitoring · source link
- A1 3MP 2018-2020-MR (-PC-V1.1) - V2 Final GS FR.docx (Performance Review no. 11)Open →monitoring · source link
- 2021_12_30_FVR_GS_Amayo_I.pdf (Performance Review no. 11)Open →verification · source link
- (1)2020_05_08_FVeR_Amayo I_final.pdf (Performance Review no. 11)Open →other · source link
- (1)CERs Calculation Summary_v1_Amayo 1_3MP_02.14.2020.xlsx (Performance Review no. 11)Open →other · source link
- A1 3MP 2018-2020-MR (-PC-V1.1) - V2 Final GS FR.pdf (Performance Review no. 11)Open →monitoring · source link
- Open →
- FVR_GS Amayo I_clean.pdf (Performance Review no. 12)Open →verification · source link
- 4MP 2020-2021-MR (-PC-V2.2)_ GS_26.10.2022 track changes.pdf (Performance Review no. 12)Open →monitoring · source link
- T-V5.0-Deviation-Request-Form AMAYO I GS567.pdf (Performance Review no. 12)Open →other · source link
- Modelo crosscheking-CNDC 2021 v3 (3010P y 3010R) 24.08.12.xlsx (Performance Review no. 12)Open →other · source link
- CDM.22.VER.015_FVR_Amayo 40 MW_5-12-2023_rev.pdf (Performance Review no. 13)Open →verification · source link
- V20-Project-Annual-Report-Form GS567_12042021 to 31032022 2023.pdf (Performance Review no. 13)Open →other · source link
- GS 567_ER Sheet_Amayo 40 MW_08-08-2023.xlsx (Performance Review no. 13)Open →other · source link
- Open →
- 430_V1.0_IQ_SDG-Impact-Tool GS ID 567 AMAYO I - Dec 26.2022(1).xlsx (Performance Review no. 13)Open →other · source link
- GS 567_MR_Amayo 40 MW_08-08-2023.pdf (Performance Review no. 13)Open →monitoring · source link
- 430_V1.0_IQ_SDG-Impact-Tool GS ID 567 AMAYO I.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS567 PDD Amayo I wind v1.2 01 Nov 22 - Clean.docx (Crediting Period Renewal no. 1)Open →pdd · source link
- T-V5.0-Deviation-Request-Form AMAYO I GS567 22 Ago 2022.pdf (Crediting Period Renewal no. 1)Open →other · source link
- GS567- FVR Amayo I.pdf (Crediting Period Renewal no. 1)Open →verification · source link
- Amayo_ER_Calculations_3rd Crediting Period v2.0 20 Oct 2022.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- Annual Report GS567 and GS828 Amayo.pdf (Performance Review no. 15)Open →other · source link
- 430_V1.3_IQ_SDG-Impact-tool (1) GS 567.xlsx (Performance Review no. 15)Open →other · source link
- GS567_ER Sheet_Amayo 40 MW.V2.xlsx (Performance Review no. 15)Open →other · source link
- GS567_FVR Clean_Amayo_05 05 2025.pdf (Performance Review no. 15)Open →verification · source link
- GS567_MR Clean_Amayo_19 03 2025.pdf (Performance Review no. 15)Open →monitoring · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia