200 MW Wind Power Project in Tamil Nadu by Orange Sironj
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Orange Renewable 200 MW Wind Tamil Nadu — PR Newswire Press Release (Oct 2017)Download →other · hosted copy · 169 KB
- Siemens Gamesa 200 MW EPC order Tamil Nadu — Renewable Energy Magazine (Dec 2017)Download →other · hosted copy · 59 KB
- GS6290 German-language project brochure (estyria.com, 2025) — located but access deniedOpen →other · source link
- PDD_01.29.2018_v1.pdf (Preliminary Review)Download →pdd · hosted copy · 973 KB
- PDD_04.25.2018_v2.docx (Preliminary Review)Download →pdd · hosted copy · 1,023 KB
- FVR-5617-GS VER-CLEAN.pdf (Design Review)Download →verification · hosted copy · 668 KB
- GS PDD ver 05- Clean.pdf (Design Review)Download →pdd · hosted copy · 2,554 KB
- Monitoring Report_monitoring period_07-03-2019 to 31-12-2019_v2.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 319 KB
- Monitoring Report_monitoring period_07-03-2019 to 30-09-2019_v2.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 319 KB
- GS4GG_Verification_report_CLEAN.pdf (Performance Review no. 2)Download →verification · hosted copy · 955 KB
- T-PerfCert_V1.1-Monitoring-Report GS6290_Clean.pdf (Performance Review no. 2)Download →monitoring · hosted copy · 431 KB
- Monitoring-Report 200 MW Version3_final.doc (Performance Review no. 3)Download →monitoring · hosted copy · 3,133 KB
- FVR verification_GS 6290_TQC 7122_final.docx (Performance Review no. 3)Download →verification · hosted copy · 262 KB
- ER sheet _Orange Sironj_final.xlsx (Performance Review no. 3)Open →other · source link
- ER sheet_GS 6290.xlsx (Performance Review no. 4)Open →other · source link
- GS6290 Orange Sironj Annual-Report_22_12_2022.pdf (Performance Review no. 4)Open →other · source link
- Monitoring-Report_Sironj 200 MW_GS 6290_v4.0_CL.pdf (Performance Review no. 4)Download →monitoring · hosted copy · 740 KB
- FVeR_GS 6290 TQC 9023_v3.0_CL.pdf (Performance Review no. 4)Open →other · source link
- ER sheet_RCP_GS-6290_V3.0_Clean.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- FVeR_GS 6290.pdf (Crediting Period Renewal no. 1)Open →other · source link
- VKU.F26W.Validation Report_VKU.VAL.07.23.GS_6290_V3.1_Clean.pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 2,120 KB
- 6290_SDG-Impact-tool(1).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- GS-6290_PDD_V5.0_Clean.pdf (Crediting Period Renewal no. 1)Download →pdd · hosted copy · 1,388 KB
- Project-Annual-Report_GS6290 for 2024.pdf (Annual Report no. 1)Open →other · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia