CECIC HKC Danjinghe Wind Farm Project
Renewable Energy · Wind · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CECIC HKC Danjinghe Wind Farm Project – Project Design Document (Original, ACM0002 v.6, 352 KB)Download →pdd · hosted copy · 1 KB
- CECIC HKC Danjinghe Wind Farm Project – Project Design Document (Crediting Period Renewal, ACM0002 v.16, 336 KB)Download →pdd · hosted copy · 1 KB
- Validation Report – CECIC HKC Danjinghe Wind Farm Project (DNV-CUK, 1080 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report – Period 01 Oct 2016 to 30 Sep 2018 (696 KB, Issued, 893,455 CERs)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 Oct 2018 to 31 Jul 2020 (308 KB, Issued, 792,394 CERs)Download →monitoring · hosted copy · 1 KB
- Monitoring Report – Period 01 May 2010 to 28 Feb 2011 (94 KB, Issued, 367,518 CERs)Download →monitoring · hosted copy · 1 KB
- CDM Project 2170 Registry Page – Crediting Period 1 (29 Dec 2008–28 Dec 2015)Download →other · hosted copy · 1 KB
- CDM Project 2170 Registry Page – Crediting Period 2 / Renewal (29 Dec 2015–28 Dec 2022)Download →other · hosted copy · 1 KB
- ACM0002 – Grid-connected electricity generation from renewable sources (UNFCCC CDM Methodology)Download →methodology · hosted copy · 1 KB
- PDD_2.0-danjinghe-JL_1203clean_version.docx (Preliminary Review)Open →pdd · source link
- Dangjinghe-SCR_1203_clean_version[1].doc (Preliminary Review)Open →other · source link
- Open →
- danjinghe_pdd.pdf (Design Review)Open →pdd · source link
- PDD_2.1-danjinghe-JL 190510[1].docx (Design Review)Open →pdd · source link
- Open →
- CECIC HKC Danjinghe Wind Farm Power project.pdf (Performance Review no. 1)Open →other · source link
- FVR_DX_1219_CECIC HKC Danjinghe Wind Farm Power project.pdf (Performance Review no. 1)Open →verification · source link
- PDD_3-danjinghe-JL 191031 Clean.docx (Performance Review no. 1)Open →pdd · source link
- MR_Danjinghe wind_GS6753_v2.0_track-final.pdf (Performance Review no. 2)Open →monitoring · source link
- FVR_DX_6920_CECIC HKC Danjinghe Wind Farm Power Project.pdf (Performance Review no. 2)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia