Hebei Yingxin Glass Group Co. Ltd. Glass Furnace Flue Gas Waste Heat To Energy Project (300502)
Industrial & Commercial · Waste Heat Recovery · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Gold Standard for the Global Goals Annual Report — Hebei Yingxin Glass Group Co. Ltd. Glass Furnace Flue Gas Waste Heat To Energy Project (GS ID 750), dated 09/10/2019Download →monitoring · hosted copy · 603 KB
- South Pole Stakeholder Consultation Page — Yingxin WHR Project (GS750, PMT ID 300502), 2009 Stakeholder Invitation and Non-Technical Summary (Chinese)Download →other · hosted copy · 551 KB
- South Pole Stakeholder Consultation Invitation Letter — 2nd Stakeholder Consultation, December 2009Download →other · hosted copy · 269 KB
- GS Passport_05.08.2011_v2.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_3rd monitoring period_01-04-2014 to 31-12-2016.pdf (Preliminary Review)Open →monitoring · source link
- Monitoring Report_3rd monitoring period_01-04-2014 to 31-12-2016_v2.0.pdf (Preliminary Review)Open →monitoring · source link
- (1)Verification Report_1st monitoring period_01.01.2010 to 12.31.2011_v1.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_1st monitoring period_01.01.2010 to 12.31.2011_v3.pdf (Performance Review no. 1)Open →monitoring · source link
- (1)Monitoring Report_2nd monitoring period_01.01.2012 to 03.31.2014_v3.2.pdf (Performance Review no. 2)Open →monitoring · source link
- (1)Verification Report_2nd monitoring period_01.01.2012 to 03.31.2014_v2.pdf (Performance Review no. 2)Open →verification · source link
- (1)Verification Report_4th monitoring period_01.01.2017 to 05.31.2018_v2.pdf (Performance Review no. 3)Open →verification · source link
- (1)Monitoring Report_4th monitoring period_01.01.2017 to 05.31.2018_v3.pdf (Performance Review no. 3)Open →monitoring · source link
- MR_Yingxin WHR_GS750_MP5_v2.0.pdf (Performance Review no. 4)Open →monitoring · source link
- Verification Report_Yingxin WHR GS750_MP5.pdf (Performance Review no. 4)Open →verification · source link
- Verification Report_Yingxin WHR GS750 MP5-202009.pdf (Performance Review no. 5)Open →verification · source link
- GS4GG Monitoring Report (MR_Yingxin WHR_GS750_v2.0_clean.pdf).pdf (Performance Review no. 5)Open →monitoring · source link
- MR_Yingxin WHR_GS750_v2.0_track.pdf (Performance Review no. 5)Open →monitoring · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Waste Heat Recovery →- BBBHyundai Steel Waste Energy Cogeneration ProjectSouth Korea
- BBBUpgrade of Dominican Power Partners' Los Mina power station from open cycle to combined cycle power generationDominican Republic
- BBBZhang Jiagang waste heat recovery from sulphuric acid production for electricity generation projectChina
- AThe CDQ Project in Tranvic GroupChina
- BBBElectricity generation by utilization of waste heat from calcined petroleum coke production processIndia
- BBBFerrosilicon waste heat power generation projectChina