Izmir Odemis Biogas Power Plant
Agriculture · Manure Methane Digester · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- 101.1 T PDD Page 1 of 34 Gold Standard for the Global GoalsDownload →pdd · hosted copy · 891 KB
- 101.1 T PDD Page 1 of 74 Gold Standard for the Global GoalsDownload →pdd · hosted copy · 1,425 KB
- GOLD STANDARD FOR THE GLOBAL GOALS (GS4GG) ...Download →verification · hosted copy · 881 KB
- Climate Security and Sustainable Development TEMPLATE GUIDE MONITORING REPORTDownload →monitoring · hosted copy · 521 KB
- 101.1-T-SCR-IZMIR ODEMIS BIOGAS POWER PLANT-GS7527 (PR Round 1 Revised Tracked Changes).docx (Preliminary Review)Open →other · source link
- ARF _GS_validation report_final-GS-3.docx (Design Review)Download →verification · hosted copy · 13,292 KB
- T-PPD_İzmir Ödemiş ARF V1.2-Project-Design-Document_02.07 (1).docx (Design Review)Download →pdd · hosted copy · 12,490 KB
- ARF_ER Calculation_10_09_2022.xlsx (Design Review)Open →other · source link
- Annual Report_2023-12-22.pdf (Performance Review no. 1)Open →other · source link
- 1979_FVR_MP1_SC R4_ CC(2).pdf (Performance Review no. 1)Download →verification · hosted copy · 4,746 KB
- Open →
- Annual Report 2022-12-21_132707.pdf (Performance Review no. 1)Open →other · source link
- Open →
- 430_V1.3_IQ_SDG-Impact-tool_GS7527_290325.xlsx (Performance Review no. 1)Open →other · source link
- 1979_MR_05082024_V8_28_03_2025_Clean.pdf (Performance Review no. 1)Download →monitoring · hosted copy · 3,202 KB
- DEV_278.pdf (Performance Review no. 1)Open →other · source link
- T-v1.1-Design-Change-Memo_GS7527 (1).docx (Design Change Review no. 1)Open →other · source link
- ER Calculation ARF_GWP28_EX Ante.xlsx (Design Change Review no. 1)Open →other · source link
- GS4GG Design Review_7527_Design Change Requirement_191124_REV08_Clean(1).pdf (Design Change Review no. 1)Open →other · source link
- CCIPL 1979 design change FVR_Final(1).pdf (Design Change Review no. 1)Open →verification · source link
- T-PerfCert_v3.0-Project-Annual-Report_2025_.pdf (Annual Report no. 1)Open →other · source link
- GS7527 ER Calculation Ex-Ante_CP2_23022026.xlsx (Design Certification Renewal | Project no. 2)Open →other · source link
- PDD V1.5_CP2_GS7527_Odemis Biogas Project.pdf (Design Certification Renewal | Project no. 2)Open →pdd · source link
- VKU.F26W.Validation Report for PA_VKU.VAL.32.25_GS_7527.pdf (Design Certification Renewal | Project no. 2)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Manure Methane Digester →- BBBShuangbaotai Animal Manure Management System GHG Mitigation Project in Jiangxi ProvinceChina
- BBBHeilongjiang Swine Farm Animal Waste Management System GHG Mitigation ProjectChina
- BBBAonong AWMS GHG Mitigation Project in Jiangxi ProvinceChina
- BBBMuyuan Nanyang Swine Farm Animal Waste Management System GHG Mitigation ProjectChina
- BBBGanzhou Swine Farm Animal Manure Management System GHG Mitigation ProjectChina
- BBBDongrui Animal Manure Management System GHG Mitigation Project in Heyuan CityChina