Mersin Wind Farm Project
Renewable Energy · Wind · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03.1. CDM – Executive BoardDownload →pdd · hosted copy · 1,752 KB
- Project design document form for CDM project activities (Version 07.0)Download →pdd · hosted copy · 2,016 KB
- April 2002 • NREL/SR-500-31188 J.W. Smith Electrotek Concepts, Inc.Open →other · source link
- Small Wind Site Assessment GuidelinesOpen →other · source link
- Wind Power Plant Monitoring Project Annual ReportOpen →monitoring · source link
- PDD_19-10-18.pdf (Preliminary Review)Open →pdd · source link
- GS-Passport_final_clean.pdf (Preliminary Review)Open →other · source link
- Monitoring Report_1st monitoring period_16-08-10 to 31-12-12_v3.0.doc (Preliminary Review)Open →monitoring · source link
- Mersin_WPP_Re-Validation_Report_Ver04_22.10.2018_GS_Review_Public_trackchange.pdf (Design Review)Open →verification · source link
- PDD_Mersin_Wind_Farm_Project__28092018_wtc.pdf (Design Review)Open →pdd · source link
- (1)Verification Report_2nd monitoring period_01-01-13 to 15-08-17_v4.0.pdf (Performance Review no. 1)Open →verification · source link
- (1)Monitoring Report_2nd monitoring period_01-01-13 to 15-08-17_v0.2.pdf (Performance Review no. 1)Open →monitoring · source link
- Monitoring-Report of 3rd verification Mersin WPP_v0.5_wotc.pdf (Performance Review no. 3)Open →verification · source link
- GS_VER_REP_Mersin WPP_21XTMD7_Rev 3.0Aa_28062021_approved.pdf (Performance Review no. 3)Open →other · source link
- Monitoring-Report of 4th verification Mersin WPP_v2_clean.pdf (Performance Review no. 4)Open →verification · source link
- Open →
- Mersin Wind Power Project 4th Monitoring Period ER Calculations_v02.xlsx (Performance Review no. 4)Open →monitoring · source link
- FVR_GS_VER_REP_Mersin Wind_2024TQMDCE419_Rev 4.0Aa_19032025.pdf (Performance Review no. 5)Open →verification · source link
- GS_VER_REP_Mersin Wind_2024TQMDCE419_Rev 1.1Aa_23092024.pdf (Performance Review no. 5)Open →other · source link
- T-PerfCert_V2.0-Project-Annual-Report of Mersin WPP_2022_final.pdf (Performance Review no. 5)Open →other · source link
- Mersin Wind Power Project 5th Monitoring Period ER Calculations_v0.1.xlsx (Performance Review no. 5)Open →monitoring · source link
- T-PerfCert_V2.0-Project-Annual-Report of Mersin WPP_2023.pdf (Performance Review no. 5)Open →other · source link
- Monitoring Report of 5th verification Mersin WPP_v0.4_wtc.pdf (Performance Review no. 5)Open →verification · source link
- Monitoring Report of 5th verification Mersin WPP_v0.2wotc.pdf (Performance Review no. 5)Open →verification · source link
- 430_V1.3_IQ_SDG-Impact-tool_Mersin WPP_v02.xlsx (Design Change Review no. 1)Open →other · source link
- Open →
- FVR_GS_RCP REPORT_2024TQCE420_Mersin_WPP_Rev 2.1Aa_26032025_VM.pdf (Design Change Review no. 1)Open →verification · source link
- Mersin_WPP-IRR_Calculation_v03.xlsx (Design Change Review no. 1)Open →other · source link
- GS753_Baseline Study_Mersin Wind Farm Project_v0.3.xlsx (Design Certification Renewal | Project no. 1)Open →other · source link
- GS753_Val Report_Mersin WPP_Rev 1.2_Clean.pdf (Design Certification Renewal | Project no. 1)Open →other · source link
- Open →
- _430_V1.3_IQ_SDG-Impact-tool_Mersin WPP_v03.xlsx (Design Certification Renewal | Project no. 1)Open →other · source link
- GS 753_IRR Calculation_Mersin_WPP_v03.xlsx (Design Certification Renewal | Project no. 1)Open →other · source link
- Open →
- Open →
- Monitoring Report of 6th verification Mersin WPP_v05_clean.pdf (Performance Certification | Project no. 1)Open →verification · source link
- GS753_FVR_Mersin WPP_Rev 1.2_Clean.pdf (Performance Certification | Project no. 1)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia