Saint Nikola Wind Farm
Renewable Energy · Wind · Bulgaria
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Saint Nikola Wind Farm — Project Design Document (PDD)Download →pdd · hosted copy · 931 KB
- Verra Registry Project Page — VCS1258Download →other · hosted copy · 3 KB
- ACM0002: Grid-connected electricity generation from renewable sources (CDM/UNFCCC)Download →methodology · hosted copy · 1 KB
- AGE_Elysium contract exec 19.11.2013.pdfOpen →other · source link
- AES_MR_Energy_generated_30 Dec.xlsxOpen →other · source link
- AES Geo Energy_MOEW_Letter_EN_BG.PDFOpen →other · source link
- MoEW retirement AAUs confirmation_ENG_BG.pdfOpen →other · source link
- VCS_V_REQUEST_DENIED_1258_05FEB2024.pdfOpen →other · source link
- 1ISS_PRR_ 1258_5Aug2016.pdfOpen →other · source link
- VCS_V4_PRR_1258_08MAY2025.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3.pdfOpen →other · source link
- PP_ISS_REP_1258_27APRIL2015.pdfOpen →other · source link
- VCS Issuance Representation, Single Representor, v3.5 AGE.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1 St Nikola 2016-20 19.05.2021.pdfOpen →other · source link
- AES_2nd_Monitoring_Report_ver 02.pdfDownload →monitoring · hosted copy · 314 KB
- AES_WPP_3rd_Monitoring_report_v.03_15062021.pdfDownload →monitoring · hosted copy · 450 KB
- MONIT_REP_1258_01NOV2012_to_31DEC2014.pdfDownload →monitoring · hosted copy · 706 KB
- VCS-Monitoring-Report-Template-v4.4-FINAL -30 Apr 2025-2__Clean.pdfDownload →monitoring · hosted copy · 1,083 KB
- 2. Saint Nikola Wind Farm VCS PD.pdfDownload →pdd · hosted copy · 931 KB
- 6.VCS Registration Representation, Single Representor, v3.2 executed 23..10.2014.pdfOpen →other · source link
- 1. CCL 220 VCS Final Validation Report.pdfDownload →verification · hosted copy · 1,426 KB
- 5. CCL220 VCS Validation Representation.pdfDownload →verification · hosted copy · 22 KB
- FVR_16BGMD01_rev. 03Aa_04112016.pdfDownload →verification · hosted copy · 817 KB
- FVR_20BGMD6_Saint Nikola Wind Park_2.0Aa_16062021.pdfDownload →verification · hosted copy · 430 KB
- VCS_1258_VR_Saint Nikola Wind Farm_Clean.pdfDownload →verification · hosted copy · 1,124 KB
- VERIF_REP_1258_01NOV2012_to_31DEC2014.pdfDownload →verification · hosted copy · 685 KB
- 1258- Verification-Representation-v4.2.pdfDownload →verification · hosted copy · 188 KB
- VCS Verification Representation, v3.3.pdfDownload →verification · hosted copy · 108 KB
- VCS-Verification-Representation-v4.1 St Nikola 19.05.2021 RINA_signed.pdfDownload →verification · hosted copy · 81 KB
- VERIF_STA_1258_01NOV2012_to_31DEC2014.pdfDownload →verification · hosted copy · 146 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia