Bundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA V1A)
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM Project Design Document (PDD) — Bundled Wind Power Project in Tamilnadu, India co-ordinated by TASMA (CDM-0991), accepted 06 Jun 2011, 445 KBDownload →pdd · hosted copy · 1 KB
- PDD Appendix 1 — 0991 Revised PDD tracked changes (447 KB)Download →pdd · hosted copy · 1 KB
- DNV Verification/Certification Report No. 2008-2062-I Rev.02 — Monitoring Period 01 Jan 2007–31 Dec 2007 (CDM-0991)Download →verification · hosted copy · 1 KB
- Monitoring Report v1.2 dated 18 Dec 2008 — Monitoring Period 01 Jan 2007–31 Dec 2007 (CDM-0991)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 01 Jan 2005–31 Dec 2005 (CDM-0991, 149 KB)Download →monitoring · hosted copy · 1 KB
- CDM UNFCCC Project Registry Page — CDM-0991 (TASMA), full issuance historyDownload →other · hosted copy · 1 KB
- ACM0002 ver. 6 — Consolidated methodology for grid-connected electricity generation from renewable sources (referenced methodology)Download →methodology · hosted copy · 1 KB
- TASMA-V1(A)_Issuance Representation_01072020.pdfOpen →other · source link
- TASMA-V1(A)_PPIR_26092014.pdfOpen →other · source link
- TASMA-V1(A)_MR_11062020.pdfDownload →monitoring · hosted copy · 501 KB
- VCS_Monitoring_Report_1352_10November2014_Final.pdfDownload →monitoring · hosted copy · 664 KB
- Final PD_TASMA-V1(A).pdfDownload →pdd · hosted copy · 1,726 KB
- TASMA-V1(A)_PPRR.pdfOpen →other · source link
- VCS FVR_TASMA V1A.pdfDownload →verification · hosted copy · 588 KB
- VCS Deed - TASMA V1A.pdfDownload →verification · hosted copy · 484 KB
- TASMA-V1(A)_Verification Report_27062020.pdfDownload →verification · hosted copy · 385 KB
- VCS_Verification_Report_1352_10November2014_Final.pdfDownload →verification · hosted copy · 416 KB
- TASMA-V1(A)_Verification Representation_29062020.pdfDownload →verification · hosted copy · 1,269 KB
- Verification deed_TASMA V1A_23 Sep 2014.pdfDownload →verification · hosted copy · 98 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia