Renewable Power Project by Axis Wind Farms (MPR Dam) Private Limited
Renewable Energy · Wind · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- VCS GUIDANCE 1 19 October 2016, v3.2 Validation and Verification ManualDownload →verification · hosted copy · 782 KB
- 1 VERRA REGISTRY USER GUIDEDownload →other · hosted copy · 1,367 KB
- Letter for transfer of VCS project_EKI Energy Private Limited.pdfOpen →other · source link
- Verra-SDG-Contributions-Report-1790-Greenko.pdfOpen →other · source link
- VCS Project Review Report -PL1790 Applus+ (002).pdfOpen →other · source link
- 19.54 Issuance Representation axis.pdfOpen →other · source link
- VCS-Issuance-Representation_Axis.doc.pdfOpen →other · source link
- VCS Issuance Representation MPR AXIS.pdfOpen →other · source link
- VCS Issuance Representation.pdfOpen →other · source link
- MR 1790 V02 06032020.pdfDownload →monitoring · hosted copy · 574 KB
- MR 1790 V0. 26062020 (1) (002).docxDownload →monitoring · hosted copy · 710 KB
- MR v4.2_100 MW Greenko Axis Wind_Clean.pdfDownload →monitoring · hosted copy · 652 KB
- VCS Joint PDMR_Axis Wind Farms_V03_28.09.2018.pdfDownload →monitoring · hosted copy · 469 KB
- VCS - MR Version 3.0.pdfDownload →monitoring · hosted copy · 370 KB
- VCS Joint PDMR_Axis Wind Farms_V03_28.09.2018.pdfDownload →pdd · hosted copy · 469 KB
- VCS-Registration-Representation_Axis.doc.pdfOpen →other · source link
- FVR-6518-Axis Wind-Val-Ver-08.10.2018 - TC.pdfDownload →verification · hosted copy · 417 KB
- 6518_VCS Validation Representation, v3.3.pdfDownload →verification · hosted copy · 366 KB
- FVR-6518-Axis Wind-Val-Ver-08.10.2018 - TC.pdfDownload →verification · hosted copy · 417 KB
- FVR_VCS 1790_ESPL 19.54_final (002).docxDownload →verification · hosted copy · 188 KB
- FVR_VCS 1790_ESPL 19.54_final.pdfDownload →verification · hosted copy · 424 KB
- FVR_VKU.VER.108.23_VCS_1790_Clean.pdfDownload →verification · hosted copy · 1,021 KB
- VCS-Verification-Report-MPR.pdfDownload →verification · hosted copy · 199 KB
- 6518_VCS Verification Representation, v3.3.pdfDownload →verification · hosted copy · 376 KB
- VCS-Deed-v4.0_19.54.pdfDownload →verification · hosted copy · 87 KB
- VCS-Verification-Representation-v4.1_VKU.VER.108.23_VCS_1790_signed.pdfDownload →verification · hosted copy · 1,124 KB
- VCS-Verification-Representation-v4.pdfDownload →verification · hosted copy · 29 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia