VTRM Renewable Energy
Renewable Energy · RE Bundled · Brazil
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- VTRM Renewable Energy 2 — Joint Project Description & Monitoring Report, VCS Version 3, v3.1 (Version 04, 24-July-2019; covers Ventos do Piauí Complex, VCS1903)Download →pdd · hosted copy · 886 KB
- VTRM Renewable Energy 2 — Validation/Verification Report (Earthood Services Private Limited, monitoring period 02-Aug-2017 to 28-Feb-2019, VCS1903)Download →verification · hosted copy · 659 KB
- VCS1812 VTRM Renewable Energy — Verra Registry Project Page (primary official project listing; documents hosted here but could not be directly fetched)Download →other · hosted copy · 3 KB
- COMMS_AGR_1812_10JAN2019.pdfOpen →other · source link
- ENERGY_and_ER_VTRM_v04.xlsxOpen →other · source link
- ER VA3_2023_V01.xlsxOpen →other · source link
- 1812_Partial-Release-Registration-Representation-v4.2-_1812_V02_(Auren_e_Way_assinatura)_executed.docx.pdfOpen →other · source link
- 1812_VCS_VCU spreadsheet_v3.0.xlsxOpen →other · source link
- 20220812_CONTRIBUTIONS REPORT_Report ID 1812_Ver2_ODS.pdfOpen →other · source link
- V2_1812_PRR_3AUG2021.pdfOpen →other · source link
- Issuance Representation_1812_2026-02-26.pdfOpen →other · source link
- Issuance-Representation-Single-PP-1812 (assinado).pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3_1812 (vf Auren assinado).pdfOpen →other · source link
- PP_DEED_1812_01AUG2018_30SEP2020.pdfOpen →other · source link
- PP_ISS_REP_1812_09DEC2016_31JUL2018.pdfOpen →other · source link
- PP_ISS_REP_1812_09DEC2016_31JUL2018.pdfOpen →other · source link
- VCS_ISSUANCE-Representation VTRM_1812.pdfOpen →other · source link
- PP_LIST_REP_PL1812_16OCT2018.pdfOpen →other · source link
- MONIT_REP_1812_01AUG2018_30SEP2020.pdfDownload →monitoring · hosted copy · 602 KB
- MONIT_REP_1812_09DEC2016_31JUL2018.pdfDownload →monitoring · hosted copy · 1,013 KB
- MONIT_REP_1812_09DEC2016_31JUL2018.pdfDownload →monitoring · hosted copy · 1,013 KB
- MR 1812_2022_V03__2_Clean.pdfDownload →monitoring · hosted copy · 1,087 KB
- MR 1812_V03_1_Clean.pdfDownload →monitoring · hosted copy · 1,058 KB
- VCS MR Project 1812 01012023-31122023_V3_Clean.pdfDownload →monitoring · hosted copy · 837 KB
- VCS MR Project 1812 01012024-31072024_V3_Clean.pdfDownload →monitoring · hosted copy · 950 KB
- PP_REG_REP_1812_10JAN2019.pdfOpen →other · source link
- VALID_REP_1812_30NOV2018.pdfDownload →verification · hosted copy · 539 KB
- VALID_STA_1812_30NOV2018.pdfDownload →verification · hosted copy · 2,039 KB
- 1812_VVR_v2.0.pdfDownload →verification · hosted copy · 589 KB
- FVR_2025BQCE2527_Rev 2.0Aa_11.02.2026_VTRM (1812).pdfDownload →verification · hosted copy · 719 KB
- FVR_DVRP_2024BQCE2092_2.0Aa_11.12.2024_VTRM (1812)_[34].pdfDownload →verification · hosted copy · 794 KB
- VCS_FVR_2022BQMD42_ID1812_2.0Aa_10.06.2022 .pdfDownload →verification · hosted copy · 479 KB
- VCS_FVR_2023BQ17MD_2.0AaAa_22.01.2024.pdfDownload →verification · hosted copy · 774 KB
- VCS_FVR_VA3_20BQMD50_(1812)_02Aa_12072021.pdfDownload →verification · hosted copy · 758 KB
- VERIF_REP_1812_09DEC2016_31JUL2018.pdfDownload →verification · hosted copy · 539 KB
- VERIF_REP_1812_09DEC2016_31JUL2018.pdfDownload →verification · hosted copy · 539 KB
- VCS-Verification-Representation-v4.1_1812_signed.pdfDownload →verification · hosted copy · 75 KB
- Verification Representation_1812_2026-02-26.pdfDownload →verification · hosted copy · 1,125 KB
- Verification-Representation-v4.2_Project ID1812.pdfDownload →verification · hosted copy · 229 KB
- Verification-Representation-v4.2_Project ID_1812 rev_signed.pdfDownload →verification · hosted copy · 179 KB
- VERIF_STA_1812_01AUG2018_30SEP2020.pdfDownload →verification · hosted copy · 95 KB
- VERIF_STA_1812_09DEC2016_31JUL2018.pdfDownload →verification · hosted copy · 2,074 KB
- VERIF_STA_1812_09DEC2016_31JUL2018.pdfDownload →verification · hosted copy · 2,074 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All RE Bundled →- BBBVCS Grouped Project for Renewable Power Generation by Essel Mining and Industries LimitedIndia
- BBBHybrid (Solar+Wind) Power project by SBE Renewables RajasthanIndia
- BBBRenewable Energy Power Projects by Atria PowerIndia
- BBBScatec RMI Hybrid ClusterSouth Africa
- BBBParque Eolico MaldonadoUruguay
- BBBGreen Energy Project at Gujarat by Powerica LimitedIndia