VTRM Renewable Energy 2
Renewable Energy · Wind · Brazil
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- VTRM Renewable Energy 2 – Joint Project Description & Monitoring Report (VCS v3.1), Version 04, 24-July-2019 (covers monitoring period 02/08/2017–28/02/2019)Download →pdd · hosted copy · 886 KB
- VTRM Renewable Energy 2 – Joint Validation & Verification Report (VCS v3.1), Version 01, Report ID VCS.VAL.19.122/123/124/125/126/127/128, 25-July-2019, by Earthood Services Private LimitedDownload →verification · hosted copy · 659 KB
- ACM0002 – Grid-connected electricity generation from renewable sources, Version 19.0 (CDM/UNFCCC)Download →methodology · hosted copy · 135 KB
- COMMS_AGR_PL1903_19JUN2019.pdfOpen →other · source link
- ENERGY_and_ER_VTRM_2_v03.xlsxOpen →other · source link
- ER VDPI_2023_V01.xlsxOpen →other · source link
- 1903_Partial-Release-Registration-Representation-v4.2-_1903_V02_(Auren_e_Way_assinatura)_executed.docx.pdfOpen →other · source link
- 1903_VCS_VCU spreadsheet_v2.0.xlsxOpen →other · source link
- 20220812_CONTRIBUTIONS REPORT_Project ID 1903_Ve2_ODS.pdfOpen →other · source link
- Issuance Representation_1903_2025-12-15.pdfOpen →other · source link
- V2_1903_PRR_6AUG2021.pdfOpen →other · source link
- DRAFT_PROJ_DESC_PL1903_18JUN2019.pdfDownload →pdd · hosted copy · 1,006 KB
- Issuance Representation.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3 (signed)_V02.pdfOpen →other · source link
- PP_DEED_1903_01MAR2019_30SEP2020.pdfOpen →other · source link
- PP_ISS_REP_1903_02AUG2017_28FEB2019.pdfOpen →other · source link
- VCS ISSUANCE DEED OF REPRESENTATION_1903 Final.pdfOpen →other · source link
- VCS-Issuance-Representation VTRM_1903.pdfOpen →other · source link
- PP_LIST_REP_PL1903_18JUN2019.pdfOpen →other · source link
- Joint-Project-Description-Monitoring-VdPI.pdfDownload →monitoring · hosted copy · 886 KB
- MONIT_REP_1903_01MAR2019_30SEP2020.pdfDownload →monitoring · hosted copy · 618 KB
- MR 1903_2022_V03_2_Clean.pdfDownload →monitoring · hosted copy · 1,134 KB
- MR 1903_V03_Clean.pdfDownload →monitoring · hosted copy · 884 KB
- VCS MR Project 1903_ 01012023-31122023_V2_Clean.pdfDownload →monitoring · hosted copy · 833 KB
- VCS MR Project 1903 01012024-31122024_V3_Clean.pdfDownload →monitoring · hosted copy · 956 KB
- Registration Representation.pdfOpen →other · source link
- Validation Representation.pdfDownload →verification · hosted copy · 119 KB
- FVRP_2024BQCE2091_1.1Aa_24.10.2024_VTRM 2 (1903).pdfDownload →verification · hosted copy · 913 KB
- FVRP_2025BQCE2528_1.1Aa_17.11.2025_VTRM 2 (1903).pdfDownload →verification · hosted copy · 770 KB
- Validation Verification Report_Ventos do Piaui.pdfDownload →verification · hosted copy · 659 KB
- VCS_FVR_2022BQMD41_2.0Aa_ID1903_06.10.2022.pdfDownload →verification · hosted copy · 472 KB
- VCS_FVR_2023BQ18MD_2.0Aa_22.01.2024.pdfDownload →verification · hosted copy · 680 KB
- VCS_FVR_VdP_20BQMD50_(1903)_02Aa_12072021.pdfDownload →verification · hosted copy · 711 KB
- VERIF_REP_1903_02AUG2017_28FEB2019.pdfDownload →verification · hosted copy · 659 KB
- VCS-Verification-Representation-v4.1_signed.pdfDownload →verification · hosted copy · 75 KB
- Verification Representation_1903_2025-11-18.pdfDownload →verification · hosted copy · 91 KB
- Verification Representation.pdfDownload →verification · hosted copy · 125 KB
- Verification-Representation-v4.2_Project ID_1903 rev_signed.pdfDownload →verification · hosted copy · 181 KB
- Verification-Representation-v4.2_Project ID_1903_signed.pdfDownload →verification · hosted copy · 180 KB
- VERIF_STA_1903_01MAR2019_30SEP2020.pdfDownload →verification · hosted copy · 94 KB
- VERIF_STA_1903_02AUG2017_28FEB2019.pdfDownload →verification · hosted copy · 125 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia