Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility
Renewable Energy · Wind · South Africa
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM Project Design Document – De Aar Grid Connected 100.5 MW Wind Farm, South Africa (Version 1.0, 22 August 2011)Download →pdd · hosted copy · 1,317 KB
- 20.03.2024_De Aar 1 Emission reduction.xlsxOpen →other · source link
- 20211214_De Aar 1_Verra-SDG-Contributions-Report_ver 03_IG (clean).pdfOpen →other · source link
- Declaration of Agency_DA1_signed.pdfOpen →other · source link
- V2_PRR_1949_3Aug2022.pdfOpen →other · source link
- VCS PD_De Aar 1_APX_cor_2.pdfDownload →pdd · hosted copy · 3,638 KB
- Issuance-Representation-Multiple-PPs-v4.2_De Aar 1.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-De Aar 1.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-De Aar 1.v4.1.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-v4.1.pdfOpen →other · source link
- Longyuan Mulilo De Aar Wind Power_Listing_Both.pdfOpen →other · source link
- 01.05.2024_De Aar 1 VCS-Monitoring-Report (version 02)_to VERRA.pdfDownload →monitoring · hosted copy · 1,194 KB
- 11.04.2023_De Aar 1 VCS-Monitoring-Report (version 02)_(clean)_IG.pdfDownload →monitoring · hosted copy · 1,714 KB
- 30032020_De Aar 1 VCS-Monitoring-Report (version 02) (final)_IG.pdfDownload →monitoring · hosted copy · 829 KB
- MON_REP_1949_03Aug2022.pdfDownload →monitoring · hosted copy · 1,744 KB
- PROJ_DESC_1949_26OCT2019.pdfDownload →pdd · hosted copy · 550 KB
- CCIPL 875 A FVR-clean.pdfDownload →verification · hosted copy · 743 KB
- EPL2023_009_DeAar1-VERIFICATION_APPROVED 08.05.2023_signed.pdfDownload →verification · hosted copy · 927 KB
- VCS_VeR_ID 1949-DeAar-1_01012023-31122023.pdfDownload →verification · hosted copy · 672 KB
- VERIF_REP_1949_03Aug2022.pdfDownload →verification · hosted copy · 399 KB
- De Aar 1 - VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 101 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 96 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 468 KB
- Verification-Representation.pdfDownload →verification · hosted copy · 129 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia