Longyuan Mulilo De Aar 2 North Wind Energy Facility
Renewable Energy · Wind · South Africa
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CDM Project Design Document – De Aar Grid Connected 100.5 MW Wind Farm, South Africa (v1.0, 22 August 2011)Download →pdd · hosted copy · 1,317 KB
- 15.04.2024_De Aar 2 Emission reduction.xlsxOpen →other · source link
- 20211214_De Aar 2_Verra-SDG-Contributions-Report_ver 3.0_IG (clean).pdfOpen →other · source link
- Declaration of Agency_DA2_signed.pdfOpen →other · source link
- V2_PRR_1950_3Aug2022.pdfOpen →other · source link
- VCS PD_De Aar 2_APX_cor_2.pdfDownload →pdd · hosted copy · 3,769 KB
- Issuance-Representation-Multiple-PPs-v4.2_De Aar 2.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-De Aar 2.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-De Aar 2.pdfOpen →other · source link
- VCS-Issuance-Representation-Multiple-Representors-De Aar 2.pdfOpen →other · source link
- Longyuan Mulilo De Aar 2 North_Listing_both.pdfOpen →other · source link
- 01.05.2024_De Aar 2 VCS 1950-Monitoring-Report (version 02)(clean)_to VERRA_IG.pdfDownload →monitoring · hosted copy · 1,747 KB
- 27.07.2021 De Aar 2 VCS-Monitoring-Report_ver 02.1 (clean).pdfDownload →monitoring · hosted copy · 1,806 KB
- De Aar 2 VCS 1950-Monitoring-Report_clean.pdfDownload →monitoring · hosted copy · 1,666 KB
- MON_REP_1950_03Aug2022.pdfDownload →monitoring · hosted copy · 1,715 KB
- PROJ_DESC_1950_26OCT2019.pdfDownload →pdd · hosted copy · 571 KB
- VALID_REP_1950_26OCT2019.pdfDownload →verification · hosted copy · 2,172 KB
- CCIPL 875 B FVR-clean.pdfDownload →verification · hosted copy · 742 KB
- FVR DeAar2-EPL2023VCS010_VCS1950_clean.pdfDownload →verification · hosted copy · 883 KB
- VCS_VeR_ID 1950-DeAar-2.pdfDownload →verification · hosted copy · 677 KB
- VER_REP_1950_03Aug2022.pdfDownload →verification · hosted copy · 399 KB
- VCS-Verification-Representation-v4.1 .pdfDownload →verification · hosted copy · 96 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 469 KB
- VCS-Verification-Representation_VCS 1950.pdfDownload →verification · hosted copy · 60 KB
- Verification-Representation.pdfDownload →verification · hosted copy · 129 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia