Tiefa Coal Industry Group CMM Utilization Project
Industrial & Commercial · Mine Methane Capture · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Tiefa Coal Industry Group CMM Utilization Project — Project Design Document (accepted 14 Jun 2012, ACM0008 v3 + ACM0002 v6)Download →pdd · hosted copy · 1 KB
- Tiefa Coal Industry Group CMM Utilization Project — Crediting Period Renewal PDD (approved 18 Jun 2018, ACM0008 v8)Download →pdd · hosted copy · 1 KB
- PDD Appendix 1 — CER Calculation Spreadsheet (Tiefa)Download →other · hosted copy · 1 KB
- Validation Report — DNV-CUK (original CDM registration, 2008)Download →verification · hosted copy · 1 KB
- Validation Opinion — Crediting Period Renewal (CP2, Nov 2015)Download →verification · hosted copy · 1 KB
- Monitoring Report — 06 Dec 2008 to 31 Dec 2010 (CP1, Period 1)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Jan 2011 to 30 Jun 2012 (CP1, Period 2)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Jul 2012 to 31 Dec 2012 (CP1, Period 3)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Jan 2013 to 31 Aug 2013 (CP1, Period 4)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Sep 2013 to 31 Jul 2014 (CP1, Period 5)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Aug 2014 to 31 Mar 2015 (CP1, Period 6)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Apr 2015 to 05 Dec 2015 (CP1, Period 7)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 06 Dec 2015 to 30 Sep 2016 (CP2, Period 1)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — 01 Oct 2016 to 31 Mar 2018 (CP2, Period 2)Download →monitoring · hosted copy · 1 KB
- Revised Monitoring Plan (approved 14 Jun 2012)Download →other · hosted copy · 1 KB
- ACM0008 — Abatement of methane from coal mines (Verra methodology page)Download →methodology · hosted copy · 132 KB
- CDM Project #1880 Registry Page — Full issuance and document historyDownload →other · hosted copy · 1 KB
- StatementOpen →other · source link
- Ver.pdfOpen →other · source link
- Ver Statement-1.pdfOpen →other · source link
- Ver Statement-1.pdfOpen →other · source link
- Transfer of ownership.pdfOpen →other · source link
- PPIR-1.pdfOpen →other · source link
- PPIR-1.pdfOpen →other · source link
- PPIR.pdfOpen →other · source link
- Tiefa PPIR.pdfOpen →other · source link
- Monitoer.pdfDownload →monitoring · hosted copy · 98 KB
- Monitor-1.pdfDownload →monitoring · hosted copy · 98 KB
- Monitor-1.pdfDownload →monitoring · hosted copy · 98 KB
- Tiefa MR.pdfDownload →monitoring · hosted copy · 98 KB
- Tiefa PDD.pdfDownload →pdd · hosted copy · 3,349 KB
- PPRR for Grandparenting.pdfOpen →other · source link
- Tiefa Validation Report.pdfDownload →verification · hosted copy · 560 KB
- Statement Vintages Tiefa Coal Industry Group CMM Utilization Project.pdfOpen →verification · source link
- Tiefa Verification Report.pdfDownload →verification · hosted copy · 491 KB
- VerDownload →verification · hosted copy · 491 KB
- Ver.pdfDownload →verification · hosted copy · 491 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Mine Methane Capture →- AAmerican Soda LLC Waste Mine Methane ProjectUnited States
- ASichuan Furong Coal Mine Methane Utilization ProjectChina
- AMarshall County VAM Abatement ProjectUnited States
- BBBCoal Mine Methane Capture and Use Project at the North Antelope Rochelle Coal Mine ComplexUnited States
- ABMMC1United States
- ACorinth Abandoned Mine Methane Recovery ProjectUnited States