Riau Ecosystem Restoration Carbon Project
Forestry & Land Use · REDD+ · Indonesia
CORSIA-approved programmeThis project has not issued credits yet. The rating anticipates type-level performance; it does not reflect realized issuance, retirements, or verified outcomes.
Dimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- RER VCS Project Description Document – Date of Issuance 11 August 2022Download →pdd · hosted copy · 3 KB
- RER VCS Validation Report – Date of Issuance 11 August 2022Download →verification · hosted copy · 3 KB
- RER VCS Monitoring Report – Period 06 August 2016 to 31 July 2020 – Date of Issuance 23 May 2023Download →monitoring · hosted copy · 3 KB
- RER VCS Verification Report – Date of Issuance 11 July 2023Download →verification · hosted copy · 3 KB
- RER CCB Project Document Summary (English) – Date of Issuance 10 June 2025Download →other · hosted copy · 3 KB
- How an Indonesian Pulp Giant Built a Carbon Project To Save a Forest From Itself (Pulitzer Center / The Diplomat, investigative report, 27 March 2026)Download →other · hosted copy · 180 KB
- 201211 Letter -PT GCN lead.pdfOpen →other · source link
- GCN Verra exemption req 020625 letter signed.pdfOpen →other · source link
- RER-CP_area.kmlOpen →other · source link
- R_2403_PRR.pdfOpen →other · source link
- V_2403_PRR 10AUG2023.pdfOpen →other · source link
- 2403_PUB_COM_SUM_CCB_V1_18AUG2025_17SEP2025.pdfOpen →other · source link
- 2403_PUB_COM_SUM_CCB_Val_24JUN2025_24JUL2025.pdfOpen →other · source link
- 210714 RER-CP VCS-Issuance-Representation-Updated Address - SIGNED.pdfOpen →other · source link
- 201211 RER CP VCS-Listing-Representation (executed).pdfOpen →other · source link
- VCS_MON_REP_2403_06AUG2016_31JUL2020.pdfDownload →monitoring · hosted copy · 7,235 KB
- VCS_PROJ_DESC_2403_11AUG2022.pdfDownload →pdd · hosted copy · 31,182 KB
- VCS Registration Deed of Representation_signed.pdfOpen →other · source link
- VCS_VALID_REP_2403_11AUG2022.pdfDownload →verification · hosted copy · 2,138 KB
- VCS_VER_REP_2403_06AUG2016_31JUL2020.pdfDownload →verification · hosted copy · 2,021 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to Pro