Chol Charoen Group Wastewater Treatment with Biogas System I (Cholburi)
Waste Management · Methane Recovery in Wastewater · Thailand
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- South Pole Group – Chol Charoen Wastewater Treatment Thailand Project Factsheet (2015), extracted from UPS Offset Program Details PDFDownload →other · hosted copy · 1,648 KB
- 300283_Communication agreement_contract_2 signed.pdfOpen →other · source link
- VCS430_ER_MP6CP2_v7.1_20250916.xlsxOpen →other · source link
- 2010-11-25 Verification_Statement_08-510.pdfOpen →other · source link
- VCS 025 Ver Statement 2011-04-13.pdfOpen →other · source link
- VCS_035_Verification_Representation,_v3.0.pdfOpen →other · source link
- VCS_deed_Cholburi.pdfOpen →other · source link
- I7_PRR_430_13NOV2018.pdfOpen →other · source link
- SEC7_PRR_430_28OCT2016.pdfOpen →other · source link
- V10_430_PRR_30NOV2021.pdfOpen →other · source link
- V11_430_PRR_30NOV2021.pdfOpen →other · source link
- VCS_V6_PRR_0430_15DEC2025.pdfOpen →other · source link
- 283_PPIR_3rd_ver.pdfOpen →other · source link
- 283_PP IR.pdfOpen →other · source link
- 283_PPIR_signed.pdfOpen →other · source link
- 300283Cholburi_WWT_Issuance deed_signed.pdfOpen →other · source link
- CC_PPIR_Part 1.pdfOpen →other · source link
- CC_PPIR_Part 2.pdfOpen →other · source link
- CC_PP issuance deed_7th_signed.pdfOpen →other · source link
- Chol Charoen_PPIR_fullyex.pdfOpen →other · source link
- PPIR_300283.pdfOpen →other · source link
- PP_ISS_REP_430_01JAN2007_31DEC2008.pdfOpen →other · source link
- PP_ISS_REP_430_01JAN2009_30SEP2010.pdfOpen →other · source link
- PP_ISS_REP_430_1JAN2012_31JUL2014.pdfOpen →other · source link
- PP_ISS_REP_430_1OCT2010_31DEC2011.pdfOpen →other · source link
- VCS430CC_MP4 Issuance Representation.pdfOpen →other · source link
- VCS430CC_MP5 Issuance Representation.pdfOpen →other · source link
- VCS430CC_VCS-Issuance-Representation-v4.1.pdfOpen →other · source link
- VCS430_CP2MP6_Issuance-Representation.pdfOpen →other · source link
- 2010-11-18 283_CholCharoen_monitoring_report.pdfDownload →monitoring · hosted copy · 711 KB
- 283_4TH-.PDFDownload →monitoring · hosted copy · 1,336 KB
- 283_Chol Charoen_7th MR_ver02_270418 final.pdfDownload →monitoring · hosted copy · 939 KB
- 283_MR final_110421.pdfDownload →monitoring · hosted copy · 1,286 KB
- 300283Cholburi_WWT_MR_ver03_19072019.pdfDownload →monitoring · hosted copy · 1,712 KB
- CC_MR_final_part 1.pdfDownload →monitoring · hosted copy · 1,458 KB
- CC_MR_final_part 2.pdfDownload →monitoring · hosted copy · 1,472 KB
- MONIT_REP_283_01JAN2017_TO_31DEC2017.pdfDownload →monitoring · hosted copy · 2,159 KB
- MONIT_REP_430_01JAN2007_31DEC2008.pdfDownload →monitoring · hosted copy · 711 KB
- MONIT_REP_430_01JAN2009_30SEP2010.pdfDownload →monitoring · hosted copy · 1,286 KB
- MONIT_REP_430_1JAN2012_31JUL2014.PDFDownload →monitoring · hosted copy · 1,336 KB
- MONIT_REP_430_1OCT2010_31DEC2011.pdfDownload →monitoring · hosted copy · 3,588 KB
- MR_3rd_ver_rev04_clean.pdfDownload →monitoring · hosted copy · 3,588 KB
- VCS430Cholburi_4thMR_01012020to02032020nonPAF v03.1_15102021.pdfDownload →monitoring · hosted copy · 2,158 KB
- VCS430Cholburi_5thMR_03032020to30042021PAF v03.1_15102021.pdfDownload →monitoring · hosted copy · 2,214 KB
- VCS430Cholburi_MR_01042019to31122019_v2_08072020.pdfDownload →monitoring · hosted copy · 1,705 KB
- VCS430Cholburi_WWT_6thMR_MP6CP2_v08.2.pdfDownload →monitoring · hosted copy · 1,357 KB
- 283_Chol Charoen_VCS PD_rev03_210518_final.pdfDownload →pdd · hosted copy · 1,508 KB
- PROJ_DESC_430_16SEP2009.pdfDownload →pdd · hosted copy · 1,043 KB
- PP_REG_REP_430_13JUL2009.pdfOpen →other · source link
- RCP Validation Report - 28.05.2018.pdfDownload →verification · hosted copy · 1,382 KB
- VALID_REP_430_14NOV2009.pdfDownload →verification · hosted copy · 466 KB
- VALID_STA_430_18NOV2009.pdfDownload →verification · hosted copy · 595 KB
- VCS Validation Representation, v3.3.pdfDownload →verification · hosted copy · 130 KB
- 2010-11-18_FVerR_LCD_08-510.pdfDownload →verification · hosted copy · 699 KB
- CC_FVR_Part 1_revised.pdfDownload →verification · hosted copy · 857 KB
- CC_FVR_Part 2_revised.pdfDownload →verification · hosted copy · 871 KB
- FVR_Cholburi.pdfDownload →verification · hosted copy · 718 KB
- FVRP_19IQ19MD_v1.0Aa_23.08.2019_approved.pdfDownload →verification · hosted copy · 894 KB
- VCS 025 Final Verification Report 13042011.pdfDownload →verification · hosted copy · 323 KB
- VCS_035_Verification_Report_Rev_06_final.pdfDownload →verification · hosted copy · 385 KB
- VCS430- Cholburi-MP4 Verification-Report- 181021.pdfDownload →verification · hosted copy · 2,947 KB
- VCS430 FVR - Clean.pdfDownload →verification · hosted copy · 3,383 KB
- VCS- Cholburi-MP5-Verification-Report- 181021.pdfDownload →verification · hosted copy · 1,345 KB
- VCS-Verification-Report-cholburi_v2.pdfDownload →verification · hosted copy · 236 KB
- Verification Report-Chol Charoen_01-January-2017 to 31-December-2017.pdfDownload →verification · hosted copy · 1,008 KB
- Verification Report-Chol Charoen_01-June-2016 to 31-December-2016.pdfDownload →verification · hosted copy · 888 KB
- VERIF_REP_430_01JAN2007_31DEC2008.pdfDownload →verification · hosted copy · 699 KB
- VERIF_REP_430_01JAN2009_30SEP2010.pdfDownload →verification · hosted copy · 323 KB
- VERIF_REP_430_1JAN2012_31JUL2014 (1).pdfDownload →verification · hosted copy · 724 KB
- VERIF_REP_430_1JAN2012_31JUL2014.pdfDownload →verification · hosted copy · 724 KB
- VERIF_REP_430_1OCT2010_31DEC2011.pdfDownload →verification · hosted copy · 385 KB
- VCS430_CP2MP6_Verification-Representation.pdfDownload →verification · hosted copy · 139 KB
- VCS-Verification-Representation_19IQ19MD_signed.pdfDownload →verification · hosted copy · 108 KB
- VCS Verification Representation-Chol Charoen_01-January-2017 to 31-December-2017.pdfDownload →verification · hosted copy · 131 KB
- VCS Verification Representation-Chol Charoen_01-June-2016 to 31-December-2016.pdfDownload →verification · hosted copy · 127 KB
- VCS-Verification-Representation-v4.1_Cholburi_MP4.pdfDownload →verification · hosted copy · 210 KB
- VCS-Verification-Representation-v4.1_Cholburi_MP5.pdfDownload →verification · hosted copy · 210 KB
- VCS-Verification-Representation-v4.pdfDownload →verification · hosted copy · 94 KB
- VERIF_STA_430_01JAN2007_31DEC2008.pdfDownload →verification · hosted copy · 591 KB
- VERIF_STA_430_01JAN2009_30SEP2010.pdfDownload →verification · hosted copy · 16 KB
- VERIF_STA_430_1JAN2012_31JUL2014.pdfDownload →verification · hosted copy · 102 KB
- VERIF_STA_430_1OCT2010_31DEC2011.pdfDownload →verification · hosted copy · 39 KB
- VVB Deed_Part 1.pdfDownload →verification · hosted copy · 179 KB
- VVB deed_part 2.pdfDownload →verification · hosted copy · 184 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Methane Recovery in Wastewater →- ALinshu Biogas Recovery and Power Generation ProjectChina
- BBBMethane Capture, Flare and Utilization at Tyson Wastewater Treatment Facilities - AmarilloUnited States
- BBBWastewater Treatment with Biogas Production (UASB) and Heat Utilization at General Starch Co Ltd.Thailand
- BBBMethane Capture, Flare and Utilization at Tyson Wastewater Treatment Facilities - LexingtonUnited States
- AMethane Gas Capture and Electricity Production at Kubratovo Wastewater Treatment Plant Sofia BulgariaBulgaria
- BBBSD Biosupply Wastewater Treatment and Biogas Utilization ProjectThailand