Varanasi Smart City Bio-Conversion Project
Agriculture · Manure Methane Digester · India
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- VCS GUIDANCE 1 19 October 2016, v3.2 Validation and Verification ManualDownload →verification · hosted copy · 782 KB
- F VCS Standard (Previous Version) VCS Version 3 Requirements DocumentDownload →other · hosted copy · 868 KB
- VCS4493-Gobadhan ER Sheet (Ver 3).xlsxOpen →other · source link
- VCS_R1_PRR_Project4493.pdfOpen →other · source link
- VCS_PROJ_DESC_4493_13JUN2023.pdfDownload →pdd · hosted copy · 870 KB
- VCS Issuance Deed of Representation-GVF (1).pdfOpen →other · source link
- VSCL-Gobardhan Listing Representation.pdfOpen →other · source link
- VCS4493-Gobadhan PDMR (Ver 5)_clean.pdfDownload →monitoring · hosted copy · 1,532 KB
- VCS4493-Gobadhan PDMR (Ver 5)_clean.pdfDownload →pdd · hosted copy · 1,532 KB
- VCS_PROJ_DESC_PCP_4493_13JUN2023.pdfDownload →pdd · hosted copy · 1,157 KB
- VCS4493-Registration-Representation-Single-PP.pdfOpen →other · source link
- Joint Validation and verification report_VCS4493_CC.pdfDownload →verification · hosted copy · 1,740 KB
- VVB Validation-Representation-v4.2-4493.pdfDownload →verification · hosted copy · 135 KB
- Joint Validation and verification report_VCS4493_CC.pdfDownload →verification · hosted copy · 1,740 KB
- VVB Verification-Representation-v4.2_4493.pdfDownload →verification · hosted copy · 144 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Manure Methane Digester →- BBBShuangbaotai Animal Manure Management System GHG Mitigation Project in Jiangxi ProvinceChina
- BBBHeilongjiang Swine Farm Animal Waste Management System GHG Mitigation ProjectChina
- BBBAonong AWMS GHG Mitigation Project in Jiangxi ProvinceChina
- BBBMuyuan Nanyang Swine Farm Animal Waste Management System GHG Mitigation ProjectChina
- BBBGanzhou Swine Farm Animal Manure Management System GHG Mitigation ProjectChina
- BBBDongrui Animal Manure Management System GHG Mitigation Project in Heyuan CityChina