Capricorn Ridge 4 Wind Farm
Renewable Energy · Wind · United States
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Verification Report for the Capricorn Ridge 4 Wind Farm (First Environment, Inc., 14-December-2022, covering Jan 2020–Dec 2021)Download →verification · hosted copy · 252 KB
- Capricorn Ridge 4 Wind Farm Project — Monitoring Report v05 (NextEra Energy Resources / Carlyle Bruno, 12-December-2022, monitoring period Jan 2020–Dec 2021)Download →monitoring · hosted copy · 479 KB
- Cap 4 APX Extension Letter Feb 27 2017 (signed).pdfOpen →other · source link
- Declaration of Agency and Communications Agreement_Final.pdfOpen →other · source link
- CapRidge4 2014 REC retire_11919 MWh.pdfOpen →other · source link
- CapRidge4 2014 REC retire_13077 MWh.pdfOpen →other · source link
- CapRidge4 2014 REC retire_13945 MWh (2).pdfOpen →other · source link
- CapRidge 4 2014 REC retire_155539.pdfOpen →other · source link
- CapRidge4 2014 REC retire_20107 MWh.pdfOpen →other · source link
- CapRidge4 2014 REC retire_22921 MWh.pdfOpen →other · source link
- CapRidge4 2014 REC retire_6822 MWh.pdfOpen →other · source link
- CapRidge REC retirement_2016 vintage_ 232279MWh.pdfOpen →other · source link
- NativeEnergy 3rd Extension Ltr Agrmnt (6.17.16) (signed).pdfOpen →other · source link
- Native Energy, Inc. Second Extension of Transfer of Project (12.31.15).pdfOpen →other · source link
- NextEra Declaration to Verra Final 2.8.2022.pdfOpen →other · source link
- OTHER_468_08AUG2016_Ercot_ retirement.pdfOpen →other · source link
- PR, Project ID 468, 09 February 2022.pdfOpen →other · source link
- VERIF_STA_468_01JAN2010_30JUN2010.pdfOpen →other · source link
- I4_PRR_468_5_Sep_2017.pdfOpen →other · source link
- Cap Ridge 4 Issuance Deed 2014.pdfOpen →other · source link
- Issuance Deed of Representation 12_2010.pdfOpen →other · source link
- Open →
- Issuance Deed of Representation_NextEra(5.1.18).pdfOpen →other · source link
- NEM Issuance Deed of Representation (9.17.19).pdfOpen →other · source link
- PP_ISS_REP_468_01JAN2010_30JUN2010.pdfOpen →other · source link
- PP Issuance Dead of Representation.pdfOpen →other · source link
- VCS Issuance Deed of Representation by NEER - MSR signed.pdfOpen →other · source link
- VCS Issuance Representation, Single Representor, v3.5 signed.pdfOpen →other · source link
- Cap 4 Monitoring Q1-Q2 2010.pdfDownload →monitoring · hosted copy · 16 KB
- Cap 4 Monitoring Q3 2010.pdfDownload →monitoring · hosted copy · 58 KB
- MONIT_REP_468_01JAN2010_30JUN2010.pdfDownload →monitoring · hosted copy · 16 KB
- VCS468 Monitoring Report CapRidge4 v01.pdfDownload →monitoring · hosted copy · 554 KB
- VCS468 Monitoring Report CapRidge4 v01.pdfDownload →monitoring · hosted copy · 556 KB
- VCS-Monitoring-Report CapRidge4 2020_2021 01.06.2022.pdfDownload →monitoring · hosted copy · 479 KB
- VCS Monitoring Report v3.3_0 CapRidge4 v01.5 (2015_05_15).pdfDownload →monitoring · hosted copy · 653 KB
- VCS Monitoring Report v3.4_0 CapRidge4 v02.pdfDownload →monitoring · hosted copy · 443 KB
- VCS Monitoring Report v3.4_0 CapRidge4 v05.pdfDownload →monitoring · hosted copy · 769 KB
- Cap Ridge 4 PDD 05-19-10 PUBLIC - REDACTED.pdfOpen →pdd · source link
- VCS-Project-Description- Capricorn Ridge IV 2020 Final.pdfDownload →pdd · hosted copy · 1,270 KB
- Project Proponent Registration Representation.pdfOpen →other · source link
- VCS468 Registration Representation (11-16-21) .pdfOpen →other · source link
- VCS468 Registration Representation.pdfOpen →other · source link
- Final Validation Report.pdfDownload →verification · hosted copy · 152 KB
- VCS468 Validation Report.pdfDownload →verification · hosted copy · 385 KB
- Validation Statement_NextEra_Capricorn Ridge 4.pdfDownload →verification · hosted copy · 68 KB
- VCS 468-Validation-Representation-v4.1.pdfDownload →verification · hosted copy · 183 KB
- Capricorn Ridge 4 Wind Farm Verification Report - Final.pdfDownload →verification · hosted copy · 233 KB
- Capricorn Ridge 4 Wind Farm Verification Report - Final.pdfDownload →verification · hosted copy · 269 KB
- Capricorn Ridge 4 Wind Farm Verification Report_Final.pdfDownload →verification · hosted copy · 238 KB
- Capricorn Ridge 4 Wind Farm Verification Report Final rev1.pdfDownload →verification · hosted copy · 154 KB
- Capricorn Ridge 4 Wind Farm Verification Report.pdfDownload →verification · hosted copy · 199 KB
- Cap Ridge 4 Final Verification Report.pdfDownload →verification · hosted copy · 332 KB
- Final Verification Report (2).pdfDownload →verification · hosted copy · 133 KB
- VCS468 Final Verification Report.pdfDownload →verification · hosted copy · 348 KB
- VERIF_REP_468_01JAN2010_30JUN2010.pdfDownload →verification · hosted copy · 332 KB
- Capricorn Ridge 4 Wind Farm Verification Representation 1JAN2014-31DEC20....pdfDownload →verification · hosted copy · 36 KB
- Capricorn Ridge IV Wind Farm Project Verification Representation.pdfDownload →verification · hosted copy · 85 KB
- Issuance Deed of Representation by NextEra Energy Marketing, LLC (2.1.18).pdfDownload →verification · hosted copy · 2,570 KB
- VCS468_Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 156 KB
- VCS Deed of Representation-2010-10-19.pdfDownload →verification · hosted copy · 34 KB
- VCS Deed of Representation_Cap Ridge 4_Q3 2010.pdfDownload →verification · hosted copy · 34 KB
- VCS Verification Representation - Capricorn Ridge IV Wind Farm Project.pdfDownload →verification · hosted copy · 66 KB
- VCS Verification Representation - Capricorn Ridge.pdfDownload →verification · hosted copy · 35 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia