210 MW Musi Hydro Power Plant, Bengkulu
Renewable Energy · Hydropower · Indonesia
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- 2nd Validation of Social Carbon Report – 210 MW Musi Hydropower Plant, Bengkulu (PT Mutuagung Lestari / Mutucertification International, July 15, 2013)Download →verification · hosted copy · 489 KB
- COMMS_AGR_487_23JUL2010.pdfOpen →other · source link
- 130709_Musi_Social_Carbon_MR_Year_1_FIN.pdfOpen →other · source link
- 300358-1.pdfOpen →other · source link
- 300358-3.pdfOpen →other · source link
- 300358-4.pdfOpen →other · source link
- Final_Validation_Report__Musi_SC_Year_1_.pdfOpen →other · source link
- FVR_09IQ133ME_1.1_08092011.pdfOpen →other · source link
- FVR_10.06.2013.pdfOpen →other · source link
- Musi Verification Statement_08092011.pdfOpen →other · source link
- PP_ISS_REP_487_01APR2009_31MAR2010.pdfOpen →other · source link
- SC_REP_POINT_ONE_487_12JUN2013.pdfOpen →other · source link
- SC_REP_POINT_ZERO_487_01APR2009_31MAR2010.pdfOpen →other · source link
- SC_REP_POINT_ZERO_487_01APR2009_31MAR2010.pdfOpen →other · source link
- SC_VALID_REP_487_JUN2013.pdfOpen →other · source link
- SC_VAL_REP_487_01APR2009_31MAR2010.pdfOpen →other · source link
- SC_VAL_REP_487_01APR2009_31MAR2010.pdfOpen →other · source link
- Signed_VCS_Verification_Representation.pdfOpen →other · source link
- VERIF_REP_487_01APR2009_31MAR2010.pdfOpen →other · source link
- VERIF_STA_487_01APR2009_31MAR2010.pdfOpen →other · source link
- V6_487_PRR_28NOV22.pdfOpen →other · source link
- 120922_Musi_VCS Issuance Deed (SIGNED).pdf.pdfOpen →other · source link
- 190329_1st verification (2nd CP)_VCS Issuance Representation_v3.5_Musi.pdfOpen →other · source link
- 190329_3rd verification (1st CP)_VCS Issuance Representation_v3.5_Musi.pdfOpen →other · source link
- 190329_3rd verification (1st CP)_VCS Issuance Representation_v3.5_Musi.pdfOpen →other · source link
- Musi_PPIR_1stVerfication.pdfOpen →other · source link
- Musi_PPIR_(2nd_verification).pdfOpen →other · source link
- PP_ISS_REP_487_01APR2009_31MAR2010.pdfOpen →other · source link
- PP_ISS_REP_487_01APR2010_31MAR2013.pdfOpen →other · source link
- 180130_Musi_1st CP_3rd ver_Monitoring Report_v2.0_lsa.pdfDownload →monitoring · hosted copy · 12,126 KB
- 180130_Musi_1st CP_3rd ver_Monitoring Report_v2.0_lsa.pdfDownload →monitoring · hosted copy · 12,126 KB
- 180322_Musi_2nd CP_1st ver_Monitoring Report_v2.0_lsa.pdfDownload →monitoring · hosted copy · 12,052 KB
- 20220929_Musi_Monitoring Report_MP2_01102017to31122020_v04.2_CLEAN.pdfDownload →monitoring · hosted copy · 1,318 KB
- MONIT_REP_487_01APR2009_31MAR2010.pdfDownload →monitoring · hosted copy · 859 KB
- MONIT_REP_487_01APR2009_31MAR2010.pdfDownload →monitoring · hosted copy · 859 KB
- MONIT_REP_487_01APR2010_31MAR2013.pdfDownload →monitoring · hosted copy · 5,052 KB
- Musi_MR_FINAL.pdfDownload →monitoring · hosted copy · 5,052 KB
- Musi VCS Hydro MR_vintage breakdown (FINAL).pdfDownload →monitoring · hosted copy · 859 KB
- 180228_Musi_VCS PD v3.0_lsa.pdfDownload →pdd · hosted copy · 1,682 KB
- PROJ_DESC_487_09NOV2009.pdfDownload →pdd · hosted copy · 1,271 KB
- PP_REG_REP_487_9JUL2010.pdfOpen →other · source link
- 300358-2.pdfDownload →verification · hosted copy · 513 KB
- FVR_2017IQ53MD_v1.0Aa_05.03.2018.pdfDownload →verification · hosted copy · 1,862 KB
- VALID_REP_487_16NOV2009.pdfDownload →verification · hosted copy · 605 KB
- VALID_STA_487_16NOV2009.pdfDownload →verification · hosted copy · 21 KB
- VCS Validation Representation, v3.3_signed.pdfDownload →verification · hosted copy · 106 KB
- 21-073 Musi HPP VCS ID 487 CPII MP2 FV1 2022-10-07.pdfDownload →verification · hosted copy · 993 KB
- FVR_17IQ51MD_v1.0Aa_08.02.2018.pdfDownload →verification · hosted copy · 579 KB
- FVR_17IQ51MD_v1.0Aa_08.02.2018.pdfDownload →verification · hosted copy · 579 KB
- FVR_17IQ52MD_v1.0Aa_16.04.2018.pdfDownload →verification · hosted copy · 465 KB
- VERIF_REP_487_01APR2009_31MAR2010.pdfDownload →verification · hosted copy · 380 KB
- VERIF_REP_487_01APR2010_31MAR2013.pdfDownload →verification · hosted copy · 542 KB
- VCS Verification Representation, v3.3 (1)_signed.pdfDownload →verification · hosted copy · 108 KB
- VCS Verification Representation, v3.3 (1)_signed.pdfDownload →verification · hosted copy · 108 KB
- VCS Verification Representation, v3.3A.pdfDownload →verification · hosted copy · 102 KB
- VCS-Verification-Representation-v4.1 (Musi).pdfDownload →verification · hosted copy · 563 KB
- VERIF_STA_487_01APR2009_31MAR2010.pdfDownload →verification · hosted copy · 43 KB
- VERIF_STA_487_01APR2010_31MAR2013.pdfDownload →verification · hosted copy · 762 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Hydropower →- BBBHydroelectric Project in Kinnaur District in Himachal PradeshIndia
- BBB300MW Hydropower project by JHPLIndia
- BBBFoz do Chapecó ProjectBrazil
- BBBVishnuprayag Hydro-electric Project (VHEP) by Jaiprakash Power Ventures Ltd.(JPVL)India
- BBBTeesta- V Hydro Power project in SikkimIndia
- BBBGrouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. ChinaChina