Inner Mongolia Wuliji Wind Farm Project
Renewable Energy · Wind · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Inner Mongolia Wuliji Wind Farm Project — PDD (approved version, post-PRC, 20 Sep 2013, 805 KB)Download →pdd · hosted copy · 1 KB
- Inner Mongolia Wuliji Wind Farm Project — PDD (original pre-correction version, 630 KB)Download →pdd · hosted copy · 1 KB
- Inner Mongolia Wuliji Wind Farm Project — PDD (pre-PRC version, 608 KB)Download →pdd · hosted copy · 1 KB
- Validation Report — Bureau Veritas India Pvt. Ltd. (520 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report — Period 1: 15 Mar 2010 – 31 Mar 2011 (122 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 2: 01 Apr 2011 – 31 Jan 2012 (220 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 3: 01 Feb 2012 – 20 Jan 2013 (236 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 4: 21 Jan 2013 – 14 Mar 2017 (319 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project 2483 Main Registry Page — Inner Mongolia Wuliji Wind Farm ProjectDownload →other · hosted copy · 1 KB
- CDM Project 2483 History Page (review requests, original PDD, appendices)Download →other · hosted copy · 1 KB
- PROJ_DESC_543_28SEP2010.pdfOpen →other · source link
- V2_543_PRR_24October2022.pdfOpen →other · source link
- VALID_STA_543_30NOV2010.pdfDownload →verification · hosted copy · 38 KB
- 03 VCS543-Issuance-Representation-Single-Representor-v4 1.pdfOpen →other · source link
- VCS543-Issuance-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- VCS-PP-Issuance-Representation-Inner Mongolia Wuliji Wind Farm Project.pdfOpen →other · source link
- 01 VCS543-Monitoring-Report-InnerMongolia Wuliji Wind Farm Project.pdfDownload →monitoring · hosted copy · 1,556 KB
- Monitoring__ Report_Wuliji_(20090913-20100314).pdfDownload →monitoring · hosted copy · 214 KB
- MONIT_REP_543_13SEP2009_14MAR2010.pdfDownload →monitoring · hosted copy · 214 KB
- VCS-543 MR-20220929-clean.pdfDownload →monitoring · hosted copy · 1,001 KB
- PD-Inner Mongolia Wuliji Wind Farm Project.pdfDownload →pdd · hosted copy · 786 KB
- VCS543-Project Description-Inner Mongolia Wuliji Wind Farm Project.pdfDownload →pdd · hosted copy · 660 KB
- 2.VCS543-Registration-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- PP_REG_REP_543_03DEC2010.pdfOpen →other · source link
- Open →
- CDM Validation Report.pdfDownload →verification · hosted copy · 520 KB
- VALID_REP_543_26MAR2009.pdfDownload →verification · hosted copy · 520 KB
- VALID_REP_543_30NOV2010.pdfDownload →verification · hosted copy · 107 KB
- VCS543-Validation-Report-Inner Mongolia Wuliji Wind Farm Project.pdfDownload →verification · hosted copy · 353 KB
- 4.VCS543-Validation-Representation-v4.1-543.pdfDownload →verification · hosted copy · 104 KB
- Validation DEED-Wuliji.pdfDownload →verification · hosted copy · 38 KB
- VALID STA.pdfDownload →verification · hosted copy · 107 KB
- 02 VCS-Verification-Report-InnerMongolia Wuliji Wind Farm Project_CTI.pdfDownload →verification · hosted copy · 295 KB
- VCS-Verification-Report-543-0930-clean.pdfDownload →verification · hosted copy · 437 KB
- VERIF REF.pdfDownload →verification · hosted copy · 212 KB
- 0104020322002(001)B VCS-Verification-Representation-v4.1-VCS543-signed.pdfDownload →verification · hosted copy · 109 KB
- 04 VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 105 KB
- CETIF STA_2009.pdfDownload →verification · hosted copy · 49 KB
- CETIF STA_2010.pdfDownload →verification · hosted copy · 49 KB
- Verification DEED !_Wuliji.pdfDownload →verification · hosted copy · 39 KB
- VERIF_REP_543_13SEP2009_14MAR2010.pdfDownload →verification · hosted copy · 212 KB
- VERIF_STA_543_13SEP2009_14MAR2010.pdfDownload →verification · hosted copy · 39 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia