Corinth Abandoned Mine Methane Recovery Project
Industrial & Commercial · Mine Methane Capture · United States
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Corinth Abandoned Mine Methane Recovery Project – Monitoring Report v1.2 (Ruby Canyon Engineering, 04 April 2013; Monitoring Period 01 May 2011 – 31 December 2012)Open →monitoring · source link
- ARB Early Action Offset Program Listing Application CAMM0118 – Corinth Abandoned Mine Methane Recovery Project (California Air Resources Board)Download →other · hosted copy
- ACM0008 v6 + VMR0002 v1.0: VCS Methodology Revision to include methane capture and destruction from abandoned coal mines (referenced in monitoring report and ARB listing)Open →methodology · source link
- Verra.org – VCS Projects and California's Early Action Offset Program (July 2016, updated December 2023) — includes site visit description and ARBOC conversion data for VCS573Download →other · hosted copy · 187 KB
- California ARB – ARB Offset Credit Issuance Table (Oregon Legislature archive, confirming VCS 573 issuance)Download →other · hosted copy · 381 KB
- ARB Industry Comment Letter re: Mine Methane Protocol (October 22, 2013) — contains context on Corinth/Keyrock project history and baseline methodologyDownload →other · hosted copy
- VCS Deed of Accession Executed.pdfOpen →other · source link
- Issuance Deed of Representation - 2013-04-11.pdfOpen →other · source link
- Registration Deed of Issuance.pdfOpen →other · source link
- DTE Monitoring Report 2010 - 2011_060811.pdfDownload →monitoring · hosted copy · 310 KB
- MONIT_REP_573_01JAN2013_to_31DEC2014.pdfDownload →monitoring · hosted copy · 198 KB
- Verification_Report_KeyrockEnergy_VCS_573_2013-04-10.pdfDownload →verification · hosted copy · 92 KB
- VERIF_REP_573_01JAN2013_to_31DEC2014.pdfDownload →verification · hosted copy · 109 KB
- Deed_of_Representation_VCS_573_2013-04-09.pdfDownload →verification · hosted copy · 57 KB
- VCS Verification Statement_2011-06-17.pdfDownload →verification · hosted copy · 58 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Mine Methane Capture →- AAmerican Soda LLC Waste Mine Methane ProjectUnited States
- ASichuan Furong Coal Mine Methane Utilization ProjectChina
- AMarshall County VAM Abatement ProjectUnited States
- BBBCoal Mine Methane Capture and Use Project at the North Antelope Rochelle Coal Mine ComplexUnited States
- ABMMC1United States
- ACorinth Abandoned Mine Methane Recovery ProjectUnited States