Guangdong Huizhou LNG Power Generation Project
Industrial & Commercial · Natural Gas Electricity Generation · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- Guangdong Huizhou LNG Power Generation Project – Project Design Document (CDM #1884, 497 KB)Download →pdd · hosted copy · 1 KB
- Validation Report – SGS-UKL (CDM #1884, 409 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report: 22 Apr 2009 – 31 Aug 2009 (CDM #1884, 298 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report: 01 Sep 2009 – 31 Dec 2009 (CDM #1884, 154 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report: 01 Jan 2010 – 31 Oct 2010 (CDM #1884, 463 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project #1884 Registry Page (with all document links and issuance history)Download →other · hosted copy · 1 KB
- CDM Public Validation Availability Record – China Guangdong Huizhou LNG Generation ProjectDownload →other · hosted copy · 1 KB
- issuance deed of representation_updated 20120608.pdfOpen →other · source link
- 1st monitoring report_verson 2_20081106.pdfDownload →monitoring · hosted copy · 243 KB
- 2nd monitoring report_huizhou.pdfDownload →monitoring · hosted copy · 353 KB
- VCS_PD_huizhou.pdfDownload →pdd · hosted copy · 652 KB
- registration deed of representation.pdfOpen →other · source link
- CDM first Validation Report.pdfDownload →verification · hosted copy · 351 KB
- Revised Validation Report - Clean.pdfDownload →verification · hosted copy · 409 KB
- Validation Statementpage 5.pdfDownload →verification · hosted copy · 411 KB
- Huizhou_VCS validation deed_2012-02-16.pdfDownload →verification · hosted copy · 87 KB
- updated 2008-1722_VER_Verification Report of Huizhou_final.pdfDownload →verification · hosted copy · 678 KB
- Huizhou_VCS verification deed_2012-02-16.pdfDownload →verification · hosted copy · 95 KB
- Huizhou_VCS verification deed_2012-02-17.pdfDownload →verification · hosted copy · 96 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Natural Gas Electricity Generation →- BBBZhangjiagang Nature Gas Power Generation ProjectChina
- BBBNatural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power LimitedIndia
- BBBNanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant ProjectChina
- BBBChina Guangdong Shenzhen Qianwan LNG generation projectChina
- BBBGrid connected electricity generation plant using natural gas at Jurong Island in SingaporeSingapore
- BBBNatural Gas Based Combined Cycle Power Generation, at Kothapeta, East Godavari, Andhra Pradesh, IndiaIndia