CECIC Gansu Yumen Changma No.3 Wind Farm Project
Renewable Energy · Wind · China
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- CECIC Gansu Yumen Changma No.3 Wind Farm Project — Project Design Document (CDM, approved version, 789 KB, approved 23 Oct 2012)Download →pdd · hosted copy · 1 KB
- CECIC Gansu Yumen Changma No.3 Wind Farm Project — Original PDD submitted for validation (579 KB)Download →pdd · hosted copy · 1 KB
- Validation Report — TÜV Rheinland (706 KB)Download →verification · hosted copy · 1 KB
- Monitoring Report — Period 1: 28 Apr 2011–29 Oct 2011 (263 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 2: 30 Oct 2011–28 Apr 2012 (412 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 3: 29 Apr 2012–28 Sep 2012 (351 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 4: 29 Sep 2012–31 Dec 2012 (352 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 5: 01 Jan 2013–31 Dec 2014 (289 KB)Download →monitoring · hosted copy · 1 KB
- Monitoring Report — Period 6: 01 Jan 2015–31 Dec 2015 (699 KB)Download →monitoring · hosted copy · 1 KB
- CDM Project 4734 Registry Page — CECIC Gansu Yumen Changma No.3 Wind Farm ProjectDownload →other · hosted copy · 1 KB
- Post-Registration Change PRC-4734-001 (Monitoring Plan Revision, approved 23 Oct 2012)Download →other · hosted copy · 1 KB
- Updated CA.pdfOpen →other · source link
- 728.ER calculation spreadsheet Changma No.3.xlsxOpen →other · source link
- 2020-03-18-CECIC Gansu Yumen Changma No.3Wind Farm Project-ER.xlsOpen →other · source link
- Attestation letter_PA4734_0003.pdfOpen →other · source link
- C1_728_PRR_14Mar2022.pdfOpen →other · source link
- CDM PDD-Changma No.3 Project.pdfOpen →other · source link
- Confirmation Letter.pdfOpen →other · source link
- ER-CECIC Gansu Yumen Changma No.3 Wind Farm Project.xlsOpen →other · source link
- V1_PRR_728_28 July 2022_.pdfOpen →other · source link
- VALID_STA_728_20OCT011.pdfOpen →other · source link
- VCS Validation Representation,--Changma No.3 Project.pdfOpen →other · source link
- VCS Verification Representation-Changma No.3 project.pdfOpen →other · source link
- Verification Certificate.pdfOpen →other · source link
- VERIF_STA_728_28JAN2011_27APR2011.pdfOpen →other · source link
- Issuance-Representation-Single-PP-v4.3 728.pdfOpen →other · source link
- PP_ISS_REP_728_28JAN2011_27APR2011.pdfOpen →other · source link
- PP_ISS_REP_728_28JAN2011_27APR2011.pdfOpen →other · source link
- VCS-Issuance Representation-CECIC.pdfOpen →other · source link
- VCS Issuance Representation-Changma No.3 Project.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1 728 RCP MP1.pdfOpen →other · source link
- VCS-Issuance-Representation-Single-Representor-v4.1.pdfOpen →other · source link
- VCU Conversion Deed of Representation, v3.2_0.-4734 signed.pdfOpen →other · source link
- 2020-06-28-VCS CECIC Gansu YumenChangma No.3 Wind Farm Project-Monitoring-Report-Template-v4.0.pdfDownload →monitoring · hosted copy · 660 KB
- 4734 Changma_MR_4_V02_130220.pdfDownload →monitoring · hosted copy · 353 KB
- ER calculation spreadsheet-Changma No.3-VCS-Ver 02.xlsDownload →monitoring · hosted copy · 17 KB
- MONIT_REP_728_28JAN2011_27APR2011.pdfDownload →monitoring · hosted copy · 451 KB
- MR-CECIC Gansu Yumen Changma No.3 Wind Farm Project_01012020_27012021.pdfDownload →monitoring · hosted copy · 801 KB
- MR-CECIC Gansu Yumen Changma No.3 Wind Farm Project-clean.pdfDownload →monitoring · hosted copy · 2,291 KB
- VCS 0728 CP2-V2-MR 01-Jan-2022 - 30-Apr-2023.pdfDownload →monitoring · hosted copy · 1,518 KB
- VCS Monitoring Report -Changma No.3 Project.pdfDownload →monitoring · hosted copy · 451 KB
- PROJ_DESC_728_20APR2011.pdfDownload →pdd · hosted copy · 722 KB
- Renewal PD - VCS 728-20220217-V02-clean.pdfDownload →pdd · hosted copy · 1,831 KB
- PP_REG_REP_728_20NOV2011.pdfOpen →other · source link
- PP_REG_REP_728_20NOV2011.pdfOpen →other · source link
- VCS Registration Representation-Changma No.3 project.pdfOpen →other · source link
- VCS-Registration-Representation-Single-Representor-728 RCP.pdfOpen →other · source link
- Validation-Report-CECIC Gansu Yumen Changma No.3 Wind Farm Project - VCS728-clean.pdfDownload →verification · hosted copy · 462 KB
- VALID_REP_728_20MAR2011.pdfDownload →verification · hosted copy · 706 KB
- VALID_REP_728_20MAR2011.pdfDownload →verification · hosted copy · 706 KB
- VALID_STA_728_20OCT011.pdfDownload →verification · hosted copy · 1,486 KB
- VCS-Validation-Representation-v4.1- VCS728.pdfDownload →verification · hosted copy · 104 KB
- Combined Verification and Certification Report.pdfDownload →verification · hosted copy · 1,751 KB
- VCS 0728 CP2-V2 -FVR 01-Jan-2022 - 30-Apr-2023.pdfDownload →verification · hosted copy · 890 KB
- VCS Verification Report-CECIC Changma No.3 Project.pdfDownload →verification · hosted copy · 161 KB
- VCS-Verification-Report- CECIC Gansu Yumen Changma No.3 Wind Farm Project - CTI-clean.pdfDownload →verification · hosted copy · 394 KB
- VCS-Verification-Report- CECIC Gansu Yumen Changma No.3 Wind Farm Project - CTI.pdfDownload →verification · hosted copy · 374 KB
- VCS-Verification-Report-Template Changma 3 Update.pdfDownload →verification · hosted copy · 269 KB
- VERIF_REP_728_28JAN2011_27APR2011.pdfDownload →verification · hosted copy · 161 KB
- VCS-Verification-Representation-v4.1 728 RCP MP1.pdfDownload →verification · hosted copy · 104 KB
- VCS-Verification-Representation-v4.1.pdfDownload →verification · hosted copy · 1,238 KB
- VCS-Verification-Representation-v4.1 VCS 728.pdfDownload →verification · hosted copy · 105 KB
- Verification_Representation_v4.2_VCS 728.pdfDownload →verification · hosted copy · 154 KB
- VERIF_STA_728_28JAN2011_27APR2011.pdfDownload →verification · hosted copy · 1,352 KB
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Wind →- BBBBundled Wind Power Project by Mytrah GroupIndia
- BBBBundled Wind Power Project in Tamilnadu, India, Co-ordinated by Tamilnadu Spinning Mills Association(TASMA-II)India
- BBBNingxia Xiangshan Wind Farm ProjectChina
- BBBWind Power Project in Tamil Nadu by Green Infra Renewable Energy LimitedIndia
- BBBBundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)India
- BBB300 MW Wind Energy Project by Green Infra Wind Energy LimitedIndia