Kocaeli Landfill Gas to Electricity Project
Waste Management · Landfill Methane · Türkiye
CORSIA-approved programmeDimension breakdown · CCP-aligned
An executive read on the rating, anomalies the rubric can’t see, and the diligence questions to put to the developer, generated over the full project record. Available on Pro.
Upgrade to ProReads the project's design, monitoring and verification documents where available, then tests the additionality argument, baseline, and quantification against the methodology, with quotes. Available on Pro.
Upgrade to ProProject documents
- GS1013 Project Page – Gold Standard Assurance PlatformOpen →other · source link
- Kocaeli Landfill Gas to Electricity Project – Carbon Footprint Ltd (secondary description)Download →other · hosted copy · 20 KB
- ACM0001 Large-scale Consolidated Methodology: Flaring or use of landfill gas – VerraDownload →methodology · hosted copy · 133 KB
- Yeşil Global Enerji – Plant Registry (Santraller page, developer disclosure)Download →other · hosted copy · 39 KB
- GS Passport_13-07-2010.pdf (Preliminary Review)Open →other · source link
- Kocaeli_GSV2.1_LSC_Report v1.1.doc (Preliminary Review)Open →other · source link
- (1)PDD PDD_13-08-2012.pdf (Design Review)Download →pdd · hosted copy · 962 KB
- Open →
- (1)Verification Report_1st monitoring period_01.03.2012 to 30.06.2013_rev1.3Aa.pdf (Performance Review no. 1)Download →verification · hosted copy · 914 KB
- (1)Monitoring Report_1st monitoring period_01.03.2012 to 30.06.2013_v7.pdf (Performance Review no. 1)Open →monitoring · source link
- FVR_14TQ67MD_GS_Ver_1.2Aa_31032015approved.pdf (Performance Review no. 2)Download →verification · hosted copy · 809 KB
- (2)Monitoring Report_2nd monitoring period_01.07.2013 to 30.09.2014_v6.doc (Performance Review no. 2)Open →monitoring · source link
- GS1013 Annual Report-Signed.pdf (Crediting Period Renewal no. 1)Open →other · source link
- GS 1013 RCP PDD_27072023.pdf (Crediting Period Renewal no. 1)Open →pdd · source link
- GS1013_IQ_SDG-Impact-Tool.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- T-VVB_V.1.0-Audit-Techniques_GS 1013_VAL_RCP_TQC(1).xlsx (Crediting Period Renewal no. 1)Open →other · source link
- FVR GS VAL-GS RCP-Kocaeli_GS 1013 TQC 50322_GS Review_R1_Aug 2024 - Clean(1).pdf (Crediting Period Renewal no. 1)Download →verification · hosted copy · 1,134 KB
- Open →
- GS1013_ER Sheet_V03_27072023.xlsx (Crediting Period Renewal no. 1)Open →other · source link
- FVR GS VAL-GS RCP-Kocaeli_GS 1013 TQC 50322 (1) (1).pdf (Crediting Period Renewal no. 1)Open →verification · source link
- GS1013_Project-Annual-Report_01.2024-11.2024.pdf (Annual Report no. 1)Open →other · source link
- AMP25-GSVV-0241_GS 1013_Verification Report_v04_25102025_clean.pdf (Performance Certification | Project no. 1)Open →verification · source link
- GS1013_Kocaeli Landfill_MR_5th Monitoring Period_v5.0_24.10.2025_clean.pdf (Performance Certification | Project no. 1)Open →monitoring · source link
- GS1013 Kocaeli Landfill _ER_Sheet_5th Monitoring Period_v3.0_08.10.2025.xlsx (Performance Certification | Project no. 1)Open →monitoring · source link
- GS1013_Kocaeli Landfill_MR_6th Monitoring Period_v4.0_22.04.2026.pdf (Performance Certification | Project no. 2)Open →monitoring · source link
- GS1013 Kocaeli Landfill _ER_Sheet_6th Monitoring Period_v1.0_05.03.2026.xlsx (Performance Certification | Project no. 2)Open →monitoring · source link
- GS1013_V1.3_IQ_SDG-Impact-tool_03.04.2026.xlsx (Performance Certification | Project no. 2)Open →other · source link
- FVR_GS_VER_REP_2026TQCE63_Kocaeli Landfill Gas to Electricity Project_Rev 1.2Aa_22042026.pdf (Performance Certification | Project no. 2)Open →verification · source link
Primary documents located by the document review. Hosted copies are served from CarbonDecode; source links open the original registry or developer page.
Gathers satellite and Earth-observation evidence (Global Forest Watch forest-loss, MethaneSAT/IMEO, published analyses) for the project area and assesses reversal and emissions anomalies, with sources. Available on Pro.
Upgrade to ProScoring rationale · auditable trail
See exactly why each dimension scored as it did, every rule, adjustment, and data point behind the grade. The auditable trail buyers and assurance teams need. Available on Pro.
Upgrade to ProRelated projects
All Landfill Methane →- ALANDFILL GAS EXTRACTION AND ELECTRICITY GENERATION PROJECT - ISTANBUL TURKEYTürkiye
- A*Mamak Landfill Waste Management Project TurkeyTürkiye
- AEcoparque Candeias Landfill Gas ProjectBrazil
- ASanta Marta Landfill Gas (LFG) Capture for Electricity Generation ProjectChile
- ACTL Landfill Gas ProjectBrazil
- AGS3434 Uberlândia landfills I and IIBrazil